ML20101C568

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B
ML20101C568
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/12/1996
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20101C567 List:
References
NUDOCS 9603190043
Download: ML20101C568 (10)


Text

-.

ATTACHMENT 3 TO TXX-96008 AFFECTED TECHNICAL SPECIFICATION PAGES PAGES: 3/4 6-1, 3/4 6-2, 3/4 6-3, 3/4 6-4, 3/4 6-5, 3/4 6-8, B 3/4 6-1, 6-20 388'%88!RZs83 abs P

PDR

's to TXX-96008

'Page-1 of 9 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY LIMITED CONDITION FOR OPERATION 3.6.1.1 Primary CONTAINMENT INTEGRITY shall be maintained.

APPLICABILITY: MODES 1, 2,.

3, and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY. restore CONTAINMENT INTEGRITY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.6.1.1 Primary CONTAINMENT INTEGRITY shall be demonstrated:

a.

At least once per 31 days by verifying that all penetrations

  • not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except as provided in Table 2.1.1 of the Technical Requirements Manual.

b.

By verifying that each containment air lock 1.

. compliance with the requirements of Specification 3.6.1.33, and c.

After M ch closing of cach penetration subject to Typc 0 testing, cxcept the containment air 1ccks if opened fclicwing a Type A cr 0 test, bj icak rate testing the scal with gas at a pressure net less than P,, 40.0 psig, and verifying that when the mcasured icok3;c rate for thcse seals is added to thc icekage rates determincd pursuant to Spccification 4.C.1.2d. for all other Typc 0 and C penetrations, the combincd leakag; ratc is icss than 0.00 b,--

Except valves, blind flanges, and deactivated automatic valves which are located inside the containment and are locked, sealed or otherwise secured in the closed posit nn.

These penetrations shall be verified closed during each COLD SHUTDOWN except that such verification need not be performed more often than once per 92 days.

The blind flange on the fuel transfer canal need not be verified closed except after each drainage of the canal.

COMANCHE PEAK - UNITS 1 AND 2 3/4 6-1

, Attachment 3 to TXX-96008 Page 2 of 9 CONTAINMENT SYSTEMS CONTAINMENT tEAKAGE LIMITED CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall beDlimited W accordancefwith theTContainment:LeakagelRate3TestjnglProgCams(referitonTechDical Sp.ecificat.1ondSectjoni618239)Pte-An overall intcgratcd icokage rate cf icss than or equal to c.

b, 0.10t by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at 9,. 40.0 psig.

b.

A ccmbined leakage rate cf 1000 than 0.50 L, for all pcnctrations and valvc3 subject to Typc 0 and C tests, when prc Curized te P,-

APPLICABJLITY.

MODES 1, 2, 3, and 4.

ACTION:

With cithcr the measured overall integrated containment leakage rate exceeding 170?LVl31 thin 111bou'rlinitiatelattion!to;beginJHOT! STANDBY wi thi ni the.in,exti61hou rsl a nd M NICOL DiSHUTD0WN;W1.%hi nit heffollow1 pg;30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />si0.75 L,, or the acesured combincd lcakagc rate for all pcnctrations and valvcs subjcct to Typc3 0 and C tcsts cxcceding 0.00 b,- Reestore the overall integrated leakage rate to less than orgequa) to 0.75 L, and the combined leakage rate for all penetrations subject to Type B and C tests to less than pt,;equaEto 0.60 L, prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in conformance with the criteria specified in the' Containment Leakage? Rate; Testing: Program

( re fe rito;Techni ca l ?Speci fj cati on; Secti on16;6 ; 3g texceptna s inoted

)

below: Appendix J cf 10CIR00.

a.

Thrcc Typc A tcsts (Cverall Integrated Containment Leakage Ratc) shall bc canductcd at 40 _ 10 month intcrvals during shutdowr at prc::urc 90t 10;; th r P,.

40.2 p;;g during each 10-ycar scrvice pcriod.

Thc third tcst of cach act shall bc conductcd during the shutdown for the 10-year plant n r: c m cc l,r g c:l a r, i

COMANCHE PEAK - UNITS 1 AND 2 3/4 6-2 Unit 1 - Amendment No. 14

m

_ to TXX-96008

~

l Page 3 of 9 l

CONTAINMENT SYSTEMS i

SURVEILLANCE REQUIREMENTS (Continued) t l

b.

If any periodic Type ? test fails to,cet 0 7E L,, the tcst schcdule for subsequent Typc A tests-shall bc rcvicwcd and

^pprov^d by the Commission.

If two cons,ccutivc Typc A t^3t3

,, a..

+-

m_,-+

n..,. e.

i,,.

m,,..__

o.__.

_u,,

m.

u gs n vsom soui, um vs

.v.mmm uv icast cycry 10 months until two consccutivc Typc A tcite

n..,re.

a..u

_ u.: __

tu_

u_._

__u_;..,_

__.u_

m m,..

6g ub Hil l bil U t ilaL Llib uUvVb bbJ6 ebilLuusb, 814mJ UU u ii w w.

___.._.a.

,movmmm.

c.

The accuracy of co-h Typc A test shall bc v^rified by a suppicmcatal test which; 1)

Confirms the ac, curacy of the tcst by verifying that

+ s. -.m-,-m..~...

m-+,

+m-+

. - -.., +

i e,

,e

.m ummv.uuuuU rr..

with thc appropriatc fclicwing cauction.

li

/1 ii s n SE I,_

i l"c

\\"a ne l v

's

..M.. a e n i.

4. r

+ b,, a m,a.m e r i e n A

%,,, n n

, a s L.m% n a

.s n. A I, 1

A

+ar+

, m r

m mm 3

.. m

,o the superimpcscd icak; 1

2) llas a duration sufficient to catablish accurately the ehangc in lcakagc retc bctwcca thc Typc A test and thc supplcmcntal test; and 3)

Requires that the rate et which gas is injcctcd into the containment or bicd from the containment duevng the supplemental test is between 0.75 L, and 1.25 Lg-d.

Typc,,0 and C tests shall bc conducted with gas at a picssurc u., _i n,,

,n

__2_

o.

..__a__

.u__

--+

.ii i i 7v.v yany, u6 inwwi vusa uv yiwuwwi wiiuis m,

uv.

is 1

___.u_

s__

Bilvil 4 4 3 J LAbCfb I vi bbJbJ 334Vv4 V I483 1)

Air lock,

2)

Containmcat ventv+ation isciation valves with resilient matcrial scels, 0)

Cafcty injcction valvcs as spccificd in Spccification

,.. e

-_2

.v.

.my, muu

[

c__

a.__so_.

____: : _a o g. u,..

.. orme.c. mu c___:, _. :__

i svusu om m

Vu.Vs, u,

.o sece... sum.vo

, r,

,u a.e.

Air locks sha i be tested and demonstrated OPERABLE by the requirements of Specification 4.6.1.3:

(

hf.

Containment ventilation isolation valves with resilient l

material seals shall be tested and demonstrated OPERABLE by the requirements of Specification 4.6.1.7.2 or 4.6.1.7.3, as applicable; cg.

Safety injection valves 8809A, 8809B and 8840 shall be leak tested with a gas at a pressure not less than P 48.3 psig, or with water at a pressure not less than 1.1 P., at intervals deffned OnithetContainmentLLeakage Rate: Testing PIog ramH re fe titogechni c al ; Spec 1 fi c a tioESecti on:6; 8;39 )J no grcatcr than 24 months; dn.

Containment spray valves HV-4776. HV-4777, CT-142 and CT-145 shall be leak tested with water at a pressure not less than 1.1 P,. at intervals definedTinTthe1 Containment 1LeakageLRate Testing. Program (refetito;Technica];SpecificationfSection 6;8?39) et greatcr than 24 month w and i

et.

The provisions of Specification 4.0.2 are net applicable on11:t0:41 COMANCHE PEAK - UNITS 1 AND 2 3/4 6-3 Unit 1 - Amendment No. 14 i

. Attachment 3 to TXX-96008 Page 4 of 9 CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITED CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with; a.

Oboth doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closeds, and b.

An cvcroll air lock leakage ratc of icas than or cqual to 0-06-1, a t P,,

40. 3 ps i g.

l APPLICABILITY MODES 1, 2, 3, and 4.

{

ACTION:

a.

With one containment air lock door inoperable:

1.

Maintain at least the OPERABLE air lock door closed and either restore the inoperable air lock door to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or lock the OPERABLE air lock door closed:

2.

Operation may then continue until performance of the next required overall air lock leakage test provided that the OPERABLE air lock door is verified to be locked closed at least once per 31 days; 3.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and 4.

The provisions of Specification 3.0.4 are not applicable.

b.

With the containment air lock inoperable, except as the result of an inoperable air lo:k door, maintain at least one air lock door closed; restore the inoperable air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

COMANCHE PEAK - UNITS 1 AND 2 3/4 6-4

, Attachment 3 to TXX-96008 Page 5 of 9 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containnent air lock shall be demonstrated OPERABLE:

a.

By;. verifying 11eakageirates : 1n'accordance:With the C00tainmentiLeakage~ Rate: Testing Program (refer to; Technical.

c Specification.Section 6:.8;3gT;L'.iithin 72 hcurs felicwing ca^h closing. cxccpt when the air lock is bcing used for multipic entrics, then at lcast on^c pcr 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by vee +4y'ng ; cal leakage is less than 0.01 L, as dctcrmincd by prccision flow mcasurcmcats w,1cn measured for at icast se teecnds with the volumc bctwcca thc scels at a constant prcasurc of grcatcr than cr cqual to 40.3 psig, b.

By conducting cycroll air lock icakagc tcsts at not icss than P,, 40.3 psig, and verifying thc cicrall air lock leakagc ratc is,iithin its limit l'

At icast oncc pcr C months,' and es n_2__

m _. a., 2

_m__

cnurovuorum, om r e n, m s,

. m__

L/

I I I \\/ 3 bv L J L U L/ 8 I Jil I lig b, Vil l (7 41 U 16. 81 I A ll I LuiT A 1 i TV l i U 3 I maintcnancc has bccn pcrformed on thc air lock that cculd af fcct the air lock scaling capability."

be.

At least once per 6 months by verifying that only one door in each air lock can be opened at a time.

I 4

I O

I IO a

5 5

h This cpic nnt; an exc ptico tc 10Cr5 0 Aprodix J. paragraph

?TT N, / L. \\ f ; ; \\

444. U.LiU/ \\ 3 i /.

COMANCHE PEAK - UNITS 1 AfiD 2 3/4 6-5

L. to TXX-96008

'Page 6 of 9-CONTAINMENT SYSTEMS CONTAINMENT STRUCTURAL INTEGRITY LIMITED CONDITION FOR OPERATION j

3.6.1.6 The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.1.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.6.1.6.1 Containment Surfaces. The structural integrity of the i

exposed accessible interior and exterior surfaces of the containment.

including the liner plate, shall be determined during the shutdown fee coch Typc A contain;;nt icekoge rate test (reference Specification 4.5.1.2' by a visual inspection of these surfaces.

This inspection 1

[

shall be performed insaccordancelW1.th:th'7Contalpmentiteakage[ Rate e

Iesting! Program Irefersto1TechnicallSpecification;Section16]8(391 petee to thc Type A containment icokagc rate test to verify no apparent changes in appearance or other abnormal degradation.

4.6.1.6.2 Reoorts. Any abnormal degradation of the containment structure detected during the above required inspections shall be reported to the Commission in a Special Report pursuant to Specification i

6.9.2 within 15 days.

This report shall include a description of the condition of the concrete, the inspection procedure, the tolerances on l

cracking, and the corrective actions taken.

1 i

i 1

i i

i COMANCHE PEAK - UNITS 1 AND 2 3/4 6 8 4

I to TXX-96008

'Page 7 of 9 3/4.6 CONTAINMENT SYSTEMS BASES 3/4.6.1 PRIMARY CONTAINMENT l

l 3/4.6.1.1 CONTAINMENT INTEGRITY l

1 Primary CONTAINMENT INTEGRITY ensures that the release of I

radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in.the safety analyses.

This restriction, in conjunction with the leakage rate l

limitation, will limit the EXCLUSION AREA BOUNDARY radiation doses to

)

within the dose guideline values of 10CFR100 during accident conditions.

3/4.6.1.2 CONTAINMENT LEAKAGE The limitations on containment leakage ratesEasIspecifiedlinith(

Containment Leakage;RateXTest1Ag;P;togram M ierZto1Techn1 pal Specification 1Section261813g)3 ensure that the total containment leakage volume will not exceed the value assumed in the safety analyses at the i

peak accident pressure, P acceptance gtttetionirsM.

Then.ovetalliconta.inment"I]eakage:ratt 110;L',Q As an added conservatism, the measured overall integrated leakage rate is further limited to less than or equal to 0.75 L during performance of the periodic test to account l

for possible degradation of the containment leakage barriers between l

leakage tests.

For specific system configurations, credit may be taken for a 30-day water seal that will be maintained to prevent containment atmosphere leakage through the penetrations to the environment.

The following is a list of the containment isolation valves that meet this system configuration and the Maximum Allowed Leakage Rate (MALR) required to maintain the water seal for 30 days.

l i

ya)ve No.

MLR(cc/hr) 1-8809A 77 1-8809B 77 2-8809A 75 2-8809B 73 1-8840 2577 2-8840 2382 CT-142 4734 CT-145 4734 HV-4776 4734

(

HV-4777 4734 l

1 The surveillance testing for measuring leakage ratesMasispecified i nitheiContai nmen t Tea kage1Ra te%Te sting Rrogtsm Meferit0Hechni ca ).

Specification 2 Sect 10n1678?39D is consistent w1th RegKGuide212163?S1995 andithe reauirements of Opt.joEB;of 10CFR50 Appendix J.

}

1 CCMANCHE PEAK - UNITS 1 AND 2 0 3/4 6-1 Unit 1 - Amendment No. 14 3

Attachment'3 to TXX 96008

'Page 8 of 9 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 3)

Participation in a Interlaboratory Comparison Program to ensure that independent checks on the precision and accuracy of the measurements of radioactive materials in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.

gj MaeP Rats $Testi na'Proachm A' programIs ha l l Cbe?.establ i sheditoI1 mpl ement%theReakageIrate testingsofsthercontainment;asIrequiredibyZ10CFR5015A(oKan.d 10CFR50R Appendix 9 K 0ption:B Ras: modified:bylapproved!; exemptions E This;ptogram shallsbeziraccordanceiwith:theXguideltetsrconta10ed iniRegulatoryiGuide!!101632]Per.formanceiBasedLContajnment2 Leak 3 IestiRtogramEdated2Septembet11995:2 l

I l

l l

j i

j i

l

)

i COMANCHE PEAK - UNITS 1 AND 2 6-17 Unit 1 - Amendment No. 42 Unit 2 - Amendment No. 28 i

- to TXX-96008 l

  • Page 9 of 9 l

ADMINISTRATIVE CONTROLS l.

i PROCEDURES AND PROGRAMS (Continued) l ELMTherpea kic al cul ated? cont a i nmentlI10terna H p ressiateltogthe,C#e'sj gG ba sis 21 os slottc oo.! aDtf acci dentCEJ11.sj3.8.llWpsig%

PIERSIheZ ma xi mum 7;al l oWableiconta i nmentil ea k egeira teH LWAt W,Esha]l be 0210 Eof 1contajnment2altEweight2peridayJ I E sj Eeakageirate acceptance 1ctj1terjaIate]

EZ;CilEECont a i nmentMeak agelrat.el a c cept a ncejc rj te ti on ti;sM17,0 AZ$

pu r.i ngit helfits t? uni t;s ta ttup:fol l owi ng;tes t i ng M n accordanceWith3thisIprogram;ithe5]eakagelratelacceptance!

l ctiterf afiareM0160Zt:storitbegype;8:andsIype10itestsIaod3, OR 51U,;tomType % testsf Ei H275M A1 T21ockitest1Agla ccept a ccelc ti teti aZa te i l

iL1, ?;E2a E:"H 0keral 13a i r31 oc kHJ ea k a ge;tatEldi201051 Edwhen testedia.t1GPA EL MG BETE Fontea chIdoorEl ea k ageirateli sR0[015U4When pressuti.zeditoMPa m a sThe?provisionsIof? Specification W OJ2IdoInot7applyltolthe! test f req'uenci ests pec1.fj ed 510;t helConta i nment1 Leak age 3 ate 1 Testing P rog ram ;sMi th ithe g excepti on tofithenconta i nmentsydnti l ati ort j so] atj on!. Valves;iWhj c hi151s peci fied E1ESpecifi c ati.oDJ s!A162EZ and % #I1G i3 &1 ErFEThe[provj s i orisXof1Speci ficati oE4 :073 fare?applj c a bl eitosthe Cont ainment1 Lea k age;10.te3Testi ng: P tog tem]

6.9 REPORTING REQUIREMENTS ROUTINE REPORTS l

6.9.1 In addition to the applicable reporting requirements of Title 10.

Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the Regional Office of the NRC unless otherwise noted.

i i

1 4

COMANCHE PEAK - UNITS 1 AND 2 6-17a Unit 1 - Amendment No. 42 Unit 2 - Amendment No. 28 i

.-