Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
m _.
. 0 4
P.O. Ben eastee, Miami, n, mies.steo C ' . ",
L-90-378 EE 10 CFR'50.54 10 CFR 73.21-U. S. Nuclear Regulatory Cummission Attn: Document Control Desk NOV 0 51990 Washington, D. C. 20555-Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Guard Training and Qualification Plan Revision-8 S.1dmittal Under 10'CFR 50.54 fo)
Florida Power and Light Company (FPL).'has issued Revision 8 to the Turkey Point Training and Qualification Plan and has determined that the revision does not decrease the safeguards effectiveness of the plan. Pursuant to 10'CFR 50.54 (p), a description 'of the revision and copies PTNTQP-R08-4 through PTNTQP-R08-7 of the' plan are enclosed.
Enclosure 1 to this letter is a listing cf changes incorporated in a set of marked-up Revision -7 pages., . Enclosure 2 'contains directions for incorporating Revision 8 and copies of Revision 8' of the plan.
The enclosed material does not contain safeguards-information.. .
By copies of this letter, we are forwarding. copies'of PTNTQP-R08-2 and 3 to the Nuc. tear Regulatory Commission', Region ~II.
Very truly yours, k
T. F. Plunkett
~
Vice President Turkey Point Plant Nuclear KNH/DPS/ds >
Enclosures cc: Stewart D. Ebneter, Regional Administrator, Region II',JUSNRC (2 copies) .
j Senior Resident Inspector, USNRC, Turkey Point Plant . (with ;
L enclosure 1.only) l <
9011140249 901105 0 DR ADOCK 0500 .
. I an FPL Group company }
-a - .s .+m ,
44y .a a e I
O p .
i e i I
l
- * . , . J I
a b
h l
l 1
l ENCLOSURE 1 1
1 l
1 t
1-( .'
I l
.)
I i
i
.i 1 PLANT TURKEY POINT i TRAINING AND QUALIFICATIONS PLAN ,
i REASONS FOR REVISIONS l l
REVISION 8 .i I
EAGE EAB& DESCRIPTION REASON FOR REVISION i i
COVER N/A DENOTING REV. 8 REV. B l l
'l l
SR N/A DATE OF~ APPROVAL REV. B l LEP N/A REVISED PAGE LIST REV. 8 1
1-1 1.3 CLARIFY POSITIONS . CLARITY 2-7 2.4.1 DELETED ADDITIONAL ADtdINISTRATIVE TIME ;
FCR AGILITY TESTING. ONE HOUR TIME LIMIT 4-1 4.1 ADDITION THAT ARMED PERSONNEL ARE TO BE ARMED NITH ONLY THE il i TYPE OF WEAPON-THEY - !
ARE QUALIFIED WITH. CLARIFICATION *
-)
l
.1 -
l l 4
l
't i
9 I
i I
- j l l 1
.i I
O g :
l e :
e I e
e 9 9 ,9 l 9 g .g ]
I '
l I
'd t
i l
P ENCLOSURE 2 1
i t
1
.i
, ' 'h. '
PLAN 1' TURREY POINT .:
TRAINING AND QUALIFICATIONS PIAN >
REASONS FOR REVISIONS i REVISION 8 j i
RAGE EAB& DESCRIPTION REASON FOR REVISION l COVER N/A DENOTING REV. 8 REV. 8 '
SR N/A. DATE OF APPROVAL REV. 8 !
LEP N/A REVISED PAGE LIST 'REV. 8 1-1 1.3 CLARIFY POSITIONS CLARIT
P 2-7 2.4.1 DELETED ADDITIONAL l ADMINISTRATIVE TIME FOR AGILITY TESTING.. ONE HOUR TIME LIMIT 4-1 4.1 ADDITION:THAT ARMED t PERSONNEL ARE TO BE !
ARMED WITH ONLY THE l TYPE OF WEAPON THEY ARE QUALIFIED WITH. CLARIFICATION i
i I
I >
l
?
i i
t
INSTRUCTIONS FOR INCORPORATING PTNTQP REVISION 8 Please update your copy of this document by removing appropriate pages and replacing them with the revised pages enclosed as indicated below.
SUPERSEDED PAGE REVISED PAGE Cover Page R/7 . Caver Page R/8 SR R/7 SR R/8 LEP 1
- R/4 LEP'l R/8 1-1 R/7 1-1 R/8 2-7 R/7 2-7-. R/8 4-1 R/7 4-1 R/8 l
i
. - - .-- ---- :: ; l l .
i TRAINING AND QUALIFICATION PLAN
- i l TURKEY P0 INT PLANT l
FLORIDA POWER AND. LIGHT COMPANY
% w des SERIAL NUMBER -PTNTOP-R As a recipient of this' document, you are res >onsible for affording proper controls anc safeguards for the protection of all infomation contained herein at all times.
THIS' DOC ENT SHALL NOT BE DUPLICATED OR ED WITHOUT AUTHORIZATION REP PREPARED BY: h DATE:
- REVIEWED BY: Mh re. Manager / Nuclear os'o2 9e i Security: Dept. Date 4
REVIEWED BY: Turkey Point Plant Nuc1 ear Safety Committee # [d-/J9 APPROVED B
'~
ALL Chaiman PNSC Turkey Point < ,
f!d(6)
/Date APPROVED BY: _
Plant Manager Turkey Point
/'Dete
/r fle '
b l
APPROVED BY: M - Vice President ,h4!96-Turkey. Point T-y 'pate PTNTQP ,
REV g
/h v
~ 2 s . ;
, i 4 , ,. '
~ l SUBNITTED REVISIONS TURKEY POINT PLANT 4 TRAINING AND QUALIFICATION PLAN SURNISSIONS D&IE Revision 0 ,08/17/79 Revision 1 04/27/81. ]
Revision 2 06/22/81 Revision 3 02/08/85 Revision 4 10/30/86 ,
l Revision 5 08/16/88 J Revision 6 06/09/89-htyf~ t.L !< {..
- ?~Jg ggy0.
hulptoH W y XX-XX-?'$
t I
1
^
e I *
%- g SR-N PTNTQP REV.j[ [
og- .
-. 1
- -} '
'1 l
CHAPTER 1 - INTRODUCTION
. .,' i
1.1 INTRODUCTION
In accordance with the requirements of 10 CFR 73.55', Appendix 8, this Training and Qualification Plan outlines the process by which security force personnel assigned to Florida Power and Light Company's (FPL) Turkey Point Plant are selected, trained, tested and qualified. '
Upgraded training requirements. submitted in Revision .07 ~ of this document shall be fully implemented within twelve months ofLthe date .
- Revision 07 is approved by the Site Vice President - Turkey Point, j l
)
1.2 OBJECTIVE l
The objective of this plan;is to ensuri that the security force !
is capable of performing assign,ed crucial tasks necessary to implement- l Turkey Point's Physt, cal Security.and Safeguards: Contingency plans. j l l f
l~
1.3 SCOPE This plan applies to the crucial -tasks identified 'and' the
' security personnel whose. positidns appear- in the Responsibility
, Matrix, Appendix A. This plan is not applicable to nor doe; it imply-t h a training program for FPL and contractor management. positions. WE
/hsi&rts M*~ Domwas My mm9ew &W5 o
my spews, ut Apewca A. ,
s s
, 1-1 + .
'REV.g 2r
,F .
responsible management personnel and by a professionally trained and licensed individual. If a verifying examination is performed which reveals no condition. which would interfere with the.
perfomance of assigned duties, the individual shall be permitted to continue assigned duties.
2.4 PHYSICAL FITNESS QUALIFICATIONS ,,
Subject to a prior physical examination conducted by a licensed physician and written certification that there are no medical reasons to preclude participation by the individual, ' armed personnel shall take a job related physical fitness test' before being assigned armed-duties.
2.4.1 Initial Qualification-
.s @
On initial qualifichion, all members of the security force shall demonstrale performance of Litems 1 through 5 below within a one (1) hour time . limit. ' er?c : ::d tr :::t.g .,. I Kraci7;; :: :; ;- meren ritec t!=- r:g;i;;d te t7 era;;;t ni e ae-e!,; reen:t :t; tt; "r;t;;;;i Ar;;. "Or th::: it r : thi;h. !
3"?t i: ;;rfer:d-:: cit: the!! act M een ite:d :: ;;,;t n' the e=e (t> h: r rastin::t 5 ::y:r, :: 5 tr:::;;;b;;?pec;;;;ir.;p C
=:h:11 S= c:Octsi 2 x;+j!H irmuroepe ,id I
- 1. Climb up and down 35 foot ladder.
- 2. Climb up and down 40 feet of, stairway within three (3) J minutes, .
- 3. Run 440 yards in.t'wo (2) minutes .- _.
PTNTQPz.
2- 7 .
'REVg-oc
..;..<.. . s , _ u
- g. . s .. .. ._ . , ,_ _ ._
1 L
1 CHAPTER 4 - FIREAfg45 1
^
! 4.1 ' TRAINING -
i l
Security force personne1' assigned in an amedLeapacity shall be i
trained and demonstrate proficiency in, the use of firearms (shown by.
duty position in Appendix A of this document) by achieving a passing._ i score prescribed in the Conditions and StandardsEfor' qualification 4 involving live fire as defined in. Appendix 8 of this document.
Fireams qualification includes familiarization firin for' night and
'jQdh'&w'#$i>>$fN'?i$ #
$'e~y # SAIf enia. ..
All firearms qualification courses described:in Appendix 8 of this document have been registered with, and approved by, the National Rifle Association. Approval letters are maintained and available for inspection. -
s.
.. )
4.2 QUALIFICATION /REQUALIFICATION-
)
Amed members of the security force will qualify with each 1
firearm required by duty position prior to assignment' to-such armed duty and every twelve (12) months,thereafter.:
l 4.3 SECURITY FORCE EQUIPMENT-1 Members of the security' force arp provided equipment in accordance with the provisions of the approved Turkey Point. Physical -
Security Plan.
~- 'PTNTQP' 4-1 '... F REVg oy1
. . .