MONTHYEARML20065J8881990-10-23023 October 1990 Training & Qualification Plan Turkey Point Plant Florida Power & Light Co,Rev 8. Serial Number -PTNTOP-R08-4 ML17341A9871981-11-19019 November 1981 Administrative Procedure 0300, Hot License Operator Training Program. ML17341A9881981-08-20020 August 1981 Administrative Procedure 0301, Licensed Operator Requalification Program. 1990-10-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
. _ _ _
a
. .- i l"
i TRAINING AND QUALIFICATION PLAN 1 I
I I !
TURKEY: POINT PLANT j L !
l !
FLORIDA POWER AND LIGHT COMPANY !
( !
RUll!EI4REEEM j SERIAL NUMBER--PTNTOP-R08- T ;
i As a recipient of this' document, you are 1 responsible for affording proper controls 1 and safeguards for the protection of-all information contained herein at all times.
1 THIS DOCUMENT SHALL NOT BE DUPLICATED OR REPRODUCED.WITHOUT AUTHORIZATION i l
PREPARED BY: F.R. Tiinnons =DATE: 10-04-90 l REVIEWED BY: k Manager / Nuclear-Security-Dept.
IDlohlkd Date.
j g -l ,
I REVIEWED BY: Turkey Point Plant Nuclear.
Safety Committee #' 04/e l APPROVED BY: .4 - Chairman PNSC N I Turkey Point '
'Date i APPROVED B
// , e Plant Manager. /C 9 0- -
Turkey Point- / Date j q
APPROVED BY: Vice President /o/z VPd .
Turkey Point ' ' Date ;
J 901114o292 DR poitos '
PTNTQP ll ADOCK c5 coo 2so REV.08: 1 PDC q
- - i
, 1 SUBMITTED REVISIONS TURKEY POINT PLANT TRAINING' AND QUALIFICATION PLAN SUBMISSIONS D6IE Revision 0 08/17/79 Revision 1 04/27/81 Revision 2 06/22/81 Revision 3 02/08/85 Revision 4 10/30/86 i a
Revision 5 -
08/16/88 Revision 6 06/09/89 Revision 7 05/03/90-Revision;89ESSgS: Dag;;ggggggggggggg;gggglfpI10/23/90 a
i SR PTNTOP-REV.08 9
l ,.
LIST OF EFFECTIVE'PAGES TURKEY POINT PIANT TRAINING AND QUALIFICATIONS PIAN REVISION 8 ggig REVISION COVER 8 SR 8 LEP 8 i thru lii 7 1-1 8 2-1 thru 2-6 7.
2-7 8 2-8 7 3-1 thru 3-2 7 4-1 8 4-2 7 5-1 _7 A-1 thru A-8 7 B-1 thru-B-21 7 C-1 thru C-85 7 D-1 thru D-2 7 LEP-1
t .
CHAPTER 1 - INTRODUCTION
1.1 INTRODUCTION
In accordance with the requirements of 10 CFR 73.55, Appendix B, this Training and Qualification Plan outlines the process by which security force personnel assigned to Florida Power and. Light Company's (FPL) Turkey Point Plant are selected, trained, tested and qualified.
Upgraded training requirements- submitted in.- Revision: 07 of this document shall be fully-implemented within twelve ' months .of:
the date Revision 07 is approved by the Site -Vice President -
Turkey Point.
1.2 OBJECTIVE The objective of this. plan is to ensure that the security force is capable of performing assigned crucial tasks:necessary to implement Turkey Point's Physical Security.and Safeguards Contin-gency plans.
1.3 SCOPE This plan applies to the crucial tasks- identified' and the.
security personnel whose positions appear .in the Responsibility Matrix, Appendix A. This plan is. not applicable. to nor does: it imply a training program for FPL and contractor management.
positions. FPMinEC6Affi@@]4ElaiMN13 MAR 1)@MEtli6se p6siIIbnsis6MM@ldjiX@B}iflsijii61s((il@{ilii@jgMsjaiit E -
1-1 PTNTQP.
REV.08
t .
responsible management personnel and by a professionally trained and licensed individual. If a verifying examination is performed which reveals no condition which- would interfere with the performance of assigned duties, the individual shall be permitted' to continue assigned duties.
2.4 PHYSICAL FITNESS QUALIFICATIONS Subject to a prior physical examination conducted by a-licens-ed physician and written certification -that there are no medical reasons to preclude participation by.the individual, armed person-nel shall take a job related physical fitness test before being i assigned armed duties.
2.4.1 Initial Queiification On initial qualification, all members of the security force shall demonstrate performance of items 1 through 5 below within a one (1) hour time limit; [5 E ll3 E @ M E Z [ E M M2EEIE52i2225fE$((I[222 DEI $I2?E$U3553I$ICIIEESE3@ES
- 1. Climb up and down 35. foot ladder, i
i
- 2. Climb up and down 40 feet of stairway within three (3) minutes.
- 3. Run 440 yards in two (2) minutes.
2-7 PTNTQP.
REV.08 j
CHAPTER 4 - FIREARMS 4.1 TRAINING Securit'y force personnel assigned in an armed-capacity shall be trained and demonstrate' proficiency' in the use of firearms (shown by duty position in Appendix ' A of this document) by achieving a passing score- prescribed in- the Conditions and.
Standards for qualification ' involving live. fire as defined in Appendix B of this document. Firearms. qualification includes
' amiliarization firing for night and stress conditions. $1@fjff f
6'i f i s k P S 3 1 1 1 E N E N 6 N I M E M E $ E S 3 $ 5 N II $ f 5 5 5 5 N $ 3 1.t $ 5 5 M 5 h 16sDiiiEsiiEEERNIEWH!!ffeE All firearms qualification courses described in Appendix B o' f this document have been registered -with, and approved by, the National Rifle Association. Approval. letters are maintained .and available for inspection.
4.2 QUALIFICATION /REQUALIFICATION Armed members of the security force will, qualify with each firearm required by duty position prior to' assignment to such armed duty and every twelve (12) months thereafter.
4.3 SECURITY FORCE EQUIPMENT Members of the security. force are provided equipment in accordance with the provisions .of the. approved Turkey Point Physical Security Plan.
1 PTNTQP REV.2
l i t ,
,a .
PLANT TURKEY POINT TRAINING AND QUALIFICATIONS PLAN REASONS FOR REVISIONS REVISION 8 E& fag R&B& DESCRIPTION REASON FOR REVISION COVER N/A DENOTING REV. 8 REV. 8 SR N/A DATE OF APPROVAL REV. 8-LEP N/A REVISED PAGE LIST REV. 8 1-1 1.3 CLARIFY POSITIONS CtARITY 2-7 2.4.1 DELETED ADDITIONAL-ADMINISTRATIVE TIME-FOR AGILITY TESTIt'".. ONE HOUR TIME' LIMIT-4-1 4.1 ADDITION THAT ARMED PERSONNEL ARE TO BE ARMED WITH ONLY THE.
TYPE OF WEAPON THEY ARE QUALIFIED WITH. CLARIFICATION.-
s e
i