ML20065J888

From kanterella
Jump to navigation Jump to search
Training & Qualification Plan Turkey Point Plant Florida Power & Light Co,Rev 8. Serial Number -PTNTOP-R08-4
ML20065J888
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/23/1990
From: Timmons F
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20065J867 List:
References
NUDOCS 9011140292
Download: ML20065J888 (7)


Text

. _ _ _

a

. .- i l"

i TRAINING AND QUALIFICATION PLAN 1 I

I I  !

TURKEY: POINT PLANT j L  !

l  !

FLORIDA POWER AND LIGHT COMPANY  !

(  !

RUll!EI4REEEM j SERIAL NUMBER--PTNTOP-R08- T  ;

i As a recipient of this' document, you are 1 responsible for affording proper controls 1 and safeguards for the protection of-all information contained herein at all times.

1 THIS DOCUMENT SHALL NOT BE DUPLICATED OR REPRODUCED.WITHOUT AUTHORIZATION i l

PREPARED BY: F.R. Tiinnons =DATE: 10-04-90 l REVIEWED BY: k Manager / Nuclear-Security-Dept.

IDlohlkd Date.

j g -l ,

I REVIEWED BY: Turkey Point Plant Nuclear.

Safety Committee #' 04/e l APPROVED BY: .4 - Chairman PNSC N I Turkey Point '

'Date i APPROVED B

// , e Plant Manager. /C 9 0- -

Turkey Point- / Date j q

APPROVED BY: Vice President /o/z VPd .

Turkey Point ' ' Date  ;

J 901114o292 DR poitos '

PTNTQP ll ADOCK c5 coo 2so REV.08: 1 PDC q

- - i

, 1 SUBMITTED REVISIONS TURKEY POINT PLANT TRAINING' AND QUALIFICATION PLAN SUBMISSIONS D6IE Revision 0 08/17/79 Revision 1 04/27/81 Revision 2 06/22/81 Revision 3 02/08/85 Revision 4 10/30/86 i a

Revision 5 -

08/16/88 Revision 6 06/09/89 Revision 7 05/03/90-Revision;89ESSgS: Dag;;ggggggggggggg;gggglfpI10/23/90 a

i SR PTNTOP-REV.08 9

l ,.

LIST OF EFFECTIVE'PAGES TURKEY POINT PIANT TRAINING AND QUALIFICATIONS PIAN REVISION 8 ggig REVISION COVER 8 SR 8 LEP 8 i thru lii 7 1-1 8 2-1 thru 2-6 7.

2-7 8 2-8 7 3-1 thru 3-2 7 4-1 8 4-2 7 5-1 _7 A-1 thru A-8 7 B-1 thru-B-21 7 C-1 thru C-85 7 D-1 thru D-2 7 LEP-1

t .

CHAPTER 1 - INTRODUCTION

1.1 INTRODUCTION

In accordance with the requirements of 10 CFR 73.55, Appendix B, this Training and Qualification Plan outlines the process by which security force personnel assigned to Florida Power and. Light Company's (FPL) Turkey Point Plant are selected, trained, tested and qualified.

Upgraded training requirements- submitted in.- Revision: 07 of this document shall be fully-implemented within twelve ' months .of:

the date Revision 07 is approved by the Site -Vice President -

Turkey Point.

1.2 OBJECTIVE The objective of this. plan is to ensure that the security force is capable of performing assigned crucial tasks:necessary to implement Turkey Point's Physical Security.and Safeguards Contin-gency plans.

1.3 SCOPE This plan applies to the crucial tasks- identified' and the.

security personnel whose positions appear .in the Responsibility Matrix, Appendix A. This plan is. not applicable. to nor does: it imply a training program for FPL and contractor management.

positions. FPMinEC6Affi@@]4ElaiMN13 MAR 1)@MEtli6se p6siIIbnsis6MM@ldjiX@B}iflsijii61s((il@{ilii@jgMsjaiit E -

1-1 PTNTQP.

REV.08

t .

responsible management personnel and by a professionally trained and licensed individual. If a verifying examination is performed which reveals no condition which- would interfere with the performance of assigned duties, the individual shall be permitted' to continue assigned duties.

2.4 PHYSICAL FITNESS QUALIFICATIONS Subject to a prior physical examination conducted by a-licens-ed physician and written certification -that there are no medical reasons to preclude participation by.the individual, armed person-nel shall take a job related physical fitness test before being i assigned armed duties.

2.4.1 Initial Queiification On initial qualification, all members of the security force shall demonstrate performance of items 1 through 5 below within a one (1) hour time limit; [5 E ll3 E @ M E Z [ E M M2EEIE52i2225fE$((I[222 DEI $I2?E$U3553I$ICIIEESE3@ES

1. Climb up and down 35. foot ladder, i

i

2. Climb up and down 40 feet of stairway within three (3) minutes.
3. Run 440 yards in two (2) minutes.

2-7 PTNTQP.

REV.08 j

CHAPTER 4 - FIREARMS 4.1 TRAINING Securit'y force personnel assigned in an armed-capacity shall be trained and demonstrate' proficiency' in the use of firearms (shown by duty position in Appendix ' A of this document) by achieving a passing score- prescribed in- the Conditions and.

Standards for qualification ' involving live. fire as defined in Appendix B of this document. Firearms. qualification includes

' amiliarization firing for night and stress conditions. $1@fjff f

6'i f i s k P S 3 1 1 1 E N E N 6 N I M E M E $ E S 3 $ 5 N II $ f 5 5 5 5 N $ 3 1.t $ 5 5 M 5 h 16sDiiiEsiiEEERNIEWH!!ffeE All firearms qualification courses described in Appendix B o' f this document have been registered -with, and approved by, the National Rifle Association. Approval. letters are maintained .and available for inspection.

4.2 QUALIFICATION /REQUALIFICATION Armed members of the security force will, qualify with each firearm required by duty position prior to' assignment to such armed duty and every twelve (12) months thereafter.

4.3 SECURITY FORCE EQUIPMENT Members of the security. force are provided equipment in accordance with the provisions .of the. approved Turkey Point Physical Security Plan.

1 PTNTQP REV.2

l i t ,

,a .

PLANT TURKEY POINT TRAINING AND QUALIFICATIONS PLAN REASONS FOR REVISIONS REVISION 8 E& fag R&B& DESCRIPTION REASON FOR REVISION COVER N/A DENOTING REV. 8 REV. 8 SR N/A DATE OF APPROVAL REV. 8-LEP N/A REVISED PAGE LIST REV. 8 1-1 1.3 CLARIFY POSITIONS CtARITY 2-7 2.4.1 DELETED ADDITIONAL-ADMINISTRATIVE TIME-FOR AGILITY TESTIt'".. ONE HOUR TIME' LIMIT-4-1 4.1 ADDITION THAT ARMED PERSONNEL ARE TO BE ARMED WITH ONLY THE.

TYPE OF WEAPON THEY ARE QUALIFIED WITH. CLARIFICATION.-

s e

i