ML20046A659

From kanterella
Jump to navigation Jump to search
Forwards Diablo Canyon Power Plant Unit 2 Cycle 6 Startup Rept.
ML20046A659
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/21/1993
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046A660 List:
References
DCL-93-181, NUDOCS 9307290177
Download: ML20046A659 (1)


Text

. ,

4

. Pacific Gas and Electric Company 77 Beale Sheet fk.om 13.il Gregory M Rueger .

.. F 0 Box 770000 Senior Vte President and '

Sr f ranasto. C A 9',177 Genera! Manager

. 415/973-4fA4 Nuclear Power Generabon Far U5/973-2313 July 21, 1993 PG&E Letter Nc. DCL-93-181 ff,;'!

w U.S. Nuclear Regulatory Comnission '

- 4 ATTN: Document Control Desk

' Washington, D.C. 20555

!q Re: Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Unit 2 Cycle 6 Startup Report Gentlemen: .

Enclosed is a summary report of Diablo Canyon Unit 2 Cycle 6 startup and i power escalation testing following fuel loading. The transition to Vantage 5 fuel in the Unit 2 core is now complete, although PG&E may return selected standard fuel assemblies to future cores.

Sir cerely, h@h y--

Gregory M. Rueger cc: 90bby H. Faulkenberry A,n P. Hodgdon Miry H. Miller j Sheri R. Peterson '

CPUC Diablo Distrf'; ion Enclosure 6151S/85K/JHA/1881 l

9 5c n c, n ,

h

/ s 9307290177 93o721 79, 'l-PDR ADOCK 05000323 pij P PDR gj