Forwards Rev 1 to Design Alternatives to Sys 80+ Nuclear Power Plant, Covering Cost/Benefit Based on Recently Revised PRA
ML20045D340
Person / Time
Site: 05200002
Issue date: 06/18/1993
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045D341 List:
References
LD-93-098, LD-93-98, NUDOCS 9306280248
Download: ML20045D340 (1)


Text

, . . ~ . . - , ..-

i ABB ASEA BROWN BOVERI June 18, 1993 LD-93-098 Docket No.52-002 l

Attn: Document Control Desk i U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

Subject:

System 80+* Revised Design Alternatives Evaluation i

Dear Sirs:

This letter transmits the cost / benefit report on design alternatives based - t on the recently revised Probabilistic Risk Assessment. The report is

)

included as Attachment A and will be printed as an appendix to Chapter.19 of CESSAR-DC. . As supplementary information, averted onsite costs were i estimated and the results in Appendix B show that there was no significant change in the results.

If you have any questions, please call me or Mr. Stan Ritterbusch at (203) 285-5206. 4 Very truly yours, l

COMBUSTION ENCINEERING, INC.

lf .

l' l C. B. Brinkman

! Acting Director Nuclear Systems Licensing CBB/ser cc: J. Trotter (EPRI)

T. Wambach (NRC)

P. Lang (D0E) 2/100'70 ABB Combustion Engineering Nuclear Power i Comtivstion Enginecong. Inc 1000 Prospect Hdt Road T & phone 903) 668 t911 PDR "

AD CK O 2

^ '

01

!- A PDR #

._ . , .-. --