LER 90-004-00:on 881114,investigation Determined That Two Leads for Cabinet XPN-6002 Had Been Previously Disconnected in 881114 Refueling Outage,Rendering Transmitter LT-1976 Inoperable.Caused by Personnel error.W/900507 Ltr
ML20042G179
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/07/1990
From: Bradham O, Higgins W
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-004, LER-90-4, NUDOCS 9005110189
Download: ML20042G179 (5)


Text

m,~

~' .10CFR50.73 r - South Carolina Electric & Gas Company Ollie S. Bredham P.O. Box 88 Vice Prtsidtnt g, h. Jrnkinsville. SC 20065 Nucint Operations (803) 345 4040 SCE&G

{ >scaa wn May 7, 1990 i

~ Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 LER 90-004 L

Gentlemen:

Attached is Licensee Event Report No.90-004 for the Virgil C. Summer Nuclear Station. This report is submitted pursuant to the requirements of 10CFR50.73(a)(2)(1)(B).

Should there be any questions, please call us at your convenience.

Very truly yours, f te "

0. S. Bradham ARR/OSB:1cd Attachment c: 0. W. Dixon, Jr./T. C. Nichols,'Jr.

E. C. Roberts R. V. Tanner J. C. Snelson S. D. Ebneter R. L. Prevatte J. J. Hayes, Jr. J. B. Knotts, Jr.

General Managers INPO Records Center C. A. Price ANI Library

, G. J. Taylor Marsh & McLennan J. R. Proper NPCF R. B. Clary NSRC F. H. Zander RTS (0N0900038)

T. L. Matlosz Files (818.05 & 818.07) l K. E. Nodland i

I l

9005110189 900597

{DR ADOCK 03000393 PDC 7 )/%

as#C Poem Me U.S. NUCLl1R L 8;ULAT&v COAA81NIOss 8

APmovtD Dese es0 3180 010s j LICENSEE EVENT REPORT (LER) "'#8 8 8 '

, ACILITY hAA8510 DOCEST 88USSGR i2i _ FAGE W Virgil C. Summer Nuclear Station o is I o io I o i 3l 915 1 lor l014 TITLt .4#

Personnel Error Leads to Inoperable Reactor Building Level Transmitter sv0NT DATs ISI La# NU:se.en is: aspont DATE Ife OTHen F ACILITies enevotyse mi edQNTM DAY vtAm vtAR "$I, "8 @ MONTH DAY vtAn .aciksyv Mamas POCKET muMetatsi 0 15101010 1 I i 1l4 88 9 l0 1l1 0l0l4 0l 0 0l5 0l 7 9l0 o,s,o,o,o, , ,

,,,,,,,,,, TM ...o.T = v nTTio eva.vANT to T.. .. v .. .m o, i. C . i <C - ., ~,,um aos* 6 , . . , ..,.ian , 13.,, ,,,

y _

m ni.imm n .imm mi.im w.> = w.i m.,=>wn rs.ru.i n.i i i .mi.iai

_ _ _ g,=,i g g g.

==.<. mum m nMi 1 ..,si.iaim

.,mio n.,

M.7biWHM HAl

..,=,n...

M Al 30 05 eHinvl 9.79 pOHml 0.73 H2Hs)

LiC88EBGE CONT ACT FOR TMIS Lea (tal NAME TE LE*MONE NUMetm Anta CODE W. R. Higgins, Supervisor, Regulatory Compliance 803 i i 3 i 45 ii 40,42 i C0eePLf78 08st L*NE FOR EACM C0espoestNT p A: Lung petCA4000 IN THIS Rt80at 113)

O' "I' CAUSE $v8 TEM COMPONENT "h I,'hkI CAUSS Sv3TlM C04 SPONT NT M(

C. m Om,T qq a ' N A i i i i i i i N i , i i i i ;

i l i I I I I I I I I I I I SUFFLIMENTAL REPORT S KPtCTED (14 MONTH DAY vtAR vi$ (19 v.e comes.e. 8M9tCTED SusutS210N DA rtl No l l l g y A T . A C T n ,.,, ,, . . , . . . ~ , ~, . . .~, ,n.,

  • I ;

Technical Specification Table 2.3-10 Item 14 lists the Reactor Building Level Transmitters (LT-1975 LT-19 N as required accident monitoring instruments. While implementing a modification to these level transmitters during the fifth refueling outage, it was discovered that two leads for LT-1976 were determinated rendering the transmitter inoperable. The leads had been determinated during the previous refueling outage for maintenance purposes.

l The cause of this event was personnel error. The Lifted Lead and Jumper Sheet for the transmitter was inappropriately transferred between work documents. Contributing to this event was the use of an inadequate post-maintenance operability test.

The procedure for controlling lifted leads and jumpers is under revision and training on this process has been conducted with appropriate maintenance personnel. Also, I other Technical Specification instruments which fail to the position of their normal indication (e.g., 2ero span) will be evaluated for adequate testing.

g .. m.

Y'  :)

I~

- e' NRC f o*m 3h6A U 8, NUCLLfJI KECULATOAV COMMISSION

l

. i. . LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AreRovto oMe No aseo-oio.

tuelRf 8 813146 F ACitif V hAME Hi DUCKL I NUMBER 12) LtR NUMBER tell PA05 131 n=" "M" W:,T: .

~ Virgil C. Summer Nuclear Station 015 l o l o l o l 31915 910 -

01014 -

0l0 0l2 or 0 14 TBXT (# smwe apeso e reewed, use ecl@fenef 44C form 316A 31ll71 PLANT IDENTIFICATION:

Westinghouse - Pressurized Water Reactor EQUIPMENT IDENTIFICATION:

Post Accident Monitoring System (IP) - EIIS IDENTIFICATION OF EVENT:

Personnel error leads to inoperable Reactor Building Level Transmitter.

EVENT DATE: j The transmitter leads were lifted for level transmitter LT-1976 on November 14, i 1988. A reportable condition was identified on April 9, 1990.  !

REPORT DATE: I May 7, 1990  ;

This report was initiated by Off-Normal Occurrence Report 90-038.

CONDITION PRIOR TO EVENT:. i Node 6, 0% power, fifth refueling outage i

DESCRIPTION OF EVENT:  ;

Technical Specification 3/4.3.3.6 requires certain accident monitoring instruments t be operable to ensure that sufficient information is availaDie post-accident to monitor and assess selected plant parameters. Table 3.3-10 Item 14 lists the j

Reactor Building Level Transmitters (LT-1975, LT-1976) as required accident monitoring instruments. While implementing a modification to these level j transmitters during the fifth refueling outage, it was discovered that two leads in .

cabinet XPN-6002 had been previously disconnected which rendered LT-1976  !

inoperable.

  • Investigation into this event determined that the leads for LT-1976 were determinated during the fourth refueling outage (November 14,1988) as part of an Equipment Qual 1fication (EQ) inspection. The inspection was performed using a Preventive Maintenance Task Sheet (PMTS). As required by plant procedure  !

(SAP-300), a Lifted Lead and Jumper (LL&J) sheet was included with the PMTS to document the lifted leads.

t On November 17, 1988, during completion of the PMTS, the Electr' cal Supervisor (who was aware that the Instrumentation and Control group had an open Maintenance Work ,

Request [MWR 8810501] to repair damaged wires on LT-1976) contacted the I&C )

Supervisor to find out if retermination of the leads could be per % rmed by I&C.

The intent was-that 1&C would reland the leads for the EQ inspection and repair the damaged transmitter wires under MWR 8810501. Both supervisors agreed that this gc,oaux,.

_. b

e NRC Poem SeeA U.s NuCLEAM MoutAf DAY CDMMfstlON

i. o, LICENSEE EVENT REPORT (LER) TEXT CONTINUATION maovio ous no 3 iso-om iXPsRES 6!31/96 LIstif y NAM 6 Hi DUCR L1 NUMSLR 13) . L E R NUMBE R (6) R0t (3>

na "=. WJ:

Virgil C. Summer Nuclear Station o p jo lo lo l3 l9 l5 9l 0 or 0 l4 im m - . , . . - wc e ,mn 0 l 0l 4 --

0l0 0l 3 action would be acceptable. Subsequently, the retermination portion of the original LL&J sheet was NA'd by the Electrical Supervisor with reference to the i retermination via the MWR, The PMTS was signed off on November 17, 1988. However, j MWR 8810501 which was supposed to reterminate the leads (per the agreement between the supervisors) had been field completed on November 8, 1988. The failure to  !

reterminate the leads resulted in the level transmitter being inoperable until it was discovered during the Refuel 5 modification.

j '

CAUSE OF EVENT:

The cause of this event was personnel error. Apparently neither supervisor '

realized that the MWR had already been completed and, therefore, could not be used to reterminate the leads. In addition, there was miscommunication between the 4 supervisors regarding the means for using the LL&J sheet to document the transfer l of work. The Electrical Supervisor intended for the I&C Supervisor to generate a ~

new LL&J sheet whereas the I&C Supervisor epparently assumed that the original LL&J sheet would be provided to him for incorporation into the MWR package. Plant procedures allow transfer of work between documents (with specific controls), ,

however, the method for transfer of LL&J sheets is not adequately specified, i The surveillance testing requirements for the transmitter requires a monthly ,

channel check and an 18 month loop calibration. The loop calibration (STP-300.006)  !

was performed prior to the determination of the LT-1976 leads. The monthly channel I check (STP-135.001), which was also specified as the post-maintenance test, checks 1 that LT-1975 and LT-1976 are within instrument tolerance for redundant channels and i are indicating as expected for existing plant conditions. By design the de-energized LT-1976 fails to the indicator mechanical stop (413 feet indicated) and, therefore, the transmitter appeared to be reading normally (i.e., zero span)  !

during the channel checks. A contributing factor to this event was that the monthly channel check was inadequate for a post-maintenance / modification check of the level transmitter, ,

ANALYSIS OF EVENT:

The Limiting Condition for Operation (LCO) for Technical Specification 3.3.3.6 (when less then the required number of channels is operable) is to repair the inoperable channel within seven days or be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This event is reportable under 10CFR50.73(a)(2)(1)(B) since LT-1976 was inoperable for approximately 17 months. The plant was already shutdown at the time the event was discovered. A review of the PMTS and loop calibration for LT-1975 (the redundant Reactor Building Level Transmitter) indicates that it was operable during the period from Refuel 4 to Refuel 5.

g,oav a..

4 NRC Pese Se4A U g NUCt(A2 K&GULATO3Y COML41880N f "I -, . . . '

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Amovio ove ao uso-om o . . .,n . .m .s f actLITY hawa IU DOCMT NVMetR m g g gg naa -

" e f,; W3:

Virgil C. Summer Nuclear Station o plololo1 3 l 9l 5 9l0 -

0 l0 l4 -

0l0 01 4 or 0l4 itKT IM anwe spece a requwod, nose extenet NMC form 36tLA g)(th LT-1976 does not perform any control functions. It is used solely for Reactor Building level indication. This condition did not pose a safety concern because the redundant level transmitter was operable during the period. Also, two Reactor Building Sump level indicators (range 408-412 feet) were available to provide initial indication of rapidly rising water in the Reactor Building.

CORRECTIVE ACTION:

Since the plant was in Mode 6, no immediate corrective action was required. The following corrective measures have been identified for this event.

1. The procedure for controlling lifted leads and jumpers (SAP-300) is being revised to outline programmatic controls / methods for transferring LL&J sheets from one work document to another. This revision is scheduled to be complete by July 31, 1990.
2. The proper means to transfer responsibility of LL&J sheets has been discussed with the Electrical and I&C Supervisors. Formal guidance (memorandum dated April 18, 1990) was provided on how to transfer LL&J responsibility and training sessions were conducted with the applicable I&C, Mechanical and Electrical Maintenance personnel.
3. A list of Technical Specification instruments which fail to the position of their normal indication (e.g., zero span) has been generated. SCE&G will verify that adequate testing has been performed on these instruments prior to entering Mode 1 from the present refueling outage and will ensure they remain operable throughout the upcoming cycle.
4. The adequacy of the post-maintenance testing program will be thoroughly reviewed by SCE&G. The responsibility for administering post-maintenance ,

testing will be transferred to the recently formed Test Group. This will improve the technical adequacy and consistency of post-maintenance testing.

PRIOR OCCURRENCES:

None.

NR FOmv 346a

>