05000395/LER-1982-056-03, /03L-0:on 821209,surveillance Test Procedure, Nis Power Range Heat Balance, Not Performed in Specified Intervals.Caused by Personnel Oversight.Administrative Procedures for Control of Surveillances Revised

From kanterella
(Redirected from ML20028D323)
Jump to navigation Jump to search
/03L-0:on 821209,surveillance Test Procedure, Nis Power Range Heat Balance, Not Performed in Specified Intervals.Caused by Personnel Oversight.Administrative Procedures for Control of Surveillances Revised
ML20028D323
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/07/1983
From: Mckinney C
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028D322 List:
References
LER-82-056-03L, LER-82-56-3L, NUDOCS 8301170404
Download: ML20028D323 (1)


LER-1982-056, /03L-0:on 821209,surveillance Test Procedure, Nis Power Range Heat Balance, Not Performed in Specified Intervals.Caused by Personnel Oversight.Administrative Procedures for Control of Surveillances Revised
Event date:
Report date:
3951982056R03 - NRC Website

text

'

s

> Mtc FOJIM 363 U S. NUCLE AR HEGULATORY COMMISSION APPitOVED BY OM3 D"

LICENSEE EVENT REPORT ExPs$5s'4.so a CONTROL BLOCK: l l

l l

l l

l@

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I oIi l I sl c I v i c I S I 1l@l 0101 - 10 l 01010101 -1010 l@l 4 l 1101010 l@l i

I@

. 9 LIC ENSEE CODE

.4 19 LIC E N S E NU M B E R 85 2.

LIC EN S E T Y PE 3.

SF CAT 5.

CON'T lol1l "gan l 1, l@l 0l 5l 010 l 0 l 3l9 l 5 l@l 1 l2 l 0l9 l 8 l 2 j@l 0l1 l 0 l 7 l 8l3 l@

y g

.t DOCK ET NUMB ER EVENT D ATE 74 7.

R EPORT D ATE h

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES l o l2 l l On December 9. 1982. with the Plant in Mode 1. Surveillance Test Procedure (STP)l lo l3 ll 102.002 "NIS Power Range Heat Balance," was not performed in accordance with l

l o l4 l l the surveillance interval identified in Surveillance Requirement 4.0.2.(a).

l [o lS l l There were no adverse consequences from this event since the Plant had remained l [o le [ [ at a stchie 30% of Rated Thermal Power during the subject time period.

l l0l7ll l

IoIejl I

'"I'E

%"'I

' ^n ' E SUtCAE S:^u:E S

CO P.NE NT CODE 10191 l IlA l @ [A_j h l A l @ l Zl Z I Z l Z l ZlZ l h W h d. b i.

~ EVENT TE A R R EPORT NO OD TY E NO.

@ @j,""'M l 812 I L _]

I 01 s I 6 I I/I I 013 I l_L ]

l-1 10_J

, 31 22 25 24 2

37 2.

2.

3 31 32 TAREN ACTON ON PLA NT M ETNOD NOURS S

M TTED FORM SWE.

S U PP LI E M ANUP ACTUR ER llj@lc l@

IZ l@

IZl@

l 01 010101 I vl@

lNlh l Nlh lW l1 l 2 l 0 I 34 39 3.

37 4.

45 da 43 64 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lT[ol l The f ailure to perform the surveillance test during the scheduled time interval l l1l1ll is attributed to personnel oversight.

STP-102.002 was satisfactorily performed l l t l 2 l l on December 9 1982. The administrative procedure covering the surveillance l

l i j a l l program is being revised to improve controls on surveillances with short l

l114ll frequencies.

l STAT S

% POW E R OT N E R S T A ". U S ISCOVERY DISCOV E R Y DE SCR IPTION l116ll Bl @ l 0 l 3 l 0 l@l N/A l

lA[@l Operator Observation l

.S REL

.ED RELE ASE AMOUNT OF ACTivtTY LOC A TIO N OF R ELE A SE l1l6I W h IZlhl N/A l

l N/A l

NUMBER TYPE D E S C R IPTIO N N I 1 l 7 l l 01010 l@W@l NA

]

i.

NUMSER E S C R IPT ION

[ il n [ l 0 l 0 l 0l@l N/A l

 ?" " "D E S' " " * ",i"O' ' ' ' "@

T R

x/^

l l5I9IL.zJ@l

.e iSSUEI,"*'n'SCkPTiON h NRC USE ONLY' 17l o l l N [@l N/A l lllllllllllll

/ p NWE of PREPARER

[

km M A PHONE.

(803) 345-5209 8301170404 830107

/t.

.T. McKinnev M'

PDR ADOCK 05000395 v

S PDR