MONTHYEARRC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 RC-98-0053, Monthly Operating Rept for Feb 1998 for Virgil C Summer Nuclear Station,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Virgil C Summer Nuclear Station,Unit 1 RC-98-0029, Monthly Operating Rept for Jan 1998 for VC Summer Nuclear Station,Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for VC Summer Nuclear Station,Unit 1 RC-97-0008, Monthly Operating Rept for Dec 1997 for Virgil C Summer Nuclear Station1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Virgil C Summer Nuclear Station RC-97-0254, Monthly Operating Rept for Nov 1997 for Virgil C Summer Nuclear Station,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0235, Monthly Operating Rept for Oct 1997 for Virgil C Summer Nuclear Station,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0211, Monthly Operating Rept for Sept 1997 for Virgil C Summer Nuclear Station,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0183, Monthly Operating Rept for Aug 1997 for Virgil C Summer Nuclear Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Virgil C Summer Nuclear Station Unit 1 RC-97-0166, Monthly Operating Rept for Jul 1997 for Virgil C Summer Nuclear Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Virgil C Summer Nuclear Station RC-97-0143, Monthly Operating Rept for June 1997 for VC Summer Nuclear Station1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for VC Summer Nuclear Station RC-97-0123, Monthly Operating Rept for May 1997 for VC Summer Nuclear Station,Unit 11997-05-31031 May 1997 Monthly Operating Rept for May 1997 for VC Summer Nuclear Station,Unit 1 RC-97-0101, Monthly Operating Rept for Apr 1997 for VC Summer Nuclear Station Unit 11997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for VC Summer Nuclear Station Unit 1 RC-97-0076, Monthly Operating Rept for Mar 1997 for VC Summer Nuclear Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for VC Summer Nuclear Station Unit 1 RC-97-0053, Monthly Operating Rept for Feb 1997 for Vsns1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vsns RC-97-0033, Monthly Operating Rept for Jan 1997 for Virgil C Summer Nuclear Station1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Virgil C Summer Nuclear Station ML20133F6361996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for VC Summer Nuclear Station Unit 1 RC-96-0281, Monthly Operating Rept for Nov 1996 for Virgil C. Summer Nuclear Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Virgil C. Summer Nuclear Station Unit 1 RC-96-0271, Monthly Operating Rept for Oct 1996 for Virgil C Summer Nuclear Station,Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Virgil C Summer Nuclear Station,Unit 1 RC-96-0243, Monthly Operating Rept for Sept 1996 for VC Summer Nuclear Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for VC Summer Nuclear Station Unit 1 RC-96-0231, Monthly Operating Rept for Aug 1996 for VC Summer Nuclear Station Unit 11996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for VC Summer Nuclear Station Unit 1 RC-96-0205, Monthly Operating Rept for Jul 1996 for VC Summer Nuclear Station1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for VC Summer Nuclear Station RC-96-0156, Monthly Operating Rept for May 1996 for VC Summer Nuclear Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for VC Summer Nuclear Station Unit 1 RC-96-0134, Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station RC-96-0108, Monthly Operating Rept for Mar 1996 for VC Summer Nuclear Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for VC Summer Nuclear Station ML17292A0191996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for VC Summer Nuclear Station Unit 1 RC-96-0031, Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 1 ML17292A0201996-01-31031 January 1996 Resubmitted Monthly Operating Rept for Jan 1996 for VC Summer Nuclear Power Station Unit 1 Due to Day Average Daily Power Level Calculations Error RC-96-0005, Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station RC-95-0318, Monthly Operating Rept for Nov 1995 for VC Summer Nuclear Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for VC Summer Nuclear Station RC-95-0286, Monthly Operating Rept for Oct 1995 for VC Summer Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for VC Summer Nuclear Plant RC-95-0261, Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station RC-95-0238, Monthly Operating Rept for Aug 1995 for VC Summer Nuclear Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for VC Summer Nuclear Station RC-95-0213, Monthly Operating Rept for Jul 1995 for VC Summer Nuclear Station1995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for VC Summer Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D6401999-10-31031 October 1999 Rev 2 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With ML20216J4191999-09-24024 September 1999 Part 21 Rept Re 990806 Abb K-Line Breaker Defect After Repair.Vendor Notified of Shunt Trip Wiring Problem & Agreed to Modify Procedure for Refurbishment of Breakers RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression1999-09-0808 September 1999 Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With ML20211K6161999-08-31031 August 1999 Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, Dtd Aug 1999 RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed1999-08-19019 August 1999 Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed ML20210M7071999-07-31031 July 1999 Rev 1 to VC Summer Nuclear Station COLR for Cycle 12 ML20211C2201999-07-31031 July 1999 Rev 1 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With ML20206H2971999-05-0505 May 1999 Part 21 Rept Re Common Mode Failure for magne-blast Breakers.Vc Summer Nuclear Station Utilizes These Breakers in Many Applications,Including 7.2-kV EDG Electrical Buses RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With ML20206K2421999-04-30030 April 1999 Rev 0 to COLR for Cycle 12 for Summer Nuclear Station RC-99-0087, Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory1999-04-15015 April 1999 Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced1999-03-26026 March 1999 Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced ML20196K5421999-03-22022 March 1999 Rev 2 to VC Summer Nuclear Station,Training Simulator Quadrennial Certification Rept,1996-99, Books 1 & 2. Page 2 of 2 Section 2.4.4 (Rev 2) of Incoming Submittal Were Not Included RC-99-0055, Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 9903121999-03-16016 March 1999 Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 990312 RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML20203F4511999-02-12012 February 1999 SER Finding Licensee Adequately Addressed GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Virgil C Summer Nuclear Station ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20206R5241998-12-31031 December 1998 Santee Cooper 1998 Annual Rept RC-99-0052, Vsns 1998 Annual Operating Rept. with1998-12-31031 December 1998 Vsns 1998 Annual Operating Rept. with RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With ML20206R5191998-12-31031 December 1998 Scana Corp 1998 Annual Rept ML20198F4241998-12-18018 December 1998 Safety Evaluation Granting Relief Request for Approval to Repair ASME Code Class 3 Service Water Piping Flaws in Accordance with GL 90-05 for VC Summer Nuclear Station RC-98-0223, Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method1998-12-16016 December 1998 Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With ML20155G4551998-11-0404 November 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Use Code Case N-416-1 with Licensee Proposed Addl Exams RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With ML20207J5701998-10-31031 October 1998 Non-proprietary Rev 1 to WCAP-14955, Probabilistic & Economic Evaluation of Rv Closure Head Penetration Integrity for VC Summer Nuclear Plant ML20154Q9571998-10-21021 October 1998 SER Accepting Request Seeking Approval to Use Alternative Rules of ASME Code Case N-498-1 for Class 1,2 or 3 Sys ML20154K7901998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15101, Analysis of Capsule W from Sceg VC Summer Unit 1 Rv Radiation Surveillance Program RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With ML20154K8041998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15103, Evaluation of Pressurized Thermal Shock for VC Summer Unit 1 RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With ML20237A7181998-08-13013 August 1998 SER Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station ML20248J0191998-06-0404 June 1998 Safety Evaluation Accepting Licensee Inservice Testing Program Interim Pump Relief Request Per 10CFR50.55a(a)(3) (II) RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 ML20217G7411998-04-22022 April 1998 Rev 1 to VC Summer Nuclear Station COLR for Cycle 11 RC-98-0076, Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure1998-04-17017 April 1998 Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 ML20212H1421998-03-0202 March 1998 Interim Part 21 Rept SSH 98-002 Re EG-B Unit That Was Sent to Power Control Svcs for Determination of Instability & Refurbishment of a Dg.Cause of Speed Oscillations Unknown. Completed Hot Bore Checks on Power Case 1999-09-08
[Table view] |
Text
y- , ; ,
, w-.T .j
$ .. -l f 'f 'h.
. "F ,'
4,' j 13:
1
' =
SCE&G. _} A SCANA COMPANY d- RC-99-0122 i
June 16, 1999 M I u.
k
- ) X e s
Document Control Desk
+ N:: (U. S. Nuclear Regulatory Commission y QWashington, DC 20555 q
,1 Attention: Director, Office of Resource Management N- q H> . . ..
? Gentlemen:
- Gky J.Toyk ;'
abhalde$le '
Subject:
VIRGIL C. SUMMER NUCLEAR STATION Uhdw4erations' M DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 MAY MONTHLY OPERATING REPORT j' w ; Enclosed is the May 1999 Monthly Operating Report for the Virgil C. Summer
" ' L Nuclear Station Unit No.1. This submittal is made in accordance with the Jrequirements of Technical Specifications, Section 6.9.1.10.
m i$ath!(ac!ino Dedrk & Gas (oiif there are any questions, please call me at your convenience.
u VqilC Sanmer Nudear StationV
' Very truly yours, c P.O.8cx 68 iJenkinsvire SoshCoN5no d
![
/j 2065'. < i g d f8035434E4 i 801345.5209 9 ' ,
j Ga . a lo 1 wwnscione w N /
?GJT/nkk
' Attachment b!
n m, Lc: S. A. Byrne Paulette Ledbetter
', :] W. F. Conway !NPO Records Center A4 '
- 1) R. R. Mahan (w/o Attachment) J&H Marsh & McLennan Q1 7 R. J. White William G. Wendland (ANI)
W , L.A.Reyes Pat Haught (Westinghouse)
'., 4
> .l L. M. Padovan RTS (RR 4100) 3 R. M. Fowlkes File (818.03-1)
~
,, , / NRC Resident inspector DMS (RC-99-0122)
N , 'j J. B. Knotts, Jr.
. . . . v. .-
9906220108 990531 M M wm se. ,.l$)l g) ADOCK 05000395 PDR PDR }{
.n u e f NUCLEAR EXCELLENCE - A SUMMER TRADITIONI
- w 3 fi; d.'l,. . . ..,
" . ,.)-b .
W: .
Director, Office of Resource Management May Monthly Operating Report
'Page 1-ATTACHMENT I l AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO. 50/395 UNIT - V. C. SUMMER I DATE 6/11/99 COMPLETED BY W.~H. BELL TELEPHONE (803) 345-4389 MAY 1999 DAY AV) R GE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 0 17 688
- 2. 0 18. 0
- 3. 0 19. 382
- 4. 0 20. 872 I
- 5. 0 21. 934
- 6. 0 22. 967
- 7. 0 23. 970
- 8. 0 24. 967
- 9. 0 25. 963
- 10. 0 26. 961
- 11. 83 27, 960 12, 211 28. 967
- 13. 274 29. 978
- 14. 397' 30. 980
- 15. 444 -31. 978
- 16. 679
. Director, Office of Resource Management
'May Monthly Operating Report Page 2
'l ATTACHMENT II OPERATING' DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 6/11/99 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 )
OPERATING STATUS:
{
- 1. Reporting Period: May 1999 Gross Hours in Reporting Period: 744
- 2. Currently Authorized Power Level (MWt) : 2900 Max. Depend. Capacity (MWe-Net) : 954 Design Electrical Rating (MWe-Net): 963
.3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
~4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. Number or nours Reactor Critical 504.8 2719.1 112317.8
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 463.7 2675.0 110732.3
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 1076013 7380737 294898004
- 10. Gross Electrical Energy (MWH)- 369580 2549900 98774629
- 11. Net Electrical Energy Generated (MWH) 351685 2452687 94231227
- 12. Reactor Service Factor 67.8 75.1 83.1
- 13. Reactor Availability' Factor 67.8 75.1 83.1
- 14. Unit Service Factor 62.3 73.8 82.0
- 15. Unit Availability Factor 62.3 73.8 82.0
- 16. Unit Capacity Factor (Using MDC) . 49.5 71.1 77.7 17.L Unit Capacity Factor (Design MWe) 49.1 70.5 76.6 18.. Unit Forced Outage Rate 5.4- 1.0 3.7
- 19. - Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each) :
NONE
- 20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation): N/A I
f! -
s Director, Office of Resource Management 1May Monthly Operating Report Page 3 I
ATTACHMENT III l
' UNIT SHUTDOWNS AND POWER REDUCTIOF.S I
DOCKET NO. 50/395 UNIT V. C. SUMKER I ,
DATE 6/11/99 1 COMPLETED BY W. H. BELL l TELEPHONE (803) 345-4389 MAY 1999 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION /COf14ENIS 1 990403 S 253.8 C 1 COMPLETE REFUEL 11 j 2 990513 F 0.8 B 1 MAINTENANCE ON MG VOLT. REGULATOR 3 990518 F 25.7 A 2 MAIN TURBINE HI VIBRATION
'1.0 REASON A: Equipment Failure.
B: Maintenance or Test C: Refueling.
D: Rcgulatory Restriction
-E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2,0 -METHOD 1: Manual 2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reduction (Duration 0.0) 9; other (Explain)
p.
Director, Office of Resource Management May Monthly Operating Report
- Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPF. RATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 6/11/99 COMPI.ETED Ef W. H. BELL TF.LEPEONE (803) 345-4389 i MAY 1999 AT THE BEGINING OF THE MONTH THE UNIT WAS SHUT DOWN FOR THE 11TH REFUELING OUTAGE. THE REACTOR WENT CRITICAL AT 06:05 ON 5/10/99 AND THE 'BMAKER WAS FIRST CLOSED AT 13:48 ON 5/11/99. ON 5/13/99 POWER WAS REDUCED FROM 30% TO 20% AND AT 03:25 THE ' BREAKER WAS BRIEFLY OPENED TO PERMIT MAINTENANCE ON THE MAIN GENERATOR REGULATOR AND TnEN CLOSED AT 04:10 THE SAMZ DAY.
AT 00,41 ON 5/18/99 WHILE AT 82% POWER THE REACTOR WAS MANUALLY TRIPPED DUE TO HIGH BEARING VIBRATION ON THE MAIN HIGH PRESSURE TURBINE. AT 17:45 OF THE SAME DAY THE REACTOR WENT CRITICAL AND
,.ON 5/19/99;AT 02:26 THE GENERATOR BREAKER WAS CLOdED. AT 17:30 ON 5/21/99 THE UNIT ACHIEVED 100% POWER WHERE IT REMAINED FOR THE REST OF THE MONTH.
I r ;
e.
f ,
MISCELLANEOUS OPERATING STATISTICS THRU Fby 1999 VIRGIL C SUMMER NUCLEAR STATION, UNIT 1 OPERATING STATUS Currently Authorized Power Level (MWt): 2900 Max. Depend. Capacity (MUe-Net): 954 Design Electrical Rating (MWe-Net): 963 Gross Maximum capacity (MWe): 1001 Gross Dependable Capacity (MWe) : 1000 LIFE FISCAL YEAR 12 MONTH 3 MONTH OF PLANT TO DATE TOTALS TOTALS l
l Number of Hours Reactor Critical 119652.6 7136.1 7856.1 1303.1 (
Reactor Reserve Shutdown Hours 0.0 0.0 Hours Generator on Line 117731.7 1092.0 7812.0 1259.0 Unit Reserve Shutdown Hours 0.0 0.0 Gross Thermal Energy Generated (MWH) 309508539 13939262 22024922 3294070 Gross Electrical Energy (MWH) 103555139 6862720 7579650 1136690 Net Electrical Energy Generated (MWH) 98723953 6600547 7290395 1090321 Reactor Service Factor 82.5 88.8 Reactor Availaoility Factor 82.5 88.8 Unit Service Factor 81.2 88.2
- Unit Availability Factor _
81.2 88.2 67.2 51.3
. Unit Capacity Factor (Using MDC) 76.0 86.0 88.1 52.3 Unit Capacity Factor (Design MWe) 74.8 85.2 Unit Forced Outage Rate 4.0 0.4 0.3 Forced Outage Hours 4954.3 26.5 26.5 26.5 l Scheduled Outage Hours 22275.0 921.5 921.5 971.5 Equipment Forced Outages: 2 2 .
Equivalent Unit Derated Hours
- 400.45 304.30 Equivalent Seasonal Derated Hours
- 21.22 0.47 Equivalent = Availability Factor
- 84.4 43.2 Equivalent Unit Derated Hours
- for Month: 283.5 Equivalent Seasonal Derated Hours
- for Month: 0.5 Equivalent Availability Factor
- for Month: 24.2 Equivalent Availability Factor
- for 36 months: 89.3 Year-to-Date Equivalent Availability Factor *: 65.3 Equipment Forced Outages per 1000 Critical Hours: 0.255 Equipment Forced Outages Year-to-Date: 2 Total Forced Outages Year-to-Date: 2
- Based on INPO Detailed Descriptions of Overall Performance Indicators and Other Indicators - December 1987
p :.
MONTH: MAY 1999 HOURS GENERATOR ON LINE: 744 UNIT AVAILABILITY FACTOR: 100%
V. C. SUMMER, UNIT 1 MONTHLY OUTAGE REPORT FO.R MAY. 1999 OUTAGE 1 START ! END !. HOURS iTYPE! REASON FOR OUTAGE ! CORRECTIVE ACTION NO. l TIME I TIME IDURATION! ! !
1 l- -1 1 ! !
1 04/03/99 04/30/99 253.8 S 11TH REFUELINING COMPLETE REFUELING 2 05/13/99 05/13/99 .8 F MAINT.MG REGULATOR MAINT. COMPLETED 3 05/18/99 05/19/99 25.7 F MAIN HI-PRES TURBINE MAINT. COMPLETED
-~ f I, -m=