Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARRC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 RC-98-0053, Monthly Operating Rept for Feb 1998 for Virgil C Summer Nuclear Station,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Virgil C Summer Nuclear Station,Unit 1 RC-98-0029, Monthly Operating Rept for Jan 1998 for VC Summer Nuclear Station,Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for VC Summer Nuclear Station,Unit 1 RC-97-0008, Monthly Operating Rept for Dec 1997 for Virgil C Summer Nuclear Station1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Virgil C Summer Nuclear Station RC-97-0254, Monthly Operating Rept for Nov 1997 for Virgil C Summer Nuclear Station,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0235, Monthly Operating Rept for Oct 1997 for Virgil C Summer Nuclear Station,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0211, Monthly Operating Rept for Sept 1997 for Virgil C Summer Nuclear Station,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Virgil C Summer Nuclear Station,Unit 1 RC-97-0183, Monthly Operating Rept for Aug 1997 for Virgil C Summer Nuclear Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Virgil C Summer Nuclear Station Unit 1 RC-97-0166, Monthly Operating Rept for Jul 1997 for Virgil C Summer Nuclear Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Virgil C Summer Nuclear Station RC-97-0143, Monthly Operating Rept for June 1997 for VC Summer Nuclear Station1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for VC Summer Nuclear Station RC-97-0123, Monthly Operating Rept for May 1997 for VC Summer Nuclear Station,Unit 11997-05-31031 May 1997 Monthly Operating Rept for May 1997 for VC Summer Nuclear Station,Unit 1 RC-97-0101, Monthly Operating Rept for Apr 1997 for VC Summer Nuclear Station Unit 11997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for VC Summer Nuclear Station Unit 1 RC-97-0076, Monthly Operating Rept for Mar 1997 for VC Summer Nuclear Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for VC Summer Nuclear Station Unit 1 RC-97-0053, Monthly Operating Rept for Feb 1997 for Vsns1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vsns RC-97-0033, Monthly Operating Rept for Jan 1997 for Virgil C Summer Nuclear Station1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Virgil C Summer Nuclear Station ML20133F6361996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for VC Summer Nuclear Station Unit 1 RC-96-0281, Monthly Operating Rept for Nov 1996 for Virgil C. Summer Nuclear Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Virgil C. Summer Nuclear Station Unit 1 RC-96-0271, Monthly Operating Rept for Oct 1996 for Virgil C Summer Nuclear Station,Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Virgil C Summer Nuclear Station,Unit 1 RC-96-0243, Monthly Operating Rept for Sept 1996 for VC Summer Nuclear Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for VC Summer Nuclear Station Unit 1 RC-96-0231, Monthly Operating Rept for Aug 1996 for VC Summer Nuclear Station Unit 11996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for VC Summer Nuclear Station Unit 1 RC-96-0205, Monthly Operating Rept for Jul 1996 for VC Summer Nuclear Station1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for VC Summer Nuclear Station RC-96-0156, Monthly Operating Rept for May 1996 for VC Summer Nuclear Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for VC Summer Nuclear Station Unit 1 RC-96-0134, Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station RC-96-0108, Monthly Operating Rept for Mar 1996 for VC Summer Nuclear Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for VC Summer Nuclear Station ML17292A0191996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for VC Summer Nuclear Station Unit 1 RC-96-0031, Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 1 ML17292A0201996-01-31031 January 1996 Resubmitted Monthly Operating Rept for Jan 1996 for VC Summer Nuclear Power Station Unit 1 Due to Day Average Daily Power Level Calculations Error RC-96-0005, Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station RC-95-0318, Monthly Operating Rept for Nov 1995 for VC Summer Nuclear Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for VC Summer Nuclear Station RC-95-0286, Monthly Operating Rept for Oct 1995 for VC Summer Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for VC Summer Nuclear Plant RC-95-0261, Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station RC-95-0238, Monthly Operating Rept for Aug 1995 for VC Summer Nuclear Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for VC Summer Nuclear Station RC-95-0213, Monthly Operating Rept for Jul 1995 for VC Summer Nuclear Station1995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for VC Summer Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D6401999-10-31031 October 1999 Rev 2 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With ML20216J4191999-09-24024 September 1999 Part 21 Rept Re 990806 Abb K-Line Breaker Defect After Repair.Vendor Notified of Shunt Trip Wiring Problem & Agreed to Modify Procedure for Refurbishment of Breakers RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression1999-09-0808 September 1999 Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With ML20211K6161999-08-31031 August 1999 Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, Dtd Aug 1999 RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed1999-08-19019 August 1999 Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed ML20210M7071999-07-31031 July 1999 Rev 1 to VC Summer Nuclear Station COLR for Cycle 12 ML20211C2201999-07-31031 July 1999 Rev 1 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0137, Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With ML20206H2971999-05-0505 May 1999 Part 21 Rept Re Common Mode Failure for magne-blast Breakers.Vc Summer Nuclear Station Utilizes These Breakers in Many Applications,Including 7.2-kV EDG Electrical Buses RC-99-0103, Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for VC Summer Nuclear Station.With ML20206K2421999-04-30030 April 1999 Rev 0 to COLR for Cycle 12 for Summer Nuclear Station RC-99-0087, Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory1999-04-15015 April 1999 Part 21 Interim Rept (SSH 99-0001) Re 990218 Failure of Circuit Breaker Located in Cubicle 14 of XSW1DB to Close During Surveillance Testing.Caused by Positive Interlock Angle Was Incorrect.Breaker Was Returned to GE Factory RC-99-0083, Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for VC Summer Nuclear Station,Unit 1.With RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced1999-03-26026 March 1999 Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced ML20196K5421999-03-22022 March 1999 Rev 2 to VC Summer Nuclear Station,Training Simulator Quadrennial Certification Rept,1996-99, Books 1 & 2. Page 2 of 2 Section 2.4.4 (Rev 2) of Incoming Submittal Were Not Included RC-99-0055, Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 9903121999-03-16016 March 1999 Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 990312 RC-99-0050, Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for VC Summer Nuclear Station,Units 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML20203F4511999-02-12012 February 1999 SER Finding Licensee Adequately Addressed GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Virgil C Summer Nuclear Station ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20206R5241998-12-31031 December 1998 Santee Cooper 1998 Annual Rept RC-99-0052, Vsns 1998 Annual Operating Rept. with1998-12-31031 December 1998 Vsns 1998 Annual Operating Rept. with RC-99-0004, Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for VC Summer Nuclear Station,Unit 1.With ML20206R5191998-12-31031 December 1998 Scana Corp 1998 Annual Rept ML20198F4241998-12-18018 December 1998 Safety Evaluation Granting Relief Request for Approval to Repair ASME Code Class 3 Service Water Piping Flaws in Accordance with GL 90-05 for VC Summer Nuclear Station RC-98-0223, Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method1998-12-16016 December 1998 Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With ML20155G4551998-11-0404 November 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Use Code Case N-416-1 with Licensee Proposed Addl Exams RC-98-0208, Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for VC Summer Nuclear Station,Unit 1.With ML20207J5701998-10-31031 October 1998 Non-proprietary Rev 1 to WCAP-14955, Probabilistic & Economic Evaluation of Rv Closure Head Penetration Integrity for VC Summer Nuclear Plant ML20154Q9571998-10-21021 October 1998 SER Accepting Request Seeking Approval to Use Alternative Rules of ASME Code Case N-498-1 for Class 1,2 or 3 Sys ML20154K7901998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15101, Analysis of Capsule W from Sceg VC Summer Unit 1 Rv Radiation Surveillance Program RC-98-0184, Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for VC Summer Nuclear Station.With ML20154K8041998-09-30030 September 1998 Non-proprietary Rev 0 to WCAP-15103, Evaluation of Pressurized Thermal Shock for VC Summer Unit 1 RC-98-0166, Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for VC Summer Nuclear Station,Unit 1.With ML20237A7181998-08-13013 August 1998 SER Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RC-98-0153, Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0131, Monthly Operating Rept for June 1998 for VC Summer Nuclear Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for VC Summer Nuclear Station ML20248J0191998-06-0404 June 1998 Safety Evaluation Accepting Licensee Inservice Testing Program Interim Pump Relief Request Per 10CFR50.55a(a)(3) (II) RC-98-0113, Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for VC Summer Nuclear Station,Unit 1 RC-98-0100, Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for VC Summer Nuclear Station,Unit 1 ML20217G7411998-04-22022 April 1998 Rev 1 to VC Summer Nuclear Station COLR for Cycle 11 RC-98-0076, Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure1998-04-17017 April 1998 Final Part 21 Rept Re a DG EG-B for Vsns,As Followup to .Power Control Svcs of Engine Sys,Inc Provided Response on 980318.Evaluation Concludes That Failure of EG-B Is one-time non-repeatable Failure RC-98-0084, Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Virgil C Summer Nuclear Station,Unit 1 ML20212H1421998-03-0202 March 1998 Interim Part 21 Rept SSH 98-002 Re EG-B Unit That Was Sent to Power Control Svcs for Determination of Instability & Refurbishment of a Dg.Cause of Speed Oscillations Unknown. Completed Hot Bore Checks on Power Case 1999-09-08
[Table view] |
Text
M1.9.JmY ' ll ; , - llnb a Mk, , ~5, jW .
> W y%n :
~
j {K
'[!%i&y * 'PO i '; ; ms +
4
~
s @, .x. --
QA, '"'
Q October 14, 1999 l
1' h@5g W RC-99-0202
%n x]N$kd
.wa
_.7., .. M SdN ($y , 93 M.A e
3m ' MN3!:
.~ u
$. l .f,jj di ; Q (. ' fjf Document Control Desk
! U. S. Nuclear Regulatory. Commission 1
~ ' ML , A]u 0
4W Washington, DC 20555 w m, W
I. --
t 2 Q4.Ilfh.%' '
$j Attention: Director, Office of Resource Management Au- ,
<J Mi (Gwy J5o g%y Gentlemen:
J.kylw3f j WenesibG " D j
Subject:
VIRGIL C. SUMMER NUCLEAR STATION PaciOmbrikiL &l DOCKET NO. 50/395
'T> a ' OPERATING LICENSE NO. NPF-12 ;
Mc @ f. SEPTEMBER MONTHLY OPERATING REPORT
. a w" [' ' j" Enclosed is the September 1999 Monthly Operating Report for the Virgil C.
Summer Nuclear Station Unit No.1. This submittalis made in )'
d L N y~ d the requirements of Technical Specifications, Section 6.9.1.10.
w ,,,
~
4em < 3, .
11.m.$. ... f RA J; If there are any questions, please call me at your convenience.
450uth Ca xiDectric & Gas Co 1 1
1
!VirgilC.bmmm Nudes Statimi Very truly yours, !
2 0.80x 88 ?. 4, 7 ItslidiRelSouthjordngj
!?90451, 4 1
r 4
,4 73 J80i3 h434 M 4 .$y Ga .
- 803.3453209.:.L~~ ? q i e m m 5nl 1 gGJT/nkk )
- y. 4,m ' Attachment -
p @ gn , g _
M >% 4 ic: S. A. Byme Paulette Ledbetter i 76' I lj W. F. Conway . .
INPO Records Center k M,' 43 J.'J. Galan (w/o Attachment) J&H Marsh & McLennan t 1 R. J. White William G. Wendland (ANI) , h; f[@-
$g(sj-g @NA L. A' Reyes K. R. Cotton Pat Haught (Westinghouse) {
jj% RTS (RR 4100) 1 PQ m : R. M. Fowlkes File (818.03-1)
, y g op NRC Resident inspector DMS (RC-99-0202) s'K '.ggg~fiundM Om%4 A ~ ~9 - c J.' B. Knotts, Jr.
q 9910220149 990930 b PDR ADOCK 05000395 -
CC , d -R PDR th Gd g.n:memy 3 Q;ng c T'Mw
%\ . NUCLEAR EXCELLENCE'- A SUMMER TRADITIONI 4
y'fM h [N y j, _
g>', my; 4 :
~
,' Director,. Office of Resourco Management September Monthly Operating. Report
~
Page:1 l 4
i ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 10/ 6/99 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389
. SEPTEMBER 1999 DAY AVERAGE. DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net)
(MWe-Net)
- 1. 968 17. 971
- 2. 968- 18. 972
- 3. 969 19. 972
- 4. 968' 20. 973 5, 970 21. 972 i
- 6. 969 22. 974 i
. 77 . 968 23. 973
'8. 970 24. 970 i
' SF. 969 25. 959
~ 10 . 969 26. 966
.11. 969' 27. 969 l
' 12 . - 968 28. 971
- 13. 969- 29. 972 )
)
'14. '968 20. 973
)
15 . .- 969
. ' 16 . '
.971 L
f, z. N
-. Director, Office of Resource Management ESeptember Monthly Operating Report
- Ppge-2 c 4 ATTACHMENT II OPERATING DATA REPORT
. DOCKET NO. 50/395 UNIT V. C. SUMMER I 1DATE 10/6/99 COMPL5 ?D BY W. H. BELL TELEPHOJE (803).345-4389 i
~OPER;fING 5 STATUS-
- 1. Reporting. Period: Geptember 1999 Gross: Hours in' Reporting Period: 720
'2. Currently Authorized Power- Level (MWt): 2900
-Max. Depend. Capacity-(Mwe-Net _.:
954
- Design' Electrical Rating (Mwe-Net): 963
-3. Power Level :to Which Restricted (If Any) (Mwe-Net) : N/A-
'4. Reasons for' Restrictions:
N/A s
THIS MONTH YR TO DATE CU'iULATIVE
-5. ' Number'of Hours Reactor Critical 720.0 5621.3 115220.0
- 6. Reactor Reserve Shutdown-Houru 0.0 '0. 0 0.0
- 7. Hours Generator On.Line .720.0 5571.6 11~~28.9
- 8. , Unit Reserve Shutdown Hours 0.0 0.0 0.0
'9. . Gross' Thermal Energy Generated.(MWH)' 2085143 15719342 299690158 10; Gross Electrical Energy (MWH) 725080 5445330 101670059 l 11 '. Net Electrical Energy Generated (MWH) 698117 5238191. 97016731 212.. Reactor Service Factor 100.0 85.8. 83.5
- 13. ' Reactor. Availability Factor 100.0 85.8 83.5
- 14 . Unit Service Factor 100.0 85.0 82.3
- 15. Unit Availability Factor 100.0 85.0 82.3 16 ~. Unit Capacity' Factor (Using MDC) 101.6 83.8 78.3
- 17. -Unit, Capacity Factor.(Design Mwe) 100.7- 83.8 77.1 )
- 18. . Unit. Forced Outage Rate. 0.0 1.0 3.7 i l
- 19. Shutdowns Scheduled Over Next 6 Months'(Type, Date & Duration of Each): '
- NONE 2 0 '. If' Shut'Down/at End of Report Period, Estimated Date of Startup: N/A l
.i I
- 21. N/A
~
~ Units in Test; Status-(Prior to Commercial Operation):
l l
l i
i
Director, Office of Resource Management JSeptember Monthly. Operating Report Page.3 )
. . i I
i ATTACHMENT III l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 10/ 6/99 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 SEPTSMBER 1"'9 NO ' . DATE
. TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS NONE 1.0 . REASON
.A: Equipment. Failure B:. Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative
.G: Operational Error H: Other (Explain)
- 2. 0 ' METHOD' 1:' Manual '
2: Manual Scram 3: Automatic Scram 4: Continuation-(Use initial Date) 5: Power Reduction ~(Duration 0.0) 9 . . . Other (Explain) l
F> .
l U 1 Y '. - .
p Director, Offica of Resource Management September-Monthly Operating-Report Page 4 l
. . l l^
ATTACHMENT IV i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i ;
50/395 DOCKET NO.
UNIT V. C. SUMMER I l DATE 10/ 6/99 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 SEPTEMBER 1999 i
i A brief power reduction was performed starting at 22:40 on 9/24/99 lto;supportsturbine control valve testing. Power was reduced to
.91.2% and was restored to 100% at 04:35 on 9/25/99. The plant (
'oparated at 100% power ~at all other times during the month of J September, 1999. j j
i l
4 i
. J 1
1 l
1
7- ,
];.,, MISCELLANEOUS OPERATING STATISTICS'THRU September 1!99 1
VIRGIL C: SUMMER NUCLEAR STATION, UNIT 1 i OPERATING' STATUS- . . . .
Currently Authorized PoweriLevel (MWt):
2900
- Max.-Depend. Capacity (MWe-Net): 954 Design Electrical' Rating (MWe-Net): 963 <
1 Gross Me.ximum . Capacity .' (MWe) : . 1001
. Gross Dependable Capacity (MWe): .1001-LIFE FISCAL YEAR 12 MONTH 3 MONTH OF PLANT TO DATE TOTALS TOTALS Number of Hours Reactor Critical 122554.f 2208.0 7830.3 2208.0
.R =ctor Reserve. Shutdown Hours- 0.0 0.0 MSurs Generator cn Line '120628.3 2208.0 7780.6 2208.0
-Unit Reserve Shutdown Hours 0.0 0.0
. Gross Thermal Energy Generated (MWH)- 314300693'- 2849942 18518889 2849942 Grces' Electrical Energy (MWH) .
106450569 2222610 7634900 2222610
'Nr.t Electrical: Energy Generated (MWH) 101509457- 2130570 7344963 2139570 Rrctor Service Factor 82.9 100.0
.R uctor Availability Factor 82.9 ~100.0
'UnitnService Factor = 81.6 100.0 Unit Availability Factor 81.6 100.0 88.8 100.0 Unit' Capacity Factor.(Using MDC) 76.5 101.5 87.8 101.5 Unit Capacity Factor ' (Design 14We) . 75.3 100.6 Unit: Forced Outage. Rate- 4.0 0.0 0.7
' Forced Outage Hours '4985.7 -0,0- 57.9 0.0 Scheduled Outage Hourn 22275.0 0.0 421.5 0.0
, Equipment Forced Outages: .
3 0 Equivalent Unit Derated Hours
- 377.41 0.90 Equivalent Seasonal Derated Hours *. 21.10 16.35 i
Equivalent Availability Factor
Equivalent Unit Derated' Hours
- for Month: 0.9 Equivalent Seasonal.Derated Hours
- Equivalent Availability Factor * ' for Month: - 9 9.3-
' Equivalent Availability Factor
.Yzar-to-Date Equivalent Availability Factor *: 79.3 Equipment-Forced Outages per 1000 Critical ~ Hours: 0.383 !
Equipment Forced Outages Year-to-Date: 3 j Tot 01' Forced Outages Year-to-Date: 3 i I
- Eased on INPO' Detailed Descriptions'of Overall Performance Indicators and Other Indicators.- December 1987 1
1 i
l 1
l
- h. ,
l
n ,if..- ;. _,.
' , ~. J / 0
. MONTH:TSEPTEMBER :1999
- HOURS GENERATOR ON LINE: '720
- .3 UNIT. AVAILABILITY FACTOR: .100 V. C.-' SUMMER,-UNIT 1 MONTHLY OUTAGE REFORT FOR SEPTEMBER 1999 !
OUTAGE'! START ! END- !. HOURS ! TYPE! REASON FOR OUTAGE ! CORRECTIVE ACTION I
- NO. .' ! TIME . ! DURATIONI . ! !
- _______!.g________g________!________!____t______________._____t____________________
TIME
.NONE' i
i l
k I
i i
I i