ML20035B829
From kanterella
Jump to navigation
Jump to search
ML20035B829 | |
Person / Time | |
---|---|
Site: | Zion File:ZionSolutions icon.png |
Issue date: | 02/28/1993 |
From: | COMMONWEALTH EDISON CO. |
To: | |
Shared Package | |
ML20035B827 | List: |
References | |
PROC-930228, NUDOCS 9304050155 | |
Download: ML20035B829 (107) | |
Similar Documents at Zion | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216G1351999-09-23023 September 1999
[Table view]Rev 5 to Chapter 12 of Zion Annex Odcm ML20209F8321999-06-30030 June 1999 Rev 4,Chapter 12 of ODCM for Zion Annex ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205Q8801999-04-13013 April 1999 Proposed Tech Specs Page 5-9,replacing Operational TSs with Permanently Defueled TSs ML20154E3441998-10-0202 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-39 & DPR-48,eliminating License Conditions No Longer Applicable & Replacing Existing Operational Custom TS with Permanently Defueled TS ML18068A7121998-07-31031 July 1998 Rev 3 to Chapter 12 of Zion Station Odcm. ML20217N9661998-03-31031 March 1998 Revs to ODCM for Zion Station,Including Rev 2 to Chapters 10 & 12 ML20217H9451998-03-30030 March 1998 Proposed Tech Specs Restoring Plant Custom TS Replaced W/ Improved TS by Previous Amend & Reinstating License Condition Deleted by That Previous Amend ML20216G8981998-03-16016 March 1998 Certified Fuel Handler Training & Retraining Program ML20202H3641997-11-28028 November 1997 Proposed Improved TSs Using Guidance Provided in NUREG-1431 ML20199D6251997-11-10010 November 1997 Proposed Improved TS Bases Changes & Supporting Info & Final Proposed TS Bases for Section 3.3,including Revised Table of Contents & List of Effective Pages ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20212B4761997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Dept Start- Up Readiness Assessment Guideline ML20212B4421997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Plan ML20212B4471997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Scope Mgt Guideline ML20212B4601997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Sys Readiness Review ML20211B4831997-09-0505 September 1997 Restart Action Plan ML20211B9941997-08-0606 August 1997 Proposed Improved Tech Specs Re Draft SER for Zion Station Conversion,Per NUREG-1431 ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20140D8071997-06-0606 June 1997 Proposed Tech Specs Using Guidance Provided in NUREG-1431,to Produce Set of Improved TS for Plant ML20140C4151997-06-0505 June 1997 Rev 1 to Zion Nuclear Station Recovery Plan ML20148B7371997-05-0808 May 1997 Proposed Tech Specs Re Addition of Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification ML20134J2971997-02-0303 February 1997 Proposed Tech Specs Suppl to 960920 Application for Amend to Licenses DPR-39 & DPR-48,providing Annotated & Clean Copies of ITS Pp Affected by Proposed Amend ML20216E6041997-01-31031 January 1997 Amend 4 to Zion Station Fire Protection Rept ML20137B4691997-01-31031 January 1997 Rev 1.9 to Chapter 10, Zion Annex Index & Rev 1.8 to Chapter 12, Radioactive Effluent Technical Stds ML20134G0991997-01-27027 January 1997 Proposed Tech Specs Re Revising TS Such That Use of Entire Abb/Ce TR,CEN-629-P,would Be Authorized as Governing Document for Installing CE Sleeves in SG Tubes ML20133D0901997-01-0202 January 1997 Proposed Tech Specs Using Guidance in NUREG-1431 to Produce Improved TSs ML20132B8331996-12-11011 December 1996 Proposed Tech Specs Completely Revising TS Using Guidance Provided in NUREG-1431, Std Ts,Westinghouse Plants ML20134J3641996-11-0808 November 1996 Proposed Tech Specs Re Rquirements Governing RCS Pressure & Temp Limits ML20134G5921996-11-0707 November 1996 Proposed Tech Specs 3.13.1.A Re Limiting Operation for Operation ML20134G4141996-11-0707 November 1996 Proposed Tech Specs Table 3.7-1 Re Reduced Power Range Neutron Flux High Setpoint Trip ML20134G3401996-11-0707 November 1996 Proposed Tech Specs 4.3.1.A.4.b Re Surveillance Requirement ML20129J7731996-11-0101 November 1996 Proposed Tech Specs Modifying Section 3.15.2.A & Section 4.15.2.A of TS ML20134H4591996-10-31031 October 1996 Rev 1.8 to Chapter 10 Odcm,Zion Annex Index ML20128Q8891996-10-14014 October 1996 Proposed Tech Specs 3.3.2.G Re Limiting Condition for Operation & 4.3.2.G Re Surveillance Requirements ML20128L8371996-10-0404 October 1996 Proposed Tech Specs Re Implementation of Option B to 10CFR50,App J ML20128H3011996-10-0404 October 1996 Proposed Tech Specs,Clarifying & Adding Mode of Applicability for Rod Position Indicator Channels to TS ML20128L7831996-10-0404 October 1996 Proposed Tech Specs Modifying F* Distance Definition ML20129E5621996-09-30030 September 1996 Rev 1.1 to Chapter 11 to Odcm,Zion Annex Index ML20129J4891995-10-0404 October 1995 On-Site Review for ODCM Revision ML20059H5811994-01-19019 January 1994 Proposed Tech Specs Revising RCS Temperature Required for Reactor Criticality,In Addition to Editorial Changes in Affected Specifications ML20058C3031993-11-19019 November 1993 Proposed Tech Specs Changing LTOP of Reactor Vessel ML20058A2651993-11-10010 November 1993 Proposed Tech Specs Re Limitations on Radioactive Matl Released in Liquid & Gaseous Effluents & New 10CFR21 ML20059H9541993-11-0404 November 1993 Proposed Tech Specs Revising Surveillance Frequency & Acceptance Criteria ML20058E8751993-09-0303 September 1993 Revised AOP-6.3, Loss of RHR Shutdown Cooling ML20056F7291993-08-23023 August 1993 Proposed Tech Specs for Implementation of Latest Rev to 10CFR20, Stds for Protection Against Radiation ML20056H0281993-08-20020 August 1993 Errata to Chapter 12 to ODCM, Including Revised Table 12.2-1,12.2-3 & 12.5-1 ML20056G8131993-06-30030 June 1993 Pump & Valve Inservice Testing Plan for Zion Nuclear Generating Station Units 1 & 2 ML20058E8351993-06-10010 June 1993 Revised AOP-7.4, Control Room Inaccessibility ML20044H1091993-06-0202 June 1993 Rev 04/93 to, Second 10-Yr Interval Pump & Valve Inservice Testing Plan for Zion Nuclear Generating Station,Units 1 & 2 1999-09-23 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20216G1351999-09-23023 September 1999
[Table view]Rev 5 to Chapter 12 of Zion Annex Odcm ML20209F8321999-06-30030 June 1999 Rev 4,Chapter 12 of ODCM for Zion Annex ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML18068A7121998-07-31031 July 1998 Rev 3 to Chapter 12 of Zion Station Odcm. ML20217N9661998-03-31031 March 1998 Revs to ODCM for Zion Station,Including Rev 2 to Chapters 10 & 12 ML20216G8981998-03-16016 March 1998 Certified Fuel Handler Training & Retraining Program ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20212B4421997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Plan ML20212B4471997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Scope Mgt Guideline ML20212B4601997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Sys Readiness Review ML20212B4761997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Dept Start- Up Readiness Assessment Guideline ML20211B4831997-09-0505 September 1997 Restart Action Plan ML20140C4151997-06-0505 June 1997 Rev 1 to Zion Nuclear Station Recovery Plan ML20137B4691997-01-31031 January 1997 Rev 1.9 to Chapter 10, Zion Annex Index & Rev 1.8 to Chapter 12, Radioactive Effluent Technical Stds ML20216E6041997-01-31031 January 1997 Amend 4 to Zion Station Fire Protection Rept ML20134H4591996-10-31031 October 1996 Rev 1.8 to Chapter 10 Odcm,Zion Annex Index ML20129E5621996-09-30030 September 1996 Rev 1.1 to Chapter 11 to Odcm,Zion Annex Index ML20129J4891995-10-0404 October 1995 On-Site Review for ODCM Revision ML20058E8751993-09-0303 September 1993 Revised AOP-6.3, Loss of RHR Shutdown Cooling ML20056H0281993-08-20020 August 1993 Errata to Chapter 12 to ODCM, Including Revised Table 12.2-1,12.2-3 & 12.5-1 ML20056G8131993-06-30030 June 1993 Pump & Valve Inservice Testing Plan for Zion Nuclear Generating Station Units 1 & 2 ML20058E8351993-06-10010 June 1993 Revised AOP-7.4, Control Room Inaccessibility ML20044H1091993-06-0202 June 1993 Rev 04/93 to, Second 10-Yr Interval Pump & Valve Inservice Testing Plan for Zion Nuclear Generating Station,Units 1 & 2 ML20035B8291993-02-28028 February 1993 Rev Oj to Odcm ML20035C9771993-02-26026 February 1993 Offsite Dose Calculation Manual Generic Sections, Rev 0.K ML20034D5441993-01-13013 January 1993 Rev 0.J to Odcm ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20235T6421987-12-31031 December 1987 Rev 11A to Offsite Dose Calculation Manual. Rev 11B to Table of Contents Also Encl ML20237F6641987-02-27027 February 1987 Revised Procedure PT-18, Control Room Charcoal Booster Fans Test ML20210U0861987-01-27027 January 1987 Procedure 91-614-04-123, Human Factors Integration of Zion Nuclear Generating Station Reg Guide 1.97 Program ML20236R9811986-08-28028 August 1986 Ae Project Plan for Evaluation of Pressurizer Safety & Relief Valve Discharge Piping Subsystem ML20205F8061986-07-25025 July 1986 Rev 0 to Procedure TSGP-47, Control Room Ventilation Sys Ductwork In-Leakage Test ML20206J6961986-06-17017 June 1986 Rev 2 to Inservice Insp & Test Program Second Interval ML20203L3551986-04-30030 April 1986 Rev 0 to Comm Ed Training Program Description for Station Control Room Engineer/Shift Technical Advisor ML20210A5651985-12-27027 December 1985 Rev 0 to Emergency Procedure ES-1.1, SI Termination ML20136G3371985-11-0808 November 1985 Suppl 4 to NUREG-0737 Suppl 1 Dcrdr Program Plan ML20207N3261985-08-12012 August 1985 Rev 0 to 2L-517 E, Steam Generator a Level Channel Electronics ML20207N3201985-08-0606 August 1985 Rev 0 to 2L-517 T, Steam Generator a Level Transmitter ML20140D0761985-06-30030 June 1985 Rev 11 to Sections 7.2 & 8.0 of Offsite Dose Calculation Manual ML20127K1211985-04-27027 April 1985 Rev 0 to Procedure Zap 6-52-5, Zion Station Equipment Technical Info Control Program ML20237F6791985-03-26026 March 1985 Revised TSS 15.6.14A, Activated Carbon Filter In-Place Leak Test ML20237F6931985-03-26026 March 1985 Revised TSS 15.6.14B, HEPA Filter Banks In-Place Leak Tests ML20237F7271985-03-26026 March 1985 Revised TSS 15.6.14C, Activated Carbon Filters Lab Analysis ML20140G0341984-04-25025 April 1984 Rev 10 to Procedure TSS 15.6 10A, Type a Containment Leak Rate Test ML20024E7771983-07-11011 July 1983 Public Version of Revised Environs Group Emergency Plan Implementing Procedures.Two Oversize Drawings Encl.Aperture Cards Available in PDR ML20024E0961983-06-10010 June 1983 Public Version of Rev 1 to Emergency Plan Implementing Procedure EPIP 550-4, Onsite Radiological Emergency Response Equipment & Receipt Form ML20024B9701983-05-17017 May 1983 Public Version of Rev 4 to Emergency Plan Implementing Procedure EPIP 420-1, Technical Support Ctr Quarterly Surveillance ML20028B9631982-11-24024 November 1982 Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 350-1, Quick Estimate of Offsite Dose from Unplanned Release ML20027E8001982-11-10010 November 1982 Revised Pages for Inservice Testing Program for Pumps & Valves 1999-09-23 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20035B829&oldid=4577845"