ML20024B970

From kanterella
Jump to navigation Jump to search
Public Version of Rev 4 to Emergency Plan Implementing Procedure EPIP 420-1, Technical Support Ctr Quarterly Surveillance
ML20024B970
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/17/1983
From: Nykirk J
COMMONWEALTH EDISON CO.
To: Harold Denton
NRC
Shared Package
ML20024B966 List:
References
A-83-187, EPIP-420-1-01, EPIP-420-1-1, NUDOCS 8307120064
Download: ML20024B970 (6)


Text

-

p.i 6,lo$ ZAP 5-514 Rev O

' STATION PROCEDURE CHANGE REQUEST h/AP"595f3 HANGE Procedure Intent changes require Station Review before using.

Procedure changes with prior Station Review do not need SRO approval.

REQUESTg,py,j B

PROCEDURE TITLE MBER -

0~/

/#

///

Permanent Change CV New Procedure O

Special Procedure O

Desired Elfactive Permanent Change Needed De M -' / O -

Yes C No C dIb d Briei Description (M

'a f

O

[

MMt

[

h i[

Reeson for change O'

L.M L M J.'

d

0

[0

  • E

~ '

Requested B Date Department 98 i'

s u

o

's o L

gg Temporary Change Approval (No intent change.14 days review) l Nk i Be

!Qh Dept. Supervisor Date SRO Date I

1 r

Yes No d Is a change to the Technical Specifications needed?

Is the probability of an occurrence or the consequence of an accident or malfunction of equipmqnt important to pafty as previously evaluated in the SAR increased?

Yes No

'/

Because:

/

Is the possibility for an accident or malfunction of a different typeNo j Because:

Yes than any previously evaluated in the SAR created?

nyptb

(

7 Is the margin of safty, as defined in the pasis for any Technical Specification, reduced? Yes No

/ Because:

t

/

1 Date Prepared By

}

}

l' Permanent Review Temporary Review Signature Date Appr.

Not Appr, Signa re Date Appr. Not Appr.

Q h//fm Y24l8 h b

I M T h E __

O O

O O

O Station Superintendent:

~

If not approved, explain:

AY Wed-T-lJ 43 Effective Date Station' Superintendent Appr. Date (if different from (Appr. for pe m. use) appr. date)

EERGEtCY PLAN IWLEKNTING PROCEDURES INDEX Nt.NBER TITLE DATE 370-2 First Aid and Decontamination 2-18-81 410-1 On-site Support Center 1-21-83 420-1 Technical Support Center Quarterly Surveillance MAY 171983 440-1 Emergency Communications 3-25-83 450-1 Emergency Operations Facility Quarterly Surveillance 12-15-81 510-1 Maintainirg Emergerey Preparedness 2-18-81 510-2 GSEP Training Requirements for Rad / Chem Technicians 12-21-82 550-1 On-Site NorMadiological Emergency Resoonse Equipment 6-22-82 550-2 Environmental Emergency Kit and Emergency Operations Facility Eadiological Equipment 3-08-83 550-3 Radiological Supplies for Medical Emergencies 9-03-82 550-4 On-Site Radiological Emergency Response Equipment 10-05-82 550-5 Technical Support Center and Cperational Support Center Radiological Supplies 10-05-82 550-6 Monthly Radiological Emergency Equipment Tests and Checks 9-03-82 700-1 Emergency Ricne List 4-19-83 ATTACHMENT 1 Spill Preventien Control & Countermeasure Plans 12-15-81 APPROVED Ub 0039E 2

.D\\~~ b 0006A

TECHNICAL StPPORT CENTER QUARTERLY SURVEILLAtCE i

EPIP 420-1.

TAa.E OF CONTENTS SECTION TITLE PAGE DATE REVISION Table of Contents 1

AIAY 1 7 1983 5

A Purpose 2

12-15-81 2

8 References C

Prerequisites O

Precautions E

Limitations & Actions F

Procedure 3

12-15-81 1

G Checklist H

Tecnnical Specification / References Attachnent A 4

MAY 171983 4

Attachment B 5

3-25-82 3

1 This procedure contains 5 pages.

APPROVED

$~~- P L

1

@)

EPIP 420-1 R3v. 4 MAY 171983 ATTACHENT A TSC EQUIPENT OPERATIONAL CHECKLIST EQUIPENT PASSED FAILED COMENTS Telecopier Copier Food Supply f

d Cate:

Initials:

e 0042E 4

0006A

_. y...

~ ~ ~ '~ ~-

(

C E i' A-83e187 EPIE 420-1 NOTIFICATION OF PROCEDURE CHA'GE 5-4 e -

Mr/Ms

[

% _ Book #(s)

_ O d_ y

' ACP - Abnormal Operating Procedures EGP - Emergency Operating Procedures X _

EPIP -. Emergency Plan Implementing Prodedures*

,1lFHIg,(FuelHandling'In(tructions

' COP - General Operating Procedures MI Maintenance Instructions PT

- : Periodic Test Procedures ~

I

. RP -

-- (Radiation Protection Procedures

~

~

u(50I' '-? System Operating lIn'structions

~

.TSS c-f; Technical Staff Surveillances

' ZAP - Zion Administrative Procedures ZCP '- Zion Chemistry Procedures ZED' - -Zion Electrical Distribution ANNt#CIATOR RESENSE MANUAL CURVE BOOK FSAR - Final Safety Analysis Report ZION TECH SPECS - Technical Specifications,-

Filino Instructions:

Please revise'per attached changes to EPIP Index, pg.

2, and EPIP 420-1, pgs. 1 & 4.

May 17, 1983

~

m y y-s Please acknowledge receipt of the above listed procedure (s), instruction (s) or'

, revision (s) by returning this receipt letter to L. Minejevs, Zion Station..

4

,a

, x > w.c/t W E v,~+

.... ~,-

W""

Signed Date l

//

G.' Plimi o$

7 Asst Superintendent Yg lI Zion Station lj c-nLach - 00^

GE

^

FOR OFFICE USE CNLY Receiot Audit:

Date Of Audit Recelots Not Received Receiots Recuested All procedure (s), instruction (s) or revision (s) listed ware distributed on in accordance with the Zion Distribution List.

nn w,,,

7 y7-

-' - ~ ~ ~

}

~ '

'