Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20205Q8801999-04-13013 April 1999 Proposed Tech Specs Page 5-9,replacing Operational TSs with Permanently Defueled TSs ML20199E0361999-01-12012 January 1999 Proposed Tech Specs Section 3.10, Fuel Handling & Storage, Eliminating Reference to Initiation of Generating Station EP Action That Is Incorrect & Not Part of Reason for Min FSP Water Level TS ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20154E3441998-10-0202 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-39 & DPR-48,eliminating License Conditions No Longer Applicable & Replacing Existing Operational Custom TS with Permanently Defueled TS ML20217H9451998-03-30030 March 1998 Proposed Tech Specs Restoring Plant Custom TS Replaced W/ Improved TS by Previous Amend & Reinstating License Condition Deleted by That Previous Amend ML20202H3641997-11-28028 November 1997 Proposed Improved TSs Using Guidance Provided in NUREG-1431 ML20199D6251997-11-10010 November 1997 Proposed Improved TS Bases Changes & Supporting Info & Final Proposed TS Bases for Section 3.3,including Revised Table of Contents & List of Effective Pages ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20211B9941997-08-0606 August 1997 Proposed Improved Tech Specs Re Draft SER for Zion Station Conversion,Per NUREG-1431 ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20140D8071997-06-0606 June 1997 Proposed Tech Specs Using Guidance Provided in NUREG-1431,to Produce Set of Improved TS for Plant ML20148K6141997-06-0505 June 1997 Proposed Tech Specs,Updating Revised TS to Format Consistent W/Recently Approved TS Upgrade for DNP & Proposed Other Miscellaneous Changes Re Decommissioning Status of Unit 1 ML20148B7371997-05-0808 May 1997 Proposed Tech Specs Re Addition of Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification ML17187A7991997-02-17017 February 1997 Proposed Tech Specs 3/4.7.K & 3/4.8.C Re Issues Resulting from Comeds Efforts to Reconstitute Design Basis of Chrs ML20134J2971997-02-0303 February 1997 Proposed Tech Specs Suppl to 960920 Application for Amend to Licenses DPR-39 & DPR-48,providing Annotated & Clean Copies of ITS Pp Affected by Proposed Amend ML20134G0991997-01-27027 January 1997 Proposed Tech Specs Re Revising TS Such That Use of Entire Abb/Ce TR,CEN-629-P,would Be Authorized as Governing Document for Installing CE Sleeves in SG Tubes ML20133D0901997-01-0202 January 1997 Proposed Tech Specs Using Guidance in NUREG-1431 to Produce Improved TSs ML20132B8331996-12-11011 December 1996 Proposed Tech Specs Completely Revising TS Using Guidance Provided in NUREG-1431, Std Ts,Westinghouse Plants ML20135B0581996-11-25025 November 1996 Proposed Tech Specs,Submitting Update to Administrative Controls Section of TS Which Reflects Transition of Overall Corporate Responsibility for Storage of Spent Nuclear Fuel ML20134J3641996-11-0808 November 1996 Proposed Tech Specs Re Rquirements Governing RCS Pressure & Temp Limits ML20134G5921996-11-0707 November 1996 Proposed Tech Specs 3.13.1.A Re Limiting Operation for Operation ML20134G4141996-11-0707 November 1996 Proposed Tech Specs Table 3.7-1 Re Reduced Power Range Neutron Flux High Setpoint Trip ML20134G3401996-11-0707 November 1996 Proposed Tech Specs 4.3.1.A.4.b Re Surveillance Requirement ML20129J7731996-11-0101 November 1996 Proposed Tech Specs Modifying Section 3.15.2.A & Section 4.15.2.A of TS ML20129F3231996-10-23023 October 1996 Proposed Tech Specs Replacing All Existing Pages of Unit 1 TS ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20128Q8891996-10-14014 October 1996 Proposed Tech Specs 3.3.2.G Re Limiting Condition for Operation & 4.3.2.G Re Surveillance Requirements ML20128L8371996-10-0404 October 1996 Proposed Tech Specs Re Implementation of Option B to 10CFR50,App J ML20128L7831996-10-0404 October 1996 Proposed Tech Specs Modifying F* Distance Definition ML20128H3011996-10-0404 October 1996 Proposed Tech Specs,Clarifying & Adding Mode of Applicability for Rod Position Indicator Channels to TS ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20113B6001996-06-20020 June 1996 Proposed Tech Specs,Incorporating New NRC Approved Thermal Limit Licensing Methodology in List of Approved Methodologies Used in Establishing Thermal Limits in Cycle Specific COLR & Change to Fuel Assembly Design Features ML20112E6341996-05-22022 May 1996 Proposed Tech Specs Requesting Emergency Amend to License DPR-25 Temporarily Modifying Description of Certain Corner Room Steel Supports to Match Current Configuration Until Mod During Next Refueling Outage ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20059H5811994-01-19019 January 1994 Proposed Tech Specs Revising RCS Temperature Required for Reactor Criticality,In Addition to Editorial Changes in Affected Specifications ML20058C3031993-11-19019 November 1993 Proposed Tech Specs Changing LTOP of Reactor Vessel ML20058A2651993-11-10010 November 1993 Proposed Tech Specs Re Limitations on Radioactive Matl Released in Liquid & Gaseous Effluents & New 10CFR21 ML20059H9541993-11-0404 November 1993 Proposed Tech Specs Revising Surveillance Frequency & Acceptance Criteria ML20056F7291993-08-23023 August 1993 Proposed Tech Specs for Implementation of Latest Rev to 10CFR20, Stds for Protection Against Radiation ML20127N0531992-12-22022 December 1992 Proposed Tech Specs to Relocate Fire Protection TSs to an owner-controlled Document Consistent W/Guidance Provided in Generic Ltrs 86-10 & 88-12 ML20125D6381992-12-0808 December 1992 Proposed Tech Specs 3/4.1 Re Reactor Protection Sys ML20106A6221992-09-15015 September 1992 Proposed TS 2.0, Safety Limits & Limiting Safety Sys Settings & 3/4.11, Power Distribution Limits ML20127C6521992-09-0101 September 1992 Proposed TS for License Amend Request 92-03 Re Reactor Vessel Integrity & RCS Heatup & Cooldown Limitation Curves ML20099D7791992-07-29029 July 1992 Proposed Tech Specs Sections 1.0, Definitions, 3/4.0, Applicability & 3/4.3, Reactivity ML20096F1161992-04-24024 April 1992 Proposed Ts,Changing OL Section 2.G Re Reporting Requirements ML20058L9381990-07-31031 July 1990 Proposed Tech Specs Reflecting Nonoperating Status of Facility & Clarifying Section 3.10.F ML20248G1221989-09-29029 September 1989 Proposed Tech Spec Page 210 Re Containment Isolation ML20248B3991989-09-25025 September 1989 Proposed Tech Specs to App a Re Section 3.9 Containment Isolation ML20247D0841989-07-18018 July 1989 Proposed Tech Specs,Removing Section 3/4.17.2, Aircraft Fire Detection Sys 1999-04-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216G1351999-09-23023 September 1999 Rev 5 to Chapter 12 of Zion Annex Odcm ML20209F8321999-06-30030 June 1999 Rev 4,Chapter 12 of ODCM for Zion Annex ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205Q8801999-04-13013 April 1999 Proposed Tech Specs Page 5-9,replacing Operational TSs with Permanently Defueled TSs ML20205A0871999-03-22022 March 1999 Revs to Odcm,Including Rev 2.0 to Chapter 10, Radioactive Effluent Treatment & Monitoring & Rev 1.9 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20199E0361999-01-12012 January 1999 Proposed Tech Specs Section 3.10, Fuel Handling & Storage, Eliminating Reference to Initiation of Generating Station EP Action That Is Incorrect & Not Part of Reason for Min FSP Water Level TS ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20154E3441998-10-0202 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-39 & DPR-48,eliminating License Conditions No Longer Applicable & Replacing Existing Operational Custom TS with Permanently Defueled TS ML20237A8651998-08-0707 August 1998 Qualified Unit 1 Supervisor Initial & Continuing Training Program ML18068A7121998-07-31031 July 1998 Rev 3 to Chapter 12 of Zion Station Odcm. ML20151S2691998-07-31031 July 1998 Rev 1.8 to Chapter 12 of Dresden Station Odcm ML20217N9331998-04-30030 April 1998 Rev 1.7 to Chapter 12 of Dresden Station Odcm ML20217N9661998-03-31031 March 1998 Revs to ODCM for Zion Station,Including Rev 2 to Chapters 10 & 12 ML20217H9451998-03-30030 March 1998 Proposed Tech Specs Restoring Plant Custom TS Replaced W/ Improved TS by Previous Amend & Reinstating License Condition Deleted by That Previous Amend ML20216G8981998-03-16016 March 1998 Certified Fuel Handler Training & Retraining Program ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20216H8551997-12-31031 December 1997 Revs to OCDM for Dresden Station,Including Rev 1.9 to Chapter 10,rev 1.3 to Chapter 11,rev 1.6 to Chapter 12 & Rev 1.1 to App F ML20198M2491997-12-18018 December 1997 Revs to Ocdm,Including Rev 1.3 to Chapter 11, Radiologicial Environ Monitoring Program & Rev 1.6 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20202H3641997-11-28028 November 1997 Proposed Improved TSs Using Guidance Provided in NUREG-1431 ML20199D6251997-11-10010 November 1997 Proposed Improved TS Bases Changes & Supporting Info & Final Proposed TS Bases for Section 3.3,including Revised Table of Contents & List of Effective Pages ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20212B4761997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Dept Start- Up Readiness Assessment Guideline ML20212B4601997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Sys Readiness Review ML20212B4471997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Program,Scope Mgt Guideline ML20212B4421997-10-22022 October 1997 Rev 3 to Zion Nuclear Station Recovery Plan ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20212A2941997-10-0202 October 1997 Rev 56 to Dresden Nuclear Power Plant for Insertion in NRC Security Plan.Rev Withheld ML20211B4831997-09-0505 September 1997 Restart Action Plan ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20211B9941997-08-0606 August 1997 Proposed Improved Tech Specs Re Draft SER for Zion Station Conversion,Per NUREG-1431 ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20140D8071997-06-0606 June 1997 Proposed Tech Specs Using Guidance Provided in NUREG-1431,to Produce Set of Improved TS for Plant ML20148K6141997-06-0505 June 1997 Proposed Tech Specs,Updating Revised TS to Format Consistent W/Recently Approved TS Upgrade for DNP & Proposed Other Miscellaneous Changes Re Decommissioning Status of Unit 1 ML20140C4151997-06-0505 June 1997 Rev 1 to Zion Nuclear Station Recovery Plan ML20141A6411997-05-31031 May 1997 Rev 1.4,Chapter 12 to Radiological Effluent Technical Stds (RETS) of ODCM ML20148B7371997-05-0808 May 1997 Proposed Tech Specs Re Addition of Discussion of Position & Duties of Licensed Operators & Senior Licensed Operators to Section 5.3, Qualification ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML17187A7991997-02-17017 February 1997 Proposed Tech Specs 3/4.7.K & 3/4.8.C Re Issues Resulting from Comeds Efforts to Reconstitute Design Basis of Chrs ML20134J2971997-02-0303 February 1997 Proposed Tech Specs Suppl to 960920 Application for Amend to Licenses DPR-39 & DPR-48,providing Annotated & Clean Copies of ITS Pp Affected by Proposed Amend ML20137B4691997-01-31031 January 1997 Rev 1.9 to Chapter 10, Zion Annex Index & Rev 1.8 to Chapter 12, Radioactive Effluent Technical Stds ML20216E6041997-01-31031 January 1997 Amend 4 to Zion Station Fire Protection Rept ML20137C0011997-01-31031 January 1997 Odcm,Dresden Annex Revs 1.9 to Chapter 10, Radioactive Effluent Treatment & Monitoring, 1.2 to Chapter 11, Radiological Environ Monitoring Program & 1.3 to Chapter 12, Radiological Effluent Technical Standards ML20134G0991997-01-27027 January 1997 Proposed Tech Specs Re Revising TS Such That Use of Entire Abb/Ce TR,CEN-629-P,would Be Authorized as Governing Document for Installing CE Sleeves in SG Tubes ML20133D0901997-01-0202 January 1997 Proposed Tech Specs Using Guidance in NUREG-1431 to Produce Improved TSs ML20132B8331996-12-11011 December 1996 Proposed Tech Specs Completely Revising TS Using Guidance Provided in NUREG-1431, Std Ts,Westinghouse Plants ML20135B0581996-11-25025 November 1996 Proposed Tech Specs,Submitting Update to Administrative Controls Section of TS Which Reflects Transition of Overall Corporate Responsibility for Storage of Spent Nuclear Fuel ML20134J3641996-11-0808 November 1996 Proposed Tech Specs Re Rquirements Governing RCS Pressure & Temp Limits ML20134G5921996-11-0707 November 1996 Proposed Tech Specs 3.13.1.A Re Limiting Operation for Operation ML20134G4141996-11-0707 November 1996 Proposed Tech Specs Table 3.7-1 Re Reduced Power Range Neutron Flux High Setpoint Trip 1999-09-23
[Table view] |
Text
.. - ._ __ . _ _ _ _ __ . -. __ _ _ _ . . . . - . -- _ - _..._m_..
k i
4 a
)
ATTACHMENT C Marked-up Copies Zion Technical Specifications 9
Affected Pages
)
-i 9707230152 970718 DR ADOCK 05000295 - ,
PDR
\
- - w
/6 M ed h
@ Technical Review and Control a sa kid s % Q _
3,3, J Procedures required by Specification and other procedures which affect nuevear safety, as determined by the Station Manaaer,, and changes there o, other than editorial or t - ra hical changes, shall be reviewed ~
prior-FrimpienenratioMas follo cept n ed 6acer4.h [ Each procedure knowledgeable oraffected(asp in the area procedure change
+scany sha1T the individual befindependently who prepared the procedure or proceaunt reviewed by a change. This review shall include a determination of whether or not additional cross-disciplinary M"#9e r reviews are necessary. If deemed necessary, the reviews shall be performed by the qualified review personnel of the appropriate ~ discipline (s).
[ ANSI N18.1 - 1971, Individuals sections 4.2 and 4.4 performing these and be approved by reviews the Stationshall Manage meet . thef applicable or- ct 48 6emem experienc Ma.m a.) e t-
/. Applicable Procedures,[ministrative and changesrocedures t ereto shallrecommended be submitted to by the Regulatory Onsite Review Guide 1.33, PlantPmction and Investigative Emergencyfor Opera review and approval prior to implementation.
[ Review of the procedure or procedure change will include a determinas.. nr not an unreviewed safety question is involved. This determinatio kwill be based on the ro " " safety evaluation prepared by a qualified individual, or documentation that a sat, i not required.
Onsite Review, Offsite Reviey and Commission approval of items involving e-- questions shall be obtained prior toJtation approval for implementation.
[ The[epartment[ead approval authority shall be as specified in station proc 3dures.
[.Writtenrecordsofreviewsperformedinaccordancewiththis_ spec _1 fica on shall be prepared and maintained accordance with n ::: :::t::: 5.5.1. o]o{5fec.t/oA l-).
3 3 2. p. ditorial W ypographical chan es_shall_be ==4 in_ accordance with station procedures.
e1 va red by 3.3.D 1:f 0 1 : ;.= ;r may be made provided:
%pTemporary changes to proceduresOc::::n:: :.. ;.;;;rke.l.... G.2_
- _ _-] [ The intent of the original procedure is not altered.
T tmforAry[. The change is approved by two members of the plant management staff, at least one of who
{ b"'J"3 Reactor Operator's License on the unit affectcd.
g.Thechangeisdocumented,reviewedandapprovedinaccordancewithS;::t't:Micr 5.0 7 within 14 days of implementation.
haehD y
M_a _D S
- ~ . - ~ _ . _ . _ _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _
~ ~~ ~~ ~ ~ ?
v N $f'L M S$t fred fo ft, g Q7 g)
= m ,
^ ' ~
w m 6.4 Action to be Taken in the Event a Safety Limit is Exceeded: '
If a safety limit is exceeded, the reactor shall be tripped immediately and reactor operation shall. not be res until authorized by the NRC. The conditions of shutdown shall be promptly reported to the Site Vice President or : (1 his designated alternate. The incident shall be reviewed by both the Offsite and Onsite Review and Investigative ? j Functions and a separate report for each occurrence shall be prepared in accordance with 10 CFR 50.36.
'*5 hIb. Yorels a m I/o f f.op,$ f eA.F c'fe Ne b &
elative _to the_ following_ items shall bearetained for_at Tan =1 five wears:
O [ Record eJ12de kLinase rqnmvemS.t Fer tedieM &5d]Lhiola k
- operation at each power level.
[ Recorifs of normal plant operation, including power ievels and peri a. s -
@o f principal maintenance activities, including inspectiong ropa i
$ regarding c
Recordr ~
l l
principal items of equipment pertaining to nuclear safety. / t j .
L W occurrences] gf we g nd y i :
- g. Records and reports of eportabl e_c l. m., c =
t -- rveillance Records and periodic check ns ction and/or calibrations performed to verify the l g(equirements "::' %; C pecificationsgarebeingmet. All equipneret fall ng to meet _
surveillance requ'roments an the corrective act on ta 1 i . y WJ4 4 a ffe c h' ucJeet - l
- h. h Records of changes made to procedures required by'5 peed ficationse.:.; ::: :.0.g *te S ty,a.s derew.inseaf l
[ Records of radioactive shipments. .hy f4 e CA fjo, A,,O,f
. \ Or Pla.mt GemaraJ2 1 e j
- g. Records of physics tests and other tests pertaining to nuclear safety.
[
~
== led source and fission detector leaii tests and results. (flom))
[ Shif nee a,,hd.
o f h By-product material inventory recordsg med _f - -
e rham +
LJ3ef. sese A tle m da,e m j
$ .5.to.t.
Recordie Ree e r~dstoa.md/ee r elative the followlopsIng items s_ hall beeretained _for the c
< 6Lsd/oh oi'h &ofded Em C Mmme + cas4miemyge r u.a e u n ,
[. Substitution w replacement or principal items of equipment pertaining' to nuclear sa"ety.- l I anges made to ? u r: ::d:;?innydescribed
[ h$t:ssendeuttgg[is in tte Safety Analys Report. _
t c#IA*
_[45171-- !
\
(~
2 W '171 and 153 [
' N 1
.s
_-...._.__.m.__._____.__-.-_._-__.__.__._.__._._.______._.. . _ _ . . _ . _ . _ . . . . _ .
1 t
i (T.5 A vedy g Records of new and 6 fuel inventory (f r3andassembly histories. -
[. 'I Updated, corrected. and as-built drawings of the. plant.
[.
Records of plant radiation and contamination surveys.
[ j
[. Records of offsite environmental monitoring surveys.
i Records of radiation exposure for all plant personnel, including all contractors and v!sitors (o the
[. plant in accordance with 10 CFR 20.
}
l Records of radioactivity in liquid and gaseous wastes released to the environment.
Records of transient or operational cycling for those components that have been designed to operate safely for a limited number of transient or operational cycles. g j7 j; - - gj . --- .
j
^ -
[ Records of 6 members I'f " d' , s. s si, , ,
Inservice inspections and testing performed pursuant to the Technical Specifications gy
% 4 Minutes of meetings and results of reviews performed br the Offsite and Onsite 61eview Functions.
[ 1 i
N Records of secondary water sampilng and utter _emalltjr,9eao=1) h ,
i Tide inrE cover-ed Umnlot" ik reu $ doms ei the S$41Ibass !
I g, h Records for / vironmental alification{
.glok UFS&AG Te.ble IC3-I&
Tiect mical i
Qwfions. l incl 1 ding the date at which j M Records of the service lives of all snubbers covered by the service life commences and associated Installation a enance ocords. (tJom) j g, h Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10CFR 50.59. (tJed
h Records of Quality Assurance activities required by the QgAg Manualg 78./r e mtalm fa.) e/
f { $ C o r d i,j
% Records of reactor tests and experiments.[fie )
hR o ws e o d for changes made to the
[
\ I
/femendmey146 and 13Q-
\ l