LER 82-045/01T-0:on 821109,during Normal Operation,Diesel Generator D-3 Tripped on Low Cooling Water Pressure.Caused by Bad Low Cooling Water Pressure Switch.Switch Replaced
ML20028B096
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/18/1982
From: Rhee S
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20028B087 List:
References
LER-82-045-01T, LER-82-45-1T, NUDOCS 8211290452
Download: ML20028B096 (2)


Text

rum,, runne .io.

U.S. NUCLEAR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT

  • CONiROL BLOCK: l 1

l l l l l 6

l@ (PLEAss PRINT OR TYPE ALL REQUIRED INPORMATION)

@ l 8I l9 L l D l R l S l 3 l@l 0 l 0l -l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1 l.l lgl l lg 7 uCENSEE CODE I4 15 uCENSE NuMSER 25 26 uCENSE TYPE 40 5 7 GA T 58 CON'T l0l1l 7 8 sO RCE lL gl0 l5 l0 l0 l0 l2 l 4l 9gl lj lj 0l 9l 8l 2 gl1l 1l 1l 8l 8 l 2 l@

60 63 COCKET NUMSER 64 69 - 74 EVENT OATE 75 REPORT DATE 40 EVENT DEScalPTION ANO PROBA8LE CONSEQUENCES h 10l2l l During normal operation, as a result of the U-2/3 D/G being declared inoperable, the l

[TTT] l Unit 3 D/G surveillance was performed. At 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br />, the D-3 D/G tripped on low l

[6TTl l cooling water pressure and was declared inoperable. At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, a GSEP Unusual l ITTTl i1; vent was declared and an orderly unit shutdown was initiated per Tech. Spec. 3.5.F.1. [

10 Is l l Event was of minimal safety significance since the normal power supply was continuous ;

[0"TT1 5 Ily available. Previous similar event was reported by R.O. 81-46/03L on Docket //50-237.[

101811 l 7 8 9 80 SOTE YO$0 st$ SCC $E CouPONENT CODE 500 CDE S C E Q'

7 8 9lElE 10 l@ lE l@ l El@ l Il H l S l T l R l U 11 12 13 iS l@ l S l@ lZ 19 20 l@

,. SEQUENTIAL OCCURRENCE REPORT REVISION EVENT YEAR R EPORT NO. CODE

@Rg LE R/RO 8

l21 l 222l l_l 23 l 0l 4l 5l 24 25 l/l 27 l0l1l 28 29 TYPE lT l l _l g NO.

00 31 32 N AC O O P T V HOURS 22 58 i POR 8. SL MANUFAC RER ~

l C lgl4 33 3 Zl@ l Bl g JS l6 Zl@

3 l 0l 0l 0l 31 40 l l Ylg 41 l42Y l@ l 43

@ lsl3l4l5l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l o l l The cause of this event was due to bad Low Cooling Water Pressure Switch. The switch,;

fi T"O l class 9012 type ACW SS48. was replaced with class 9012 type GAW-5 and Unit 3 D/G l g,,2, lsuccessfully tested at 1751 hours0.0203 days <br />0.486 hours <br />0.0029 weeks <br />6.662555e-4 months <br /> on 11/12/82. The Unit 3 D/G declared operable prior; l,13l l to the seven day requirement in'the Tech. Spec. The monthly surveillance will con- l g l tinue to be performed per DOS 6600-1. I 7 s 9 so ST  % POWER OTHER STATUS OIS O RY OtSCOVERY DESCRIPTION g l E l@ l 0 l 9 l 8 l@l N/A l lB l@l Diesel Surveillance l A VITY CO TENT KELEASE AMOUNT OF ACTIVITY .

LOCATION OF RELEASE N/A N/A

[IIs'l* W

  1. * @D' OF MELEASEl Z l@l "

l l l

PERSONNEL ExrosuREs NUusER TvPE oEsCmPTiOn h I

l' i 17* ]*l 0l 0 l 0 l@l Z l@l N/A l

2 ia PERsONNEt iNau'R,,, 8211290452 821118 8 NuveER PDR ADOCK 05000249 W l0l0l0l@loEsCmPTiON@

r s 9 is i N /A S PDR 40 l

Los3 OF OR CAMAGE TO FActuTV TYPE CESCR'PTION li191[Zj@l N/A l 7 4 9 in 30 is5ute DE CRIPTION

  • Lu2J8 La181 N/^ i i i i i i i i i v i ! ' I :,

7 9 to 68 69 a0 1 Sang J. Rhec NAME OF PREPARER PHONE:

815-942-2920, X-548  ;,

_- , w- -- _ _

7 ,

e ATTACHMENT TO LICENSEE EVENT REPORT 82-45/0lT-0 COMMONWEALTH EDISON COMPANY (CNE)

DRESDEN UNIT 3 (ILDRS-3)

DOCKET # 050-249 On 11/9/82 at 0320, the D-2/3 Diesel Generator (D/G) trouble alarm annunciated in the control room. Inspection by the operator and foreman deter '_n:.e ciiat the main lubrication oil circulation pump had tripped. ,

Attempts to reset the lubrication oil circulation pump breaker failed. .

U-2/3 D/G was declared inoperable and required ECCS surveillances were immediately initiated on both D2 and D3. At 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br />, the D3 D/G was initially reported as to have tripped on Hi Crankcase Pressure and declared inoperable. Since both D/G's were inoperable, at 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, a GSEP Unusual Event was declared and U-3 commenced shutting down per Tech.

Spec. 3.5.F.1. The effect on public safety was minimal since the normal power supplies were available and the 2/3 D/G was out-of-service for less than ten hours.

At 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br />, the main lubrication oil circulation pump motor on the D-2/3 D/G was replaced and the operability surveillance was success-fully completed. The GSEP Unusual Event and unit shutdown were termina-ted. Further investigation of D-3 D/G revealed the cause to be a bad cooling water pressure switch. The switch was replaced within the seven -

day requirement and the U-3 D/G was returned to service.

9

%