ML20199B070

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1997 for Dresden Nuclear Power Station
ML20199B070
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/31/1997
From: Abrell G, Jamila Perry
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, JSPLTR:-97-0192, JSPLTR:-97-192, NUDOCS 9711180203
Download: ML20199B070 (11)


Text

_.

Onnmonw catth I.diw>n Company

, Drevien Generating % ation 6Mo Nort: Drrvien Road Mornt il 60 650 Trl H15 912-2920

\

November 10,1997 h

JSPLTR: #97-0192

}

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 b

Subject:

Monthly Operating Data Report for October 1997 3

) Dresden Nuclear Power Station Commomvealth Edison Company Docket Nos.50-010,50-237, and 50-249

} Enclosed is the Dresden Nuclear Power Station Monthly Operating Summary Report for ,

October 1997, f

h This information is supplied to your office as required by Technical Specification 6.9. A.5, in accordance with the instructions set forth in Regulatory Guide 1.16. and Generic Letter 97-02. f Sincerely, d[ hk

[J. Step en Perry Site Vice President Dresden Station Enclosure cc: NRC Region 111 OtTice

- Q ", f ,

ll!inois Dept. of Nuclear Safety, State of Illincis

[

NRC Senior Resident Inspector, Dresden Station UDI, Inc. - Washington, DC File / Numerical t: m ,-

_...ri.. >

9711190203 971031 PDR ADOCK 05000010 hh, R PDR '

A i!nicom company

s; .

MONTHLY NRC SUt44ARY OF OPERATING EXPERIENCE,-

PER REGULATORY GUIDE 1.16 FOR DRESDEN NUCLEAR POWER STATION cot 440NWEALTH EDISON COMPANY FOR OCTOBER 1997

-UNIT DOCKET LICENSE 1 050-010 DPR-2 2 050-237 DPR-19 3 050-249 DPR-25 w

1 Lt\8360\9301\HISC\97\97110101.GA.

., =..-

-. 1 TABLE OF CONTENTS OCTOBER 1997 NRC REPORT 1.0 Introduction 2.0 Summary of Operating Experience

-2.1 Unit 2_ Monthly _ Operating Experience Summary.

2.2 Unit 3 Monthly Operating Experience Summary.

-3.0 Operating Dr.ta Statistics 3 .1 - Operating Data Report - Dresden Unit 2 3.2 Operating Data Report - Dresden Unit 3 3.3 Unit 2 Shutdowns 3.4 Unit'3 Shutdowns 4.0 Unique Reporting Requirements 4.1 Main Steam Relief and/or Safety Valve Operations -

Unit 2 and Unit 3

's 2

Li\8360\8301\M!$C\97\97110701.GA'

_ _ _ _ - - - - - - _ - _ - k

1.0 Introduction Dresden Nuclear Power Station is a three reactor generating facility owned and operated by the Comed Company of Chicago, Illinois. Dresden Station is located at the confluence of the Kankakee and Des Plaines Rivers, in Grundy County, near Morris, Illinois.

Dresden Unit 1 is a General Electric Boiling Water Reactor with a design net electrical output rating of 200 megawatts electrical (MWe). The unit is being decommissioned with all nuclear fuel removed from the reactor vessel. Therefore, no 'Init 1 operating data is provided in this report.

Dresden Units 2 and 3 are General Electric Boiling Water Recctors, each licensed at 2527 megawatts thermal. The gross outputs of Units 2 and 3 are 832 and 834 megawatts electrical, respectively, with design net electrical output ratings of 794 MWe each. The commercial service date for Unit 2 is 11 August 1970, and 30 October 1971 for Unit 3.

Waste hea", is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois River for blowdown.

The Architect-Engineer for Dresden Units 2 and 3 was Sargent and Lundy of Chicago, Illinois.

, This report for OCTOBER 1997, was compilo' by Gary A.

Abrell of Dresden Regulatory Assurance S,. f, telephone number (bl5) 942-2920, extension 3749.

3 Li\8 HO\8301\ Misc \97\97110701,GA

2.0

SUMMARY

OF OPEPATING EXPERIENCE FOR OCTOBER 1997 2.1 UNIT 2 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 2 operated near full power for the period except for short periods for maintenance and surveillance testing.

L 4

Li\B360\8301\ MISC \97\97110701.GA

2.0 sul+4ARY OF OPERATING EXPERIENCE FOR OCTOBER 1997 2.2 UNIT 3 MONTHLY OPERATING EXPERIENCE

SUMMARY

Unit 3 operated near full power for the period except for short periods for maintenance and surveillance testing.

1 5

Lt\8360\0301\ MISC \97\91110701.GA

3.0 OPERATING DATA STATISTICS 3.1 OPERATING DATA REPORT - DRESDEN UNIT TWO ,

DOCKET No. 050-237 DATE FOVEMBER 4, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 OPERATING STATUS

1. REPORTING PERIOD: OCTOBER 1997
2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe NET) : 772 DESIGN ELECTRICAL RATING (MWe Net): 794
3. POWER LEVEL TO WHICH RESTRICTED (MWe Net): No restrictions
4. REASONS FOR RESTRICTIONS (IF ANY) : See Section 2.1. c,f this report.

REPORTING PERIOD DATA PARAMETER iTHIS MONTHlYEAR To DATEi CtlMULATIVE 5 HOURE IN PERIOD 745 7,296 238,632

, 6 TIM REACTOR CRITICAL 745 6,461 173,623 7 142 REACTOR RESERVE SHU1T>OWN (Hours) 0 0 0 8 TIM GENERATOR OH-LINE (Hours) 745 6,372 165,387 9 TIM GENERATOR RESERVE SHUTPOWN (Hours) 0 0 1 10 THE7DtAL ENERGY CENERATED (MafHt Gross) 1,DB,068 14,955,50' 346,659,45 11 583,212 4,820,134 110,718.07C sucTU.{nL ENEmaY aswkmATED (MMBHe Gross) 12 E12CTRICAL ENERGY GENERATED (MWEHe Net) $$7,577 4,606,873 10 4, '1 J B , 602 13 REACTOR SERVICE FACTOR (t) 100.04 88.6% 72.8%

14 REACTOR AVAILABILITY FACTOR (t) 1003% 88.64 72.8%

, 15 GENERATOR SERVICE FACTOR tt) 100.0% 87.3% 69.3%

16 GENERATOR AVAILABLILITY FACTOR (t) 100.01 87.3% 69.3%

-17 CAPACITY FACTOR (Using MCD Net) (4) 96.9% 81.8% 56.8%

18 CAPACITY FACTOR (Using DER Net) (t) 94.3% 19.5% $5.3%

19 IW. I.D OUTAGE FACTOR (t) 0% 12.7% 12.8%

6 Li\B360\8301\ Misc \91\t1110101.GA

+

., . .1 3.0 OPERATING DATA STATISTICS 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE-DOCKET No. 050-249 DATE NOVEMBER 4, 1997 COMPLETED BY G. A. ABRELL TELEPHONE (815) _ 942-2920-OPERATING STATUS

1. REPORTING PERIOD: OCTOBER 1997

'2.- CURRENTLY AUTHORIZED POWER LEVEL (MWth) : 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net): 773-DESIGN ELECTRICAL RATING (MWe Net) : 794

3. POWLR LEVEL TO WHICH RESTRICTED: No restriction
4. REASONS FOR RESTRICTIONS - (IF ANY) : See-Section 2.2 of this report.

REPORTING PERIOD DAT1 PARAMETER THIS MOh7tl YEAR TO DATE CUMULATIVE 5 WoURS IN PERIOD 745 7,296 227,952 6 tim REACTOR CRITICAL '45 4697 160,$54 7 Ti m Reactor RESERVE suUTooWN (uours) 0.o e 0 6 Ti m osmRATOR oN-LINE (nours) 745 4 Stu 153,064 9 Ti m osm RATOR RESERVE SHUTDOWN (Hours) 0.0 0 0 10 TutmeAL tmRGY ot:aAATED 04WHt Gross) 1,786,639 9,741,322 319,953,199 11 SIACTRICAL EMBAST GBERATED DefBAe err.,ss) - $7 9,286 3,152,743 102,42$,804 12 ELECTRICAL ENERGY OtNERATED (MWEHe Net)- SS6,327 3,003,270 97,085.771 13 REACTOR Stavict FACTon (t) 100.0s 64.46 10.4%

14 R*.N: TOR AVAII ABILITY TACTOR (t) 100.0% 64.4% 70.4%

7 7.mRATOR SERVICE FACTOR (t) 100.04 62.2% 67.1%

16 atmRAfoR AVA11ABL14.1TY FACTOR (4) 100.Ot 62.24 67.It 17 CAPACITY FACTOR (Using MCD Net) (t) 96.74 53.3% 53.25 18 CAPACITY FACTOR (using DER Net) (t) 94.0% 51.es 53.5%

19 roRCED ouTAot FACTOR (t) O.O e' 14.39 1. . _4__t 7

. L t \8 360\8 301 \ MISC \t1\t1110101. GA I

3.3 UNIT 2 SHUTDOWNS REPORT MONTH OF OCTOBER 1997 NO DATE TYPE DURATION REASON METHOD CORRECTIVE (1) (HOURS)* (2) OF ACTIONS /

SHUTTING COMMENTS DOWN REACTOR (3)

Mk Year-to-date forced outage hourc = 925 Cumulative forced outage hours = 24,331 TABLE KEY:

(1) (3)

F: Forced Method:

S: Scheduled 1. Manual "

2. Manual Scram (2) 3. Automatic Scram Reason: 4. Other (Explain)

A Equipment Failure (Explain) 5. Load Reduction B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training &

Licensing Exam F -

Ad.tinistrative G Operational Error H Other (Explain) 8 Lt\8360\S301\M!sc\r7\97110701.GA

. . - . . . . . . ~ . . . . . . _ - . - . . . . .. . . . . . . . - . - . - . . . -- . - . . . ,

,, .e * =

3 .' 4 :_ UNIT 3 SHUTDONHS.

' REPORT MONTH OCTOBER 1997-NO DAtt TTec(1) . DURATION PIAAON{h METHOD OF CCMICT!VE (HOUPJ)* $hyTT!NG ACTICHS/ --

IXMd CottENTS PMsp (3)

Year-to-date' forced outage hours = 760 *

. Cumulative forced outage hours -- 25,836 *

  • Adjusted October 1997 to agree with official company Production-Data Bank hours year-to-date.

' TABLE KEY: .:

(1) (3)

F: Forced Method:

S: Scheduled 1. Manual

2. Manual Scram 1 (2)- 3. Automatic Scram Reason: 4. Other (Explain)

A Equipment Failure 5. Load Reduction (Explain)

-B Maintenance or Test ~

C Refueling D Regulatory Restriction

-E Operator Training &

~ Licensing Exam l F -Administrative

'G Operational Error H- .Other. -(Explain) 9

.. Lt\8360\9301\ MISC \97\91110701,GA .

8 g i _g S 4

' 4,,0' UNIQUE REPORTING REQUIREMENTS-4.1 MAIN' STEAM' RELIEF AND/OR SAFETY VALVE OPERATIONS - - UNIT 2 AND UNIT 3 None C

Lt\8360\8301\ Misc \91\91110101,GA

. .