Monthly Operating Repts for Jan 1990 for South Texas Project Electric Generating Station Units 1 & 2.W/900214 Ltr
ML20011E981
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/31/1990
From: Kent A, Mcburnett M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-3374, NUDOCS 9002230287
Download: ML20011E981 (14)


Text

. _

.t-.

The Light .

Houston Lighting ae Power _._ -_. P.O. Box . - 1700 llouston Texas 77001 (713) 228 9211

- _ _ - - - - ~ ~ ~ ~

February 14, 1990 ST HL-AE 3374 File No.: G02 10CFR50.71 U..S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50 498 6 50 499 Monthly Operatinc Reports for Januarvi 1990 Pursuant to,10CFR50.71(a): and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January,- 1990.

If you should have any questions on this matter, please contact Mr. C. A. Ayala at (512).972-8628  ;

Manager Support Licensing MAM/BEM/n1 f

Attachments: 1) STPEGS Unit 1 Monthly Operating Report - January, 1990

2) STPEGS Unit 2 Monthly Operating Report - January, 1990

&RO2230287-900131 ll/

R ADOCK 05o0049g PDC j/

A1/023.NL5 A Subsidiary of liouston Industries incorporated .

ST HL AE 3374 Houston Lighting & Power Company File No.:002 South Texas Project Electric Generating Station Page 2 cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 61867 Houston, TX 77208 George Dick, Project Manager

.U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway J. I. Tapia Atlanta, CA 30339 3064 Senior Resident Inspector c/o U. S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C. Texas Department of Health 1615 L Street, N.W. 1100 West 49th Street Washington, DC 20036 Austin, TX 78704 D. E. Ward /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 J. C. Lanier Director of Generation City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 12/15/89 L4/NRC/

m-

/ 'L .. '

ATTACHMENT 1 ST-HL-AE-33 W PAGE _1 0F_ b SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -

UNIT 1 MONTHLY OPERATING REPORT JANUARY 1990 HOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Reviewed y: . bG9o General Supervisor Date-R wed By: N 2!8 O Pl[gfggineeringManager 'D4(te Approved By: ki a13\90 Plant Manager Ilats P

m

  • p., .

A ;D ATTACHMENT.1 'i

" ST PAGEHLg AE-337f 0F k

!^ --

-Monthly Summary

-STPECS Unit 1. began the reporting period at.100% reactor power. A Notification of Unusual Event (NOUE) was declared at 1710 on 1/3/90 when a Feedwater Isolation Valve (WIV) failed to operate. as- required _during-

surveillance testing. The generator was taken off line at 2224 and reactor power
was reduced to 6%. The WIV was closed and the NOUE was exited at 2234. Repairs  !

-were made and testing was performed' satisfactorily. The unit was returned to

[

service on 1/7/90 at 0248 and restored to 1004-reactor power on 1/8/90 at 0405.

On 1/26/90 reactor power was reduced to approximately 904 to perform Nuclear

-Instrumentation Calibration and Turbine Control Valve Testing.- The unit was

  • returned to 1004 reactor power on 1/27/90.

F The report period was concluded with the unit at 100% reactor power.

r t

t i

'I

}h;

ATTACHMENT .1-ST HL AE-3YWOF _g --

PAGE_'3 u

OPERATING DATA REPORT DOCKET NO. 50 498 UNIT 1 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEPHON"2 512/972-7786 OPERATING STATUS

1. REPORTING PERIOD: 01/01-01/31 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTil0RIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): _1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 744.0 _ 744.0 8991.4
6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 'O
7. HOURS GENERATOR ON LINE.................. 667.6 667.6 8599.9
8. UNIT RESERVE SilVTDOWN HOURS.............. 0 0 0
9. CROSS THERMAL ENERGY GENERATED (MWt) . . . . 2526182 2526182 31204616
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)..,850290 850290 _10580880.
11. NET ELECTRICAL ENERGY GENERATED (MWH).... 810471 810471 9935140
12. REACTOR SERVICE FACTOR................... 100% 100% 71. M
13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . . . 100% 100% 71.41 14 UNIT SERVICE FACT 0R...................... 89.7% 09.7% 68.2%
15. UNIT AVAILABILITY FACTOR.,............... 89.7% 89.7% 68.2%
16. UNIT CAPACITY FACTOR (Using MDC)......... 87.1% 8M 63.0%
17. UNIT CAPACITY FACTOR (Using Design MWe).. 87.1% 87.1% 63.0%

18' UNIT FORCED OUTAGE RATE.............. ... 10.3% 10.3% 9.2%

19. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Scheduled 55 day refueling outage to begin April 7, 1990.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

F.

~

. ATTACHMENT 1 ST HL AE-337Y

'i" PAGE 4 0F L AVERAGE DAILY UNIT POWER LEVEL

).

DOCKET NO, 50 498 UNIT.1 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent __

TELEPHONE 512/972 7786 MONTil JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 1226 17 1244 2 1234 16 1252

'3 1039 19 1252 4 0 20 1253 5 ._

0 21 1257 6 0 22 , _ _ _

1255 7 573 -23 1255 8 -1228 24 1254 9 1239 25 1256 10 1239 26 1193 11 1244 27 1254 12 1234 28 1255 13 1242 29 1253 14 1E42 30 1242 15 1233 31 1239 16 1232 1

e aw

UNIT SHUTDOWNS AND POWER PEDUCTIONS DOCKET NO. 50-498 UNIT 1 '

DATE Feb. 6. 1990-COMPLETED BY A F. Kent.

TELEPHONE 512/072-7786 REPORT MONTH JANUARY l 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting- Event Code Code Prevent Recurrence Down Report # ,

Reactor 90-01 900103 F 76.4 A 1 1-90-001 SJ ISV The generator was taken off ling when a Feedwater Isolation Valve failed to operate as required during surveillance testing. Repairs were made and testing was performed satisfactorily. Refer to the LER for additional information.

l 2 3 4 5 SW O*

F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 m%*g 4

S: Scheduled A-Equipment Failure (Explain) 1-Manual g B-Haintenance or Test 2-Manual Scram ry, C-Refueling 3-Automatic Scram h$

D-Regulatory Restriction E-Operator Training & License Exam 4-Cont. of Existing Outage yg C

F-Administrative 5-Reduction  %

G-Operational Error (Explain) 9-Other H-Other (Explain)

...- ,: . ATTACHMENT.J i c- ST HL AE 337 F i f:

PAGE~L 0F la l

PQRVa and Safetv Walvan Summary 1 i

No PORV or Safety Valvss were challenged during this reporting period.

1

)

i i% l

% .j r- <

+L:

l I

q i

9 1

  1. f l

'l l' .l 4

t 1

.l t

f

i i

, t

' t:1 1

{

.{

  • t l 8 l.

l-  !

/ i l- ,

l i

e a e

- c 4 ,  ;

~

,- ATTACHMENTQ ST HL AE 337V PAGE l 0F b i

P t

i s

SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 ,

MONTHLY OPERATING REPORT ,

JANUARY 1990 HOUSTON LIGHTING AND POWER CO,  ;

NRC DOCKET No. 50 499  ;

LICENSE NO. NPF 80  :

-1 i

Reviewed By  :-G-90 Gener Su ervisor Date Re ed By: '.' 28N P g 5ngineering Manager Da'te Approved By: k 1- S 90 Plant Manager D Dat'e ,

l l

l

4,.

-. . c _. -

ATTACHMENTA ST HL AE 3374 i PAGE 3 0F lo r

~

Monthly summarv  !

i STPECS Unit 2 began the reporting period shutdown to complete repairs j on Diesel Generator #22.  ;

On 1/17/90 at 2206 the unit was placed in service for normal operation i then taken off line at 2316 when water was discovered in the exciter housing. i The temperature control valve had failed open creating large amounts of (

condensation in the housing, i The unit was returned to service at 0522 on 1/18/90 and concluded the report .

period at 1004 reactor power. l l

t i

c i

r I

f -

i l

-i k

r i

^

, ATTACHMENT .3 ST HL AE-33W PAGE 21 0F _4 OPERATIN3 DATA REPORT DOCRET NO. 50 499 6

UNIT 2 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEP110NE 512/972 7786 OPERATING STATUS I 1. REPORTING PERIOD: 01/01 01/31 CROSS HOURS IN REPORTING PERIOD: 744 o!

! 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 ,

MAX. DEPEND. CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6

. 3. POWER LEVEL TO WilICil RESTRICTED (IF ANY)(MWe Net)
None '

[ 4. REASONS FOR RESTRICTION (IF ANY): N/A TilIS MONTl! YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 401.4 401.4 3378.3
6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 t
7. Il0URS GENERATOR ON LINE.................. 331.8 331.8 3178.5
8. UNIT RESERVE SilVTDOWN HOURS.............. 0 0 0 4 GROSS THERMAL ENERGY CENERATED (MWt) . . . .1191912 1191912 10714288 -
10. CROSS ELECTRICAL ENERGY GENERATED (MWil). . 398020 398020 3611050
11. NET ELECTRICAL ENERGY GENERATED (MWil) . . . . 367437 367437 3388611
12. REACTOR SERVICE FACTOR................... 53.9% 53.9% 62.0%
13. REACTOR AVAILABILITY FACTOR.............. 53.9% 53.9% 62.0%
14. UNIT SERVICE FACT 0R...................... 44 11 44.6% $8.34
15. UNIT AVAILABILITY FACTOR. . . . . . . . . . . . . . . . . 44.6% 44.6% 58.3% .
16. UNIT CAPACITY PACTOR (Using MDC)......... 39.5% 39.5% 49.7%
17. UNIT CAPACITY FACTOR (Using Design MWe).. 39.5% 3 9 . 5 %_ 49.7%
18. UNIT FORCED OUTAGE RATE................., 55.4% ,

55.4% 26.8%

19 . - SilUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil): .

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

p,;

e ATTACHMENT 2 i ST HL-AE337Y t

PAGE 4 0F 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 499 UNIT 2 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 I

f MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 _

17 0 2 0 18 137 3 0 19 765 4 0 20 1183 5 0 21 1243 6 0 22 1244 7 0 23 1244 8 0 24 1240 9 0 25 1245 10 0 26 1250 11 0 27 1250 12 0 28 1250

.13 0 29 -1248 14 0 30 1249 15 0 31 1250 16 0 l

f

.m UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-499

~

UNIT 2 DATE Feb. 6. 1900 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 REPORT MONTH JANUARY No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report # ,

Reactor -

89-12 891218 F 406.1 A 4 N/A EK DG Forced outage to repair Diesel Generator

  1. 22 that was damaged during its 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load run test.

90-01 900117 F 6.1 H 1 N/A TB TGV Turbine was manually tripped when water was discovered in the exciter. The apparent cause of ' the water in the exciter was the temperature control valve failing open creating large amounts of conden-sation. Plant procedures are being evaluated for revision to ensure the temperature control valve is isolated within one hour of any plant trip. The-valve will remain isolated until the turbine reaches 1800 RPM and the exciter temperature reaches the point of requiring cooling.

r-5 1

F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 $

S: Scheduled A-Equipment Failure (Explain) 1-Manual g B-Maintenance or Test 2-Manual Scram i a

rn C-Refueling 3-Automatic Scram i. U%

D-Regulatory Restriction E-Operator Training & License Exam 4-Cont. of Existing Outage

'O h F-Administrative 5-Reduction e G-Operational Error (Explain) 9-Other H-Other (Explain) j

x . .. . ,

.;; N ATTACHMENT 2 2+q'.i-; - c. - '

ST HL-AE-3'5W

-PAGE L OF G.

PQRVs and Safety Valvan Summarv

.v s- ,,

No'PORV's or Safety Valves weTe challenged during this reporting period.