Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
. _
.t-.
The Light .
Houston Lighting ae Power _._ -_. P.O. Box . - 1700 llouston Texas 77001 (713) 228 9211
- _ _ - - - - ~ ~ ~ ~
February 14, 1990 ST HL-AE 3374 File No.: G02 10CFR50.71 U..S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50 498 6 50 499 Monthly Operatinc Reports for Januarvi 1990 Pursuant to,10CFR50.71(a): and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January,- 1990.
If you should have any questions on this matter, please contact Mr. C. A. Ayala at (512).972-8628 ;
Manager Support Licensing MAM/BEM/n1 f
Attachments: 1) STPEGS Unit 1 Monthly Operating Report - January, 1990
- 2) STPEGS Unit 2 Monthly Operating Report - January, 1990
&RO2230287-900131 ll/
R ADOCK 05o0049g PDC j/
A1/023.NL5 A Subsidiary of liouston Industries incorporated .
ST HL AE 3374 Houston Lighting & Power Company File No.:002 South Texas Project Electric Generating Station Page 2 cc:
Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 61867 Houston, TX 77208 George Dick, Project Manager
.U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway J. I. Tapia Atlanta, CA 30339 3064 Senior Resident Inspector c/o U. S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C. Texas Department of Health 1615 L Street, N.W. 1100 West 49th Street Washington, DC 20036 Austin, TX 78704 D. E. Ward /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 J. C. Lanier Director of Generation City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 12/15/89 L4/NRC/
m-
/ 'L .. '
ATTACHMENT 1 ST-HL-AE-33 W PAGE _1 0F_ b SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -
UNIT 1 MONTHLY OPERATING REPORT JANUARY 1990 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Reviewed y: . bG9o General Supervisor Date-R wed By: N 2!8 O Pl[gfggineeringManager 'D4(te Approved By: ki a13\90 Plant Manager Ilats P
m
A ;D ATTACHMENT.1 'i
" ST PAGEHLg AE-337f 0F k
!^ --
-Monthly Summary
-STPECS Unit 1. began the reporting period at.100% reactor power. A Notification of Unusual Event (NOUE) was declared at 1710 on 1/3/90 when a Feedwater Isolation Valve (WIV) failed to operate. as- required _during-
- surveillance testing. The generator was taken off line at 2224 and reactor power
- was reduced to 6%. The WIV was closed and the NOUE was exited at 2234. Repairs !
-were made and testing was performed' satisfactorily. The unit was returned to
[
service on 1/7/90 at 0248 and restored to 1004-reactor power on 1/8/90 at 0405.
On 1/26/90 reactor power was reduced to approximately 904 to perform Nuclear
-Instrumentation Calibration and Turbine Control Valve Testing.- The unit was
- returned to 1004 reactor power on 1/27/90.
F The report period was concluded with the unit at 100% reactor power.
r t
t i
'I
}h;
ATTACHMENT .1-ST HL AE-3YWOF _g --
PAGE_'3 u
OPERATING DATA REPORT DOCKET NO. 50 498 UNIT 1 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEPHON"2 512/972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 01/01-01/31 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTil0RIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): _1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 744.0 _ 744.0 8991.4
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 'O
- 7. HOURS GENERATOR ON LINE.................. 667.6 667.6 8599.9
- 8. UNIT RESERVE SilVTDOWN HOURS.............. 0 0 0
- 9. CROSS THERMAL ENERGY GENERATED (MWt) . . . . 2526182 2526182 31204616
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)..,850290 850290 _10580880.
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 810471 810471 9935140
- 12. REACTOR SERVICE FACTOR................... 100% 100% 71. M
- 13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . . . 100% 100% 71.41 14 UNIT SERVICE FACT 0R...................... 89.7% 09.7% 68.2%
- 15. UNIT AVAILABILITY FACTOR.,............... 89.7% 89.7% 68.2%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 87.1% 8M 63.0%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 87.1% 87.1% 63.0%
18' UNIT FORCED OUTAGE RATE.............. ... 10.3% 10.3% 9.2%
- 19. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 55 day refueling outage to begin April 7, 1990.
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
F.
~
. ATTACHMENT 1 ST HL AE-337Y
'i" PAGE 4 0F L AVERAGE DAILY UNIT POWER LEVEL
).
DOCKET NO, 50 498 UNIT.1 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent __
TELEPHONE 512/972 7786 MONTil JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 1226 17 1244 2 1234 16 1252
'3 1039 19 1252 4 0 20 1253 5 ._
0 21 1257 6 0 22 , _ _ _
1255 7 573 -23 1255 8 -1228 24 1254 9 1239 25 1256 10 1239 26 1193 11 1244 27 1254 12 1234 28 1255 13 1242 29 1253 14 1E42 30 1242 15 1233 31 1239 16 1232 1
e aw
UNIT SHUTDOWNS AND POWER PEDUCTIONS DOCKET NO. 50-498 UNIT 1 '
DATE Feb. 6. 1990-COMPLETED BY A F. Kent.
TELEPHONE 512/072-7786 REPORT MONTH JANUARY l 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting- Event Code Code Prevent Recurrence Down Report # ,
Reactor 90-01 900103 F 76.4 A 1 1-90-001 SJ ISV The generator was taken off ling when a Feedwater Isolation Valve failed to operate as required during surveillance testing. Repairs were made and testing was performed satisfactorily. Refer to the LER for additional information.
l 2 3 4 5 SW O*
F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 m%*g 4
S: Scheduled A-Equipment Failure (Explain) 1-Manual g B-Haintenance or Test 2-Manual Scram ry, C-Refueling 3-Automatic Scram h$
D-Regulatory Restriction E-Operator Training & License Exam 4-Cont. of Existing Outage yg C
F-Administrative 5-Reduction %
G-Operational Error (Explain) 9-Other H-Other (Explain)
...- ,: . ATTACHMENT.J i c- ST HL AE 337 F i f:
PAGE~L 0F la l
PQRVa and Safetv Walvan Summary 1 i
No PORV or Safety Valvss were challenged during this reporting period.
1
)
i i% l
% .j r- <
+L:
l I
q i
9 1
- f l
'l l' .l 4
t 1
.l t
f
- i i
, t
' t:1 1
{
.{
l- !
/ i l- ,
l i
e a e
- c 4 , ;
~
,- ATTACHMENTQ ST HL AE 337V PAGE l 0F b i
P t
i s
SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 2 ,
MONTHLY OPERATING REPORT ,
JANUARY 1990 HOUSTON LIGHTING AND POWER CO, ;
NRC DOCKET No. 50 499 ;
LICENSE NO. NPF 80 :
-1 i
Reviewed By :-G-90 Gener Su ervisor Date Re ed By: '.' 28N P g 5ngineering Manager Da'te Approved By: k 1- S 90 Plant Manager D Dat'e ,
l l
l
4,.
- -. . c _. -
ATTACHMENTA ST HL AE 3374 i PAGE 3 0F lo r
~
Monthly summarv !
i STPECS Unit 2 began the reporting period shutdown to complete repairs j on Diesel Generator #22. ;
On 1/17/90 at 2206 the unit was placed in service for normal operation i then taken off line at 2316 when water was discovered in the exciter housing. i The temperature control valve had failed open creating large amounts of (
condensation in the housing, i The unit was returned to service at 0522 on 1/18/90 and concluded the report .
period at 1004 reactor power. l l
t i
c i
r I
f -
i l
-i k
r i
^
, ATTACHMENT .3 ST HL AE-33W PAGE 21 0F _4 OPERATIN3 DATA REPORT DOCRET NO. 50 499 6
UNIT 2 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEP110NE 512/972 7786 OPERATING STATUS I 1. REPORTING PERIOD: 01/01 01/31 CROSS HOURS IN REPORTING PERIOD: 744 o!
! 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 ,
MAX. DEPEND. CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6
- . 3. POWER LEVEL TO WilICil RESTRICTED (IF ANY)(MWe Net)
- None '
[ 4. REASONS FOR RESTRICTION (IF ANY): N/A TilIS MONTl! YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 401.4 401.4 3378.3
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 t
- 7. Il0URS GENERATOR ON LINE.................. 331.8 331.8 3178.5
- 8. UNIT RESERVE SilVTDOWN HOURS.............. 0 0 0 4 GROSS THERMAL ENERGY CENERATED (MWt) . . . .1191912 1191912 10714288 -
- 10. CROSS ELECTRICAL ENERGY GENERATED (MWil). . 398020 398020 3611050
- 11. NET ELECTRICAL ENERGY GENERATED (MWil) . . . . 367437 367437 3388611
- 12. REACTOR SERVICE FACTOR................... 53.9% 53.9% 62.0%
- 13. REACTOR AVAILABILITY FACTOR.............. 53.9% 53.9% 62.0%
- 14. UNIT SERVICE FACT 0R...................... 44 11 44.6% $8.34
- 15. UNIT AVAILABILITY FACTOR. . . . . . . . . . . . . . . . . 44.6% 44.6% 58.3% .
- 16. UNIT CAPACITY PACTOR (Using MDC)......... 39.5% 39.5% 49.7%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 39.5% 3 9 . 5 %_ 49.7%
- 18. UNIT FORCED OUTAGE RATE................., 55.4% ,
55.4% 26.8%
19 . - SilUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil): .
None
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
p,;
e ATTACHMENT 2 i ST HL-AE337Y t
PAGE 4 0F 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 499 UNIT 2 DATE Feb. 5. 1990 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 I
f MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 _
17 0 2 0 18 137 3 0 19 765 4 0 20 1183 5 0 21 1243 6 0 22 1244 7 0 23 1244 8 0 24 1240 9 0 25 1245 10 0 26 1250 11 0 27 1250 12 0 28 1250
.13 0 29 -1248 14 0 30 1249 15 0 31 1250 16 0 l
f
.m UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCKET NO. 50-499
~
UNIT 2 DATE Feb. 6. 1900 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 REPORT MONTH JANUARY No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report # ,
Reactor -
89-12 891218 F 406.1 A 4 N/A EK DG Forced outage to repair Diesel Generator
- 22 that was damaged during its 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> load run test.
90-01 900117 F 6.1 H 1 N/A TB TGV Turbine was manually tripped when water was discovered in the exciter. The apparent cause of ' the water in the exciter was the temperature control valve failing open creating large amounts of conden-sation. Plant procedures are being evaluated for revision to ensure the temperature control valve is isolated within one hour of any plant trip. The-valve will remain isolated until the turbine reaches 1800 RPM and the exciter temperature reaches the point of requiring cooling.
r-5 1
F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 $
S: Scheduled A-Equipment Failure (Explain) 1-Manual g B-Maintenance or Test 2-Manual Scram i a
rn C-Refueling 3-Automatic Scram i. U%
D-Regulatory Restriction E-Operator Training & License Exam 4-Cont. of Existing Outage
'O h F-Administrative 5-Reduction e G-Operational Error (Explain) 9-Other H-Other (Explain) j
x . .. . ,
.;; N ATTACHMENT 2 2+q'.i-; - c. - '
ST HL-AE-3'5W
-PAGE L OF G.
PQRVs and Safety Valvan Summarv
.v s- ,,
No'PORV's or Safety Valves weTe challenged during this reporting period.
6 _