Monthly Operating Rept for Jan 1990 for Perry Nuclear Power Plant,Unit 1.W/900215 Ltr
ML20011E979
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/31/1990
From: Hegrat H, Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1136, NUDOCS 9002230279
Download: ML20011E979 (6)


Text

b.

c,1 a THE CLEVELAND' ELECTRIC ILLUMINATING COMPANY P.O. BOX 97 E PERRY, OHIO 44001 5 TELEPHONE (216) 26 43737 E ADDRESS 10 CENTER ROAD FROM CLEVELAND: 479 1200 5 TELEX: 241500 ANSWERBACK: CEIPRYO Al Kaplan . '

Serving The Best Location in the Nation '

PERRY NUCLEAR POWER PLANT j" VCt WEFOLNY NUCtEAR GAOLp

, February 15, 1990 PY-CEI/NRR-1136 L t

U.S. Nuclear Regulatory Commission

!- Document Control Desk Washington, D.C. 20555 4 Perry Nuclear Power Plant  !

Docket No. 50-440 Monthly Operating Report

Dear Sir:

Attached is the January 1990 Monthly Operating Report for Perry Unit 1. This report is submitted in accordance with Technical Specification 6.9.1.8.

If there are any questions, please feel free to call. ,

Very truly yours,  !

(.

t TNitp Al a an Vice President

, Nuclear Croup

' AKi nj e 3 ' Attachment

!i. ces: T. Colburn m USNRC Senior Residetat Inapector - Perry USNRC, Regior.III

-9 ' Director, Office of Reanecce Management II 9002230279 900s31 PDR ADOCK 05000440 '

R PDC ,

.. i j

l i

i i

CLEVELAND ELECTRIC ILLUNINATING COMPANY PERRY NUCLEAR POWER PLANT January 1, 1990 - January 31, 1990 .

NONTHLY OPERATING REPORT TO NRC l

DOCKET NUMBER : 50-440 LICENSE NUMBER: NPF-58 e

t 1

l l

l

p. -

l'  :;-,y 4 i

i .*

t ..

, Table of Contents t

Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . 1 Operating Data Report ....... ...... ....... ... . 2 Unit Shutdowns and Power Reductions . . . ... . .... .. ... . 3 1

l t

r 1

{

El f.

Average Daily Unit Power Level DOCKET No. 50-440

' UNIT Perry-1 DATE 02/15/90 Contact H.L. Hegrat 6 Telephone (216)259-3737 MONTH January 1990 DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POWER LEVEL

! (MVe-Net) (MVe-Net)

, 1 1197 17 0

!' 2 1198 18 324 3 1191 19 1127 4 1188 20 1193 5 1198 21 1180 ,

6 1198 22 1195 7 548 23 1197 8 ~~

0 24 1196 9 0 25 1196 10 0 26 1200 11 0 27 1196 i

12 0 28 1193 13 0 29 1196 14 0 30 1196 '

15 0 31 1196 16 0 s 9

t 1

I Operating Data Report UNIT: PERRY-1 DATE: 02/15/90 OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: January 1990
3. Utility contact: H.L. Hegrat (216) 259-3737 '
4. Licensed Thermal Power (MVt): 3579
5. Nameplate Rating (Cross MVe): 1250
6. Design Electrical Rating (Net MVe): 1191
7. Maximum Dependable Capacity (Gross MVe): 1200
8. Maximum Dependable Capacity (Net MVe): 1141
9. If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:

N/A

10. Power Level To Vhich Restricted, If Any (Net MVe): 100%
11. Reasons for Restrictions, If Any: Technical Specification Limit This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 744 744 19,332
13. Hours Reactor Vas Critical 536.2 536.2 13,283.7
14. Reactor Reserve Shutdown Hours 0 0 0
15. Hours Generator'On-Line 492.8 492.8 12,711.3
16. Unit Reserve Shutdown Hours 0 0 0
17. Gross Thermal Energy (MVH) 1,700,029 1,700,029 42,824,357
18. Gross Electrical Energy (MVH) 590,821 590,821 14,731,278
19. Net Electrical Fnergy (MVH) 560,226 560,226 13,946,319
20. Unit Service Factor 66.2% 66.2% 65.8%
21. Unit Availability Factor 66.2% 66.2% 65.8%
22. Unit Capacity Factor (Using MDC Net) 66.0% 66.0% 63.2%
23. Unit Capacity Factor (Using DER Net) 63.2% 63.2% 60.6%
24. Unit Forced Outage Rate 12.7% 12.7% 10.9%
25. Forced Outage Hours 72 _

72 1,558.9

26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

None

27. If Shut Down at end of Report Period, Estimated Date of Startup:

N/A NJC/ FORM /2255 l

l i

4

.. i INSIT SHUTDOINIS AND F0WER REDUCTIOlis BOCKET 100. 50-4t.0 UlfIT IIAME Petry-I REPORT MOIITN January 1990 DATE U2/15/90 CONTACT n_ f. u, o , e TELEPHONE (?!6) 779-1717 l

l 9.

i o a' o eeu a c n ,

  • q g

, ,c, o Licensee 5. *% Ca*** ' C******l'* '

No. Date g gg ; gy Event gg g Action to [

i

    • gg ; yjg Report # y gu Frevent Recurrence i O* * ** oo u .

90-01 01/07/90 F 72.0 G 3 90-001 N/A N/A Improper A.C. Bus transfer due to operator error results in a coriplete loss of feedwater and a scram on low reactor water level. Procedural changes and $

training were implemented to prevent recurrence.

1 i i 90-02 01/10/90 179.2

~

S B 4 N/A N/A N/A Maintenance and required technical specification  !

testing.

4 h  ;

StfMMARY : Perry-l began the month of January at full power and continued to operate at this level until the unit -

experienced an automatic scram on 01/07/90. The outage was extended to include scheduled maintenance and testing; the plant was synchronized to the grid on 01/I7/90.

  • l l

I F: Forced Reason: Method: Exhibit C - Instructions 4 S: Scheduled A-Equ'peent

Failure (Exp?ain) l-Manual for Freparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scree Event Report (LER) File (NUREG D-Regulatory Restriction 4- Con tinued 1022) -i E-Operator Training & 5,-Reduced Load 3

License Emmeinstion 9-Other Exhibit I-Same Source j F-Administrative +

j C-Operational Error (Emplain)

H-Other (Emplain)

)