ML19351C865

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Draft License Amendment Request (LAR)19-020, Cyber Security Plan (CSP) Changes.
ML19351C865
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/08/2020
From: Jennivine Rankin
NRC/NRR/VPOB
To: Victor Hall
Office of Nuclear Reactor Regulation
References
Download: ML19351C865 (8)


Text

January 8, 2020 MEMORANDUM TO: Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: Jennivine Rankin, Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON DECEMBER 12, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on December 12, 2019. The purpose of the meeting was to discuss draft License Amendment Request (LAR)19-020, Cyber Security Plan

[CSP] Changes.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML19294A066. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The publicly available cover letter for draft LAR-19-020 can be found at ADAMS Accession No. ML19345C955. Enclosure 3 documents the non-public discussion for draft LAR-19-020.

CONTACT: Jennivine Rankin, NRR/VPO (301) 415-1530

V. Hall Summary of Meeting:

Pre-submittal Meeting on LAR-19-020: Cyber Security Plan Changes Staff from the NRC continued discussion on draft amendment request (LAR-19-020) with SNC.

A previous meeting on draft LAR-19-020 was held on December 5, 2019 (meeting summary at ADAMS Accession No. ML19346E557). The LAR proposes changes to the Vogtle Electric Generating Plant (VEGP) Units 3 and 4 CSP to identify the VEGP Units 1 and 2 CSP for cyber security protection of digital assets in systems common to VEGP Units 1 through 4, to align language in the VEGP Units 3 and 4 CSP with the corresponding elements of the NRC-endorsed CSP template in Nuclear Energy Institute (NEI) 08-09, Revision 6 (including Addendum 1), and to enhance certain controls for the protection and safety monitoring system.

A portion of this meeting was closed to the public due to discussion of security-related information. During the closed portion, the NRC and SNC reviewed the changes made to the draft LAR as a result of the discussion on December 5, 2019. SNC indicated they intend on submitting the LAR by December 20, 2019.

At the conclusion of the open portion of the meeting, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Docket Nos.: 52-025 52-026

Enclosures:

1. Meeting Agenda
2. Meeting Attendance List
3. LAR-19-020 Closed Meeting Summary (non-public) cc w/encls: See next page

ML19351C849 - Package *via e-mail NRC-001 OFFICE PM: VPO LA: VPO PM: VPO BC: VPO NAME JRankin* (c) RButler* CSantos* VHall*

DATE 12/18/19 12/18/19 12/18/19 12/8/19 OFFICE PM: VPO NAME JRankin (s)*

DATE 12/8/19 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, December 12, 2019 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED. (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, December 12, 2019 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Jennivine Rankin Billy Gleaves NRR/VPO Cayetano Santos Victor Hall Mike Brown Jim Beardsley NSIR Kim Lawson-Jenkins Representing Industry Nick Kellenberger*

Kelli Roberts*

Brad Yeates*

Neil Haggerty* Southern Nuclear Operating Company Kara Stacy*

Nitin Patel*

Jerri Byers*

  • = participated via teleconference Enclosure 2

Vogtle Mailing List (Revised 11/12/2019) cc:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)

Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak)

Page 2 of 3

Vogtle Mailing List sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge)

X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)

X2hagge@southern.com (Neil Haggerty)

X2wwill@southernco.com (Daniel Williamson)

Page 3 of 3