Informs That Proposed Mods Re Maint of long-term Cooling After LOCA Delayed from 1981 to 1982 Refueling Outage.Delay Caused by Delayed NRC Approval of Design Proposals & Long Lead Times Required to Obtain New Equipment
ML19347F080
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/08/1981
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8105150224
Download: ML19347F080 (1)


Text

i Omaha Public Power District M~.

1623 MARNEY 8 OMANA. NEBRASKA 68102 e TELEPMCNE 536 4000 AREA CODE 402 May 8, 1981 Mr. Robert A. Clark, Chief U. S. Nuclear Regulatory Comission Office of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C. 20555

Reference:

Docket No. 50-285

Dear Mr. Clark:

The Commission's letter dated March 10, 1981, approved Omaha Public Power District's proposed modifications at the Fort Calhoun Station to resolve the concern of ability to maintain long term core cooling following a LOCA. As discussed on July 21, 1980, by a telephone conversation between Mr. Wagner of your staff and Mr. Hickle of the District, these modifications will be installed during the 1982 re-fueling outage. The modifications were originally planned for the 1981 refueling outage. However, this schedule was delayed for the following reasons:

(1) The District was awaiting Commission approval of our design proposals.

(2) long lead times are required to obtain new equipment.

(3) The modifications will require off-loading of the core to perform hydrostatic testing of the reactor coolant system and the core is scheduled for off-loading during the 1982 outage for inservice inspection.

Sincerely, 1, '[ 'l l v JL/, G l

W. C.l Jones Division Manager Production Operations WCJ/KJM/TLP:jmm

! cc: LeBoeuf, Lamb, Leiby & MacRae j

1333 New Hampshire Avenue, N.W.

Washington, D.C. 20036 0(

0 KO i 8105150 M t

P