Deficiency Rept Re Link Rod Assembly in Delaval Diesels. Dowel Counterbore of Link Rod Assembly May Be Too Shallow. Transamerica Delaval Described Insp Method Required.Onsite Diesels Will Be Placed on Hold Pending Insp
ML19345C489
Person / Time
Site: Hartsville, Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 11/26/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, NUDOCS 8012050369
Download: ML19345C489 (2)


Text

-

t .

/

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot l 400 Chestnut Street Tower II November 26, 1980 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Ccemission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS - REPORTABLE DEFICIENCY -

LINK ROD ASSEMBLY - DELAVAL DIESELS'(NCR DELAVAL NO. 1)

Initial notification of the subject deficiency was made to NRC-0IE, Region II, Inspector R. W. Wright on October 27, 1980. In compliance with paragraph 50.55(e) of 10 CFR Part 50, enclosed is the first interim report on the subject deficiency. We consider 10 CFR Part 21 applicable to this nonconformance. TVA anticipates transmitting the final report on or before March 2, 1981. If yo_u have any questions regarding this subject, please call Jim Domer at FTS 857-2014.

Very truly yours, TENNESSEE VALLEY AUTHORITY f.lf ll Y ff - --

L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555' Ol

.s

/

[

L s o 1 e o 50 3(e9 An Equat Cococtunitz Employer.

] .

l 1

g. <

p ENCLOSURE HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS LINK ROD ASSEMBLY - DELAVAL DIESELS NCR - DELAVAL NO. 1 -

10 CFR PART 50.55(e) FIRST INTERIM REPORT ,

Descriotion of Deficiency Transamerica Delaval (TDC) informed TVA of a potential problem in TDC-supplied diesel generators at the Bellefonte, Hartsville, and Phipps Bend Nuclear Plants. This was reported to NRC-0IE under 10 CFR Part ?1 by letter from D. H. Martini (TDC) to V. Stello of the NRC dated September 19, 1980. The problem is that the dowel counterbore of the link rod assembly may be too shallow. This condition, if it exists, could. result in the failure of that assembly and ultimately in the unavailability of the diesel generators.

Interim Proeress A total of 12 Transamerica Delaval diesels are designed for use at Hartsville and Phipps Bend (two TDC generators per unit). The eight Transamerica diesels for Hartsville are in onsite storage there.

One of the four diesels slated for Phipps Bend is onsite. The remaining three have yet to arrive.

Transameria Delaval has described the inspection method required to determine whether the dowel counterbore defect is present. Onsite diesels will be placed on hold and inspected for the subject defect.

TVA is still in the process of determining the status of inspection for this defect for the three diesel generators which have yet to be delivered to Phipps Bend. TVA will ta'<e steps to ensure that all 12 diesels have been or will be inspected for the presence of this defect before operation.

The final report on this nonconformance for Bellefonte Nuclear Plant was transmitted to you by my letter dated November 25, 1980.