ML19340B938

From kanterella
Jump to navigation Jump to search
Application for Amend to App a Tech Specs to Replace Fy Limits.Proposed Revisions to Tech Spec Encl
ML19340B938
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/03/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19340B939 List:
References
NUDOCS 8011120611
Download: ML19340B938 (2)


Text

_

m Alabama rower Company 600 N;rth 18th street Post Office Box 2641 Birmingham. Alabama 35291 Teleonone 205 250-1000 m

F. L. CLAYTON, JR.

senior Vice President Alabania Nwer the southem erectnc sys:em November 3,1980 Docket No. 50-364 a

n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission

~

Phillips Building, Room 116 U ;;,

7920 Norfolk Avenue 54 f'

~

Washington, D. C.

20555 d

fj ui

=

Attention: Mr. A. Schwencer Gentlemen:

JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 PROPOSED FXY TECHNICAL SPECIFICATION CHANGES As a result of meetings with the NRC Staff on August 21-28, 1980 regarding the Appendix "A" Technical Specifications, the Staff stated that Alabama Power Company should formally docket our requests regarding specification 4.2.2.2.e "Fxy Limits". A discussion of this request is provided below.

During the course of the technical specification discussions with the NRC in August, Alabama Power Company proposed to replace the Fxy limits as stated in the technical specifications with a reporting requirement since Fxy is a surveillance limit and not a safety limit.

Since Fxy limits typically vary from cycle to cycle, the proposed reporting requirements will result in savings to the utility and NRC in manpower and license amendment fee costs associated with proposing a technical specification change.

As a result of subsequent discussions with the NRC Staff, Westinghouse, and Southern Company Services, Alabama Power Company proposes the enclosed technical specification changes.

It is requested that the proposed changes be incorporated into the technical specifications that are to be issued with the full power operating license.

Should you have any questions, please advise.

Yours truly, A

\\

t f-f\\

F. L. Clayton, Jr.

't FLCjr./BDM:de 8033120 Ql cc: Distribution page 2

Director of Nuclear Reactor Regulation November 3, 1980 U. 3. Nuclear Regulatory Comission Page 2 cc: Mr. R. A. Thomas Mr. G. F. Trowbridge

. c. L. Kintner Mr. W. H. Bradford Mr. D. Vito