Similar Documents at Perry |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARPY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2329, Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2323, Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2313, Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2306, Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2282, Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2277, Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 1 ML20216J1401998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2258, Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 1 ML20198N9831997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Perry Nuclear Power Plant Unit 1,consisting of Revised Page 1 for Operating Data Rept & Page 2 for Unit Shutdowns & Power Reductions Chart PY-CEI-NRR-2243, Monthly Operating Rept for Nov 1997 for Perry Nuclear Power Plant,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2235, Monthly Operating Rept for Oct 1997 for Perry Nuclear Power Plant,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2225, Monthly Operating Rept for Sept 1997 for Perry Nuclear Power Plant,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2213, Monthly Operating Rept for Aug 1997 for Perry Nuclear Power Plant Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2199, Monthly Operating Rept for July 1997 for Pnpp1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Pnpp PY-CEI-NRR-2189, Monthly Operating Rept for June 1997 for Perry Nuclear Power Plant,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2172, Monthly Operating Rept for Apr 1997 for Perry Nuclear Power Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Perry Nuclear Power Station PY-CEI-NRR-2158, Monthly Operating Rept for March 1997 for Pnpp1997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Pnpp PY-CEI-NRR-2150, Monthly Operating Rept for Feb 1997 for Pnpp1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pnpp PY-CEI-NRR-2140, Monthly Operating Rept for Jan 1997 for Perry Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Perry Unit 1 PY-CEI-NRR-2131, Monthly Operating Rept for Dec 1996 for Perry Nuclear Power Plant,Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2121, Monthly Operating Rept for Nov 1996 for Perry Nuclear Power Plant,Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2116, Monthly Operating Rept for Oct 1996 for Perry Nuclear Power Plant Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2103, Monthly Operating Rept for Sept 1996 for Perry Nuclear Power Plant1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Perry Nuclear Power Plant PY-CEI-NRR-2094, Monthly Operating Rept for Aug 1996 for Perry Nuclear Power Plant Unit 11996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2085, Monthly Operating Rept for Jul 1996 for Perry Nuclear Power Plant Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2072, Monthly Operating Rept for June 1996 for Perry Nuclear Power Plant Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Perry Nuclear Power Plant Unit 1 ML20117M7831996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2051, Monthly Operating Rept for Apr 1996 for Perry Nuclear Power Plant Unit 11996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Perry Nuclear Power Plant Unit 1 ML20117M7841996-04-30030 April 1996 Revised Monthly Operating Rept for Apr 1996 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2042, Monthly Operating Rept for Mar 1996 for Pnpp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pnpp PY-CEI-NRR-2036, Monthly Operating Rept for Feb 1996 for Perry Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Perry Unit 1 PY-CEI-NRR-2023, Monthly Operating Rept for Jan 1996 for Pnpp Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pnpp Unit 1 PY-CEI-NRR-2014, Monthly Operating Rept for Dec 1995 for Perry Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Perry Nuclear Power Plant PY-CEI-NRR-2010, Monthly Operating Rept for Nov 1995 for Perry Nuclear Power Plant Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Perry Nuclear Power Plant Unit 1 PY-CEI-NRR-2001, Monthly Operating Rept for Oct 1995 for Perry NPP1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Perry NPP PY-CEI-NRR-1989, Monthly Operating Rept for Sept 1995 for Perry Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Perry Nuclear Power Plant PY-CEI-NRR-1983, Monthly Operating Rept for Aug 1995 for Perry Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Perry Nuclear Power Plant PY-CEI-NRR-1967, Monthly Operating Rept for June 1995 for Perry NPP1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Perry NPP PY-CEI-NRR-1964, Monthly Operating Rept for May 1995 for Perry Nuclear Power Plant Unit 11995-05-31031 May 1995 Monthly Operating Rept for May 1995 for Perry Nuclear Power Plant Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant1999-08-0909 August 1999 SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored1999-05-12012 May 1999 Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514 ML20206D7911999-04-23023 April 1999 Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20206D8461999-03-31031 March 1999 Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902271999-03-0303 March 1999 Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2329, Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With ML20153B8221998-09-16016 September 1998 Safety Evaluation Accepting Changes to USAR Section 13.4.3, 17.2.1.3.2.2,17.2.1.3.2.2.3 & App 1A PY-CEI-NRR-2323, Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2313, Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2306, Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 1 ML20249A1891998-06-11011 June 1998 SER on Moderate Energy Line Pipe Break Criteria for Perry Nuclear Power Plant,Unit 1 & Requests Addl Info to Demonstrate That Plant & FSAR in Compliance W/Staff Position & GDC as Discussed in SER ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted PY-CEI-NRR-2282, Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 1 ML20217D2051998-04-20020 April 1998 SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147 PY-CEI-NRR-2277, Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20216G3901998-03-11011 March 1998 SER on Proposed Merger Between Duquesne Light Co & Allegheny Power Sys,Inc ML20216J1401998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Perry Nuclear Power Plant,Unit 1 PY-CEI-NRR-2258, Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 1 1999-09-30
[Table view] |
Text
Q?s THE CLEVELAND ELECTRIC ILLUMINATING COMP.ANY P.O. DOX 97 5 PERRY. OH60 44001 e TELEPHONE (ris) M3787 5 ADDRES4tp CENTER MOAD ;
FROM CLEVELAND: 44 1Ps0 0 TELEX: 241140 i ANsWERBACE: CElPRYO Al Kaplan Serving The Best location in the Nation -
PEMRY NUCLEAR POWER PLANT vet mtso m November 15, 1989 ,
PY-CEI/NRR-1097 L U.S. Nuclear Regulatory Commission .
Document Control Desk i Washington, D.C. 20555 l t
Perry Nuclear Power Plant i Docket No. 50-440 _;
Monthly Operating Report P
Dear Sir ;
r Attached is the October 1989 Monthly Operating Report for Perry !
Unit 1. This report is submitted in accordance with Technical [
Specification 6.9.1.8. l If there are any questions, please feel free to call.
l Very truly yours, ,
Al Kaplan Vice President i Nuclear Group (
l AKinjc Attachment f cca T. Colburn ;
USNRC Senior Resident Inspector - Perry i USNRC, Region III Director, Office of Resource Management ,
8911200007 891031 N PDR ADOCK 03000440 1 R PDC I i
.e \'r .
i h
CLEVELAND ELECTRIC ILLUNINATING COMPANY PERRY NUCLEAR POWER PLANT OCTOBER 1, 1989 - OCTOBER 31, 1989 MONTHLY OPERATING REP 0nf TO NRC t ,
DOCKET NUMBER : 50-440 [
LICENSE NUMBER: NPP-58 i t
e
,I i
i !
i t
t i
5 t
t I
t
' ' P P** T,! '*
g#.. cr.F i w ,.V. s3 l M. .'
' 4 i' i< ?
- o", u U M i MMN""W '. : s s-
g@T@J N;pi y; y 3y ng:
r.m !Q. t.. p p#-
, 7 ,, a
< , 1 , ,x .
7' ' ,
., w , La. m ' ,- i .. . <
-s y. . ,~ m..y . . .#.
. ,. n z
>_ , m .
t, .
s
. tlpr .:,q
.w , e. s;o :,j o, e .
+
,,, ;t e-1..
t '
, e i
r i i
,t.
2u, i,'
y t;~; i's . c . i ,i
,. 1 ,
= ,. 4 , 4 s. a 41 f, ,6, x3
- e-
., q i ,,.s
,d .{ .:. + .I s
w:L, b > i '.y 6 a, ,
.c
,; r.
." [ s:n $
, 2.
', . . '- m >
y
., 3 e <
i s + a - >
, ' . ' . ' 7' ) ;4 re. -f 1 j, g< ;,:.Y rP.<.., 6-h 1l il 4
.t. 6I .' f *l'-
y@. , x . , . t, t ;. '
( ,
- 4 s.
- ;g t *a-
.;'lf d Q,, .
-) , _
7
." + ' e m
pj 9.o li
- m, v.
.--m q
t ,
- J
'I J.,
r
, . t 1. ,
L
.(' .q-'
l ,'i 1
3 2 s
, , ,, v. ,
- W * '
. Table:of Contents g,.,,, *,' :3, 7 ,
, . .3 a
. .e m,'m
!,> 6 i'
M t*
+
f r. . .
W. : ,
i ,
+ +
+
8 ,
1' I,', -
L
,, , , , , 1 5 , !' )\
i
.7 p. s
, ; L, s .a '
- i. . .
D'. ',- '. Avera. ge Daily Uni t ' Power' 14 vel ~ . . . . . . . . . .
. . . . . . . . .1. ? .11 1
i n ,.
- yx .
u ft 5..
Operating Data' Report .=. . . . .;.1.... . . .. .. . : . ...... .; 7.'. . . I2 J.y" ( .
5 * ,., ' . .. , ,
. 5,,", .
- Unit shutdowns"and Pover, Reductions . . .' .-
. '.<. .'.:. . .-. . .'.,.: 3 >
. 6. , j 1i :
- f. , ,' . U. y.
.e ;
4
,<. p 4.Y a e
4
,. , , 3 t .,
<u t
..,1 ,
ll. -
t ri s Q:.. Q. , .
t,. i .
A . 4 e
? P -' 3 ( ,
to
I
's a J
{ \ '
e p* ,
< e.
% , 'i } ' . '
.. - ( L , ,t I
I;
- c 4
(aA f-
, , . d.
w '
Ae i
- 8 3
e i
, q- -
2 , .,.y' p ,. {t, L.
f,e
, t b i 3 I y
U. #,,
!.1- .,.
1 t t, , y A,3n y. , . 4 s L.b. '-- ' .i
za h.'i
'. g
- , - m,
'b ',,s I r'
', k ' !, '
'&)-. / \
g.-
! ' r
-)) ^
v y.
,'is >
m Y
, . ' .d L.y -
61 , . : r J' '
N
, .. . p/ r {
...'y P' . .
, cj, ' '
i .,
(.;
l y, .: '
, ' I',;3 , .
's
.1 , i.
l Ya* 0 l n 't ,
Is-N.
t $
j g'i . . ,'[/ / .,4.a . 'g (. <
I. . 1,J s v ,
r s . ., 2
- , i ( ,..o,,-u wu m -. - - - .wm - w w w--e- %- =-*em se ve
- w - - - - - - - - - - - - -- - - - - - -
]$
3 ,.
l
- d > ,
Average Daily Unit Power Level DOCKET NO. 50-440 :
UNIT Perry-1 11/15/89 I"i DATE Contact C.A.Dunn '
r Telephone (216)259-373L l
' t i
MONTH October 1989- .
h DAY AVERAGE DAILY POVER LEVEL I DAY AVERAGE DAILY POWER LEVEL (NVe-Net) (MVe-Net) f F L
- . 1 1158 17 -
1179 ,
k 2 1168 18 1187 3 1185 19 1187 ,
c 4 1187 20 1191 1 i
.5 1184 21 1189 !
h: t 6 1178 22 1179 l
t- 7 1188 23 1183 f
8 1181 24 1176
['
l- 9 1193 25 1177 .;
10 1186 26 1178 ,
1177 11 1184 27 12 1177 28 742 j l 13 1180 29 699 .
1 30 1054 !
14 921 1181 l r 15 651 31 i
16 1052 ;
t I-1 i
l .- ,
I f
- h. ]
i i
k 1
!t l I ll p.
___J
' b i,, Opetating Data Report i
i UNIT: PERRY-1 DATE: 11/15/89 _
r OPERATING STATUS >
- 1. Docket: 50-440 l
- 2. Reporting Period October 1989 !
- 3. Utility
Contact:
'G.A. Dunn (216) 259-3737 t 4. Licensed Thermal Power (MVt): 3579
- 5. Nameplate Rating (Gross MVe): 1250
- 6. Design Electrical Rating (Net MVe): 1191
- 7. Maximum Dependable Capacity (Gross MWe): 1200 ,
L 8. Maximum Dependable Capacity (Net MVe): 1141
- 9. If changes occur in capacity ratings (Item Numbers 4 through 8) since ;
I last report, give reasons: ,
N/A .
- 10. Power Level To Vhich Restricted, If Any (Net MVe): 100% [
- 11. Reasons for Restrictions, If Any: Technical Specification Limit This Month Yr-to-Date Cumulative
- 12. Hours In Reporting Period 745 7,296 17,124 i
- 13. Hours Reactor Vas Critical 745 3,533 11,283.5
- 14. Reactor Reserve Shutdown Hours 0 0 0
- 15. Hours Generator On-Line 745 3,314.5 10,754.5
- 16. Unit Reserve Shutdovn Hours 0 0 0
- 17. Gross Thermal Energy (MVH) 2,529,389 11,060,888 35,939,343
- 18. Gross Electrical Energy (MVH) 873,314 3,812,879 12,327,413
- 19. Het Electrical Energy (MVH) 831,637 3,591,064 11,653,370 !
- 20. Unit Service Factor 100% 45.4 62.8
- 21. Unit Availability Factor ~
100% 45.4 62.8
- 22. Unit Capacity Factor (Using i MDC Net) 97.8 43.1 ___
59.6
- 23. Unit Capacity Factor (Using ,
DER Net) 93.7 41.3 57.1
- 24. Unit Forced Outate Rate 0 1.1 12.1
- 25. Forced Outage Hours 0 36.8 1,486.9 .
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
None
- 27. If Shut Down at end of Report Period, Estimated Date of Startup N/A e
5 l
l l
t l
- u - - - - - -
a _ _ _ - ._ ___
- - . 4 e.
IIIIIT SIIIITDOWNS AIID F0WER REDUCTIOlls DOCKET IIC. 50-440 UNIT IIAME Perry-I REFOltT lt00lTH October 1989 DATE II/15/89 CostTACT G.A. Dunn TELEr1800fE (216) 259-3737
'l o
S- 'E. * .E t. Lice. . . E. a. Cause & Corrective co. ca. g ;; - ,; ave.c : . g3 Actton to e- gg y 3 Reporg # go Frevent Recurrence O~ Sw o n
U 89-6 10/14/89 S 43.0 A 5 N/A N/A N/A Reactor downpower from 100% to 60%, to identify condenser tube leaks in the "A" train of the IP condenser.
- 1 89-7 10/28/89 5 48.4 A 5 N/A N/A N/A Reactor downpower from 100% to 60%, to repair the I.P
- , condenser tube leaks.
i i
l l
l
{'
Sutt4ARY : During October 1989, Perry-I experienced two downpower events for the reasons stated above. At nonth's ~
j end, Perry-I was operating at full power.
s 2 3 4 F: Forced Measons IGethod: Embibit C - Instructiano S: Sclieduled A-Equipment Failure (Emplain) I-Manual for Preparation of Data B-Maintesiance or Test 2-Manual Scrass Entry Sheets for Licensee C-Refueling 3-Automat ic Screen Event Report (I.ER) File (NUREC D-Negulatory Restriction 4-Cont inued 1022)
E-Operator Training & PReduced 1.o41 S
Liceuse Emasination 9-Other Enhibit 1-Same Source F-Administrative .
C-Operational Error (Esplais)
M-Other (Emplain) l
_ . _.,_,. _ ,_ , . _ _ . _ . . _ - . - . ._ _ _ _ . . . . . . _ _ . _ . _ _ . - _ - _ _ . _ _ . _ _ _ . . . . . . _ _ . _ _ _ . _ _ . _ . . _ _ _ _ _