NRC-89-0188, Monthly Operating Rept for Sept 1989 for Enrico Fermi Unit 2. W/891016 Ltr

From kanterella
(Redirected from ML19325D723)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1989 for Enrico Fermi Unit 2. W/891016 Ltr
ML19325D723
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1989
From: Anthony P, Orsrr W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-0188, CON-NRC-89-188 NUDOCS 8910260031
Download: ML19325D723 (5)


Text

, . ~' e  ?

.a F) g'-  %, t t g' st i

,,t'- i' . ttf PL t)

'c w ,a., (n e..I i,,m Reg Guide 1.16 .-

{O$ ee,.ss b r' >

E I . mu

'ONf@l.NTil re. sw H***

0. crations October 16, 1989  !

h NRC-89-0188 L t

0 i U. S. Nuclear Regulatory Commission  ;

Attention: Document. Control. Desk  !

Washington. D.C. 20555  !

Reference Fermi 2 NRC Docket No. 50-341  ;

NRC Operating License No. NPF-43 l Subject Monthly Operating Status Report /:

for September. 1989-j Enclosed for your infornation and use is the Fermi 2  :

Monthly Operating Status Report for September. 1989.

This report includes the Operating Data Report. Average  ;

Daily Unit Power Level, and the Summary of Unit Shutdowns  ;

and Power Reductions identified in NRC Regulatory Guide I 1.16 and Fermi 2 Technical Specification 6.9.1.6. Also.  !

attached is a revision to the Operating Data Report for l August, 1989.  ;

If'you have any questions, please contact Patricia [

. Anthony at (313) 586-1617.

i Sincerely,

$W l i

2nclosure I

cc: A. B. Davis l J. R. Eckert D. R. Hahn ,

R. C. Knop i T. R. Quay W. G. Rogers I

h i 1 8910260031 891016 \

PDR ADOCK 05000341  ;

R PNV j

p

', .,4 OPERATING DtTA REPORT COMP!ETED BY P. M. Anthony b , DOCKET NO. M1 . , _ . _ , ,

DATE ftt.)ber 16, Q8L ._ TELEPHONE (313)386-1617

[I OPERATING STATUS

1. UNIT WAM: Fermi 2 l Notes l l

! 2. REPORTING PERIOD: September, 1989 l l 3 LICENSED THERMAL POWER (MWL): 3292 ,

l # To be determined I

4. NAMEPLATE RATING (CROSS MWe): 1154 l I i
5. DESIGN ELICT RATING (Net MWe): 1093 l I l
6. MAX DEPEPDABLE CAP (GROSS MWe): l l
  1. l
7. MAX DEPENDABLE CAP (Net MWE): l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TIIROUGl! 7) SINCE LAST REPORT, GIVE REASONS: None
9. POWER I.EVEL TO WHICII RESTRICTED, IF ANY (MWo Net): None
10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTil YR TO DATE CUNULATIVE
11. HRS IN REPORTING PERIOD 720 6551 14.797
12. HRS REACTOR WAS CRITICAL 0 0 10,635 5
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0
14. HOURS CENERATOR ON-LINE 71.1 5290.2 _

10,011

15. UNIT RESERVE SHUTDOWN 110URS 0 0 0
16. GROSS litERMAL ENERGY GEN (MWil) 153,096 15,854,286 28,883.738
17. GROSS ELECT ENERGY GEN (MWil) 49,660 _ 5,343,904 9,622,608
18. NET ELECT ENERGY GEN (MWil) 47,060 5,117,826 _9,199,960
19. UNIT SERVICE FACTOR 99 80.8 67.7
20. UNIT AVAILABILITY FACTOR 99 80.8 67.7 e a e
21. UNIT CAP FACTOR (USING HDC NET)
22. UNIT CAP FACTOR (USING DER NET) 6.0 71.5 56.9  ;
23. UNIT FORCED OUTAGE RATE 25.9 10.7 17.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTIIS (TYPE, DATE, DURATION OF EACH)

On September 3, 1989, Fermi 2's turbine was shutdown due to liydrogen inIcakage into the stator cooling water system. The first refueling outage began on September 5. It is expected to last approximately 75 days.

25. IF SHUT DOWN 1.T END OF REPORT PERIOD, ESTIltATED DATE OF STARTUP: 11/25/89.
26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION):

FORECAST ACIIIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A  ;

r '. 3 l e

' AVERAGE DAILY UNIT P0"ER 1271L DOCKET NO. 50-341 UNIT FERMI 2

, DATE October 16, 1989 COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Month Septenter, 1989 DAY AVERAGE DAILf POWER LEVEL DAY AVERAGE TAILY POWER LEVEL (NWe-Net) (NWe-Net) 1 844 17 0 2 860 18 0 3 323 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 .

9 _o 25 0 _

10 0 26 0 l l

s 11 0 27 0 12 0 28 0 0 29 0 13 l 14 0 30 0 N/A  !

15 0 31 16 0 ,

D UNIT SHUYDouMS Amp peute WE90CTIO8e5 .g DOCMET NO. 50-341 DATE Octecer I. 1999 UNIT Natsf Feral 2 COesPLETED SW P. W. Anthony TELEPHONE (3131566-1617 REPORT MONTH Septeweer. 1969 T 4 $ e I i e i e i I l l l l l l NETHOD OF l LER l SYS l COesP l CAUSE & CORRECTIVE l l NO. I DATE l TYPE I DUR I REASON l SHUTTING DOwN I NO. I CODE l CODE l ACTION TO PREVENT l l l l (t) l (HRS)l (2) l THE REACTOR l l (4) l (5) l mECummENCE i l l l l I H (3) -l I I l l 1 I I I I I I I I I I I I I i i I I I 89-011 1 09/05/89 l F l 24.9 l 9 l t l N/A l TJ l ---- l Inspecting and repairing stator i I l l I i I I l i coottas =eter syste= l l 1 1 I I I I I l l l l l 09/05/89 I $ l 624 I C $ 4 i N/A l --- l ---- l Commenced scheduled work and I l l l l l l l l l l off-loaded the core. I I i 1 1 1 1 1 1 I I I

(I) F: FORCED (2) REASON: (3) #ETHOD: (4) E*HIBIT G - INSTRUCTIONS A - EQUIPMENT FAILURE (EkPLAIN) 1 - MANUAL FOR PREpamATION OF DATA S SCHEDULED B - WAINTENANCE OR TEST 2 - waNUAL scram ENTRW SHEETS FOR LICENSEE C - REFUELING 3 - AUTOWATIC SCRAM EVENT mEPO#T (LER) FILE D - REGULATORv RESTRICTION 4 - CONTINUED (NUREG-OtSt)

E - OPERATOR TRAINING & LICENSE ERAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- GPERATIONAL ERROR (EXPLAIN)

H - OT:tER (EXPLAIN) '5) EKHIBIT 1 - SAME SOURCE O

O

, .,,- , - . - - - - - , .,.n- . - . + , - - v --n. , , . , . . ,.c~ - , - -,,

. WERATIIIG MTA MPORT 1

. ,*mm I DOCKET NO. 50-141 COMPLETED BY P. M. Anthony MTE September 15. 1989 TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Fere! 2 l Notes: 1
2. MPORTING PERIOD: Aunust. 1989 l l l 3 LICENSED 21ERNAL POWER (NWt): 3292 l e To be determined l
4. MIEPLAft RATIIIG (CROSS We): 1154 l l S. DESIm ELtCT RATING (Not Nue): 1993 l l
6. IIAI DEPENDABLE CAP (GROSS IRie): e l l g l MAI BEPENDANLE CAP (Not WE): # 1 T. l
8. IF CHANCES OCCUR IN CAPACITT RATINGS (ITEMS NUMBER 3110100GH 7) SINCE LAST REPORT, CIVE REASONS: None 9 POWER LEVEL 10 NH!CH RESTRICTED, IP ANY (NWe Net): None** ,
10. REASONS FOR RESTRICTION, IF ANY: None I l

THIS HON 1H TR TO DATE CUNULATIVE l

11. M S IN RFPORTING PERIOD 744 5831 14.077
12. MRS REACTOR WAS CRITICAL 744 5541 10.563.5 lI f
13. REACTOR RESERVE SNUTDOWN HRS 0 0 0  ;

4

14. IIOURS GENERATOR OII-LINE _ 744 5219.1 9939.9 0
15. UNIT RESERVE SHUTDOWN HOURS 0 0
16. GROSS THERNAL ENERGY GEN (NWH) 2.270.160 15.701,190 28.730.642 l i
17. GROSS ELECT ENERGY GEN (NWH) 735.540 , 5.294.244 9.572.948
18. NET ELECT ENERGY GEN (WH) 704.932 5.070.766 9.152.900
19. UNIT SERVICE FACTOR 100 89.5 70.6  !
20. UNIT AVAILABILITY FACTOR 100 89.5 70.6 l

e e e

21. Ull!T CAP FACTOR (USING MDC NET) l l 22. WIT CAP PACTOR (USING DER IET) 86.7 79.5 59.5 l 23. WIT PORCED OUTAot RATE O 10.5 17.5
24. SNUTDOWIts SCHEDULED OFER MIT 6 N01 MIS (TTPE, Daft, SURATION OF EACH) l
On September 3, 1989, Forst 2's turbine was shutdown due to hydrogen inloakage into the stator cooling unter system. The first refueling outage uns to begin en September 8. It is expoeted to last approstaately 75 days.  ;
25. IF SIUT DOWN AT EllD OF REPORT PERIOD, ESTINAftD DATE OF STARTUP: N/A i
26. UNITS IN TEST STATUS (PRIOR TO 0010ERCIAL OPERATI0ll):  ;

PORBCAST AQlltVED  ;

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A

  • 0010ERCI AL OPERAT10N N/A N/A y