ML19248C992

From kanterella
Jump to navigation Jump to search
LER 79-016/03L-0 on 790628:while at Power,Routine Surveillance Test Revealed Setpoint of Switch 2 Was Below Tech Spec Min.Caused by Barton Model 288 Instrument Out of Calibr from Drift.Instrument Recalibr
ML19248C992
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/24/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-79-016-03L, LER-79-16-3L, NUDOCS 7907270238
Download: ML19248C992 (1)


Text