Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
Other: ML18247A211, ML19008A394, ML19008A395, ML19008A396, ML19008A397, ML19008A405, ML20195A857, ML21050A309, ML21228A106, ML21281A171, ML22122A230, ML22235A795, ML22321A313, ML22323A006, ML23055A028, ML23055A029, ML23067A100
|
MONTHYEARML18184A4442018-06-27027 June 2018 Lacrossesolutions, LLC - Application for Order Approving License Transfer and Conforming Administrative License Amendments Project stage: Request ML18247A2112018-10-0303 October 2018 LACBWR - Initial FRN Regarding the Lacrosse Solutions License Transfer Application and Associated Conforming Administrative License Amendments to Transfer License to the Dairyland Power Cooperative (CAC No. 000083; EPID L-2018-LNS-0002) Project stage: Other ML18283A0442018-11-0101 November 2018 Boiling Water Reactor - Acceptance Review of the Lacrosse Solutions License Transfer Application and Associated Conforming Administrative License Amendment to Transfer the Operating License to the Dairyland Power Cooperative ... Project stage: Acceptance Review ML19092A2412019-03-25025 March 2019 Lacrosse Boiling Water Reactor Report on Status of Decommissioning Funding for Shutdown Reactor Project stage: Request ML19008A3972019-09-24024 September 2019 LACBWR License Transfer SE - Enclosure 3 Project stage: Other ML19008A3932019-09-24024 September 2019 License Transfer to Dairyland Project stage: Request ML19008A3962019-09-24024 September 2019 LACBWR License Transfer Order - Enclosure 1 Project stage: Other ML19008A3952019-09-24024 September 2019 Order Approving Transfer of the License for the La Crosse Boiling Water Reactor to Dairyland Power Cooperative and Conforming Administrative License Amendment Project stage: Other ML19008A3942019-09-24024 September 2019 LACBWR License Transfer Amendment No. 76 - Enclosure 2 Project stage: Other ML19008A4052019-09-26026 September 2019 LACBWR License Transfer Issuance FRN Project stage: Other ML20188A2282020-06-24024 June 2020 Lacrossesolutions, LLC - Request for Extension of Order Approving Trans(Er of the License for the La Crosse Boiling Water Reactor to Dairyland Power Cooperative Project stage: Request ML20195A8462020-09-0101 September 2020 License Transfer Order Extension Approval Project stage: Request ML20195A8572020-09-0101 September 2020 LACBWR License Transfer Order Extension Letter Project stage: Other ML21036A0552021-02-0202 February 2021 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC to Dairyland Power Cooperative Project stage: Request ML21050A3092021-03-0909 March 2021 LACBWR License Transfer Order Second Extension Letter Project stage: Other ML21218A0082021-08-10010 August 2021 NSIR Review of the Three Mile Island Physical Security Plan Revision 24 for the Verification of ASM 20-103 Incorporation Project stage: Approval ML21230A3302021-08-17017 August 2021 Lacrossesolutions, LLC, Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor Project stage: Request ML21228A1052021-08-30030 August 2021, 31 August 2021 License Transfer Order Third Extension Approval Project stage: Request ML21228A1062021-08-30030 August 2021 LACBWR License Transfer Order Third Extension Letter Project stage: Other ML21281A1712021-12-0707 December 2021 General Atomics Triga Reactor Facility - Approval of License Termination Based on the Final Status Survey Report and Supporting Information Project stage: Other ML22040A2752022-02-11011 February 2022 NSIR Staff Review of the Duane Arnold Energy Center Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Verification of ASM EA-02-104 Incorporation Project stage: Approval ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License Project stage: Other ML22277A3502022-05-31031 May 2022, 5 July 2022, 9 August 2022, 16 August 2022, 22 August 2022, 7 September 2022 Class 1 Fssr Review - Clarification Activities Project stage: Request ML22223A0882022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas Project stage: Request ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative Project stage: Request ML22235A7952022-09-12012 September 2022 FRN - La Crosse Boiling Water Reactor License Transfer Order Fourth Extension Approval Project stage: Other ML22235A7922022-09-12012 September 2022 License Transfer Order Fourth Extension Approval Project stage: Request ML22278A0272022-10-12012 October 2022 Request for Confirmatory Information Related to the Review of the Class 1 Survey Units Project stage: Request ML22278A0292022-10-12012 October 2022 Enclosure Request for Confirmatory Information Enclosure Related to the Review of the Class 1 Survey Units Project stage: Approval ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units Project stage: Approval ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative Project stage: Request ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter Project stage: Other ML22321A3092022-12-0808 December 2022 License Transfer Order Fifth Extension Approval Project stage: Request ML22323A0062022-12-12012 December 2022 LACBWR License Transfer Order Fifth Extension FRN Project stage: Other ML23055A0292023-02-24024 February 2023 Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release Project stage: Other ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 Project stage: Other ML23067A1002023-03-0808 March 2023 Amendment No. 9 to Indemnity Agreement No. B-62 for La Crosse Boiling Water Reactor Project stage: Other 2021-08-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24351A1792024-12-11011 December 2024 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML24249A3202024-09-0404 September 2024 Quality Assurance Program Application to Transportation Activities Pursuant to 10 CFR 71.101(f) IR 07200046/20244012024-07-23023 July 2024 Independent Spent Fuel Storage Installation – NRC Security Inspection Report 07200046/2024401 IR 05000409/20240012024-07-17017 July 2024 NRC Inspection Report 05000409/2024001(DRSS); 07200046/2024001(DRSS) ML24193A1152024-07-0909 July 2024 Intent to Implement NAC-MPC CoC No. 1025, Amendment No. 7, Revision 1 ML24136A2432024-05-24024 May 2024 Independent Spent Fuel Storage Installation - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 ML24121A0732024-04-16016 April 2024 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML24058A1222024-02-27027 February 2024 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24045A1592024-01-25025 January 2024 LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report ML24045A1612024-01-25025 January 2024 LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML24031A6432023-12-20020 December 2023 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML23341A0222023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23192A0612023-06-14014 June 2023 Possession-Only License DPR-45 - Formal Announcement of New ISFSI Manager ML23192A1082023-06-14014 June 2023 Possession-Only License DPR-45 - New Chief Nuclear Officer Selected ML23137A1552023-05-0202 May 2023 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML23130A1202023-05-0202 May 2023 Transmittal of Financial Statement and Auditors Report ML23115A1712023-04-0404 April 2023 ISFSI - Nuclear Liability Insurance Coverage ML23115A1742023-04-0303 April 2023 Independent Spent Fuel Storage Installation, Adoption of Amendment 7 of NAC MPC Certificate of Compliance No. 72-1025 and Canister Registration ML23074A0552023-03-13013 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML23076A0402023-03-0606 March 2023 Notification of License Transfer Date from Lacrossesolutions, LLC to Dairyland Power Cooperative ML23060A0732023-02-27027 February 2023 Annual Radiological Environmental Operating Report ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23033A0682023-01-26026 January 2023 Proof of Financial Protection ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000409/20220012022-12-27027 December 2022 NRC Inspection Report No. 05000409/2022001(DRSS) ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22297A0042022-10-20020 October 2022 Response to October 14, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22285A0782022-10-13013 October 2022 NRC Analysis of Energy Solutions Decommissioning Funding Status Report Docket No. 50-409 ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units ML22269A3902022-09-0707 September 2022 Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22224A1172022-07-14014 July 2022 Possession-Only License DPR-45 Chief Nuclear Officer Selected ML22224A1372022-07-12012 July 2022 Quality Assurance Program Description (Oapd), Revision 31 ML22203A0932022-07-11011 July 2022 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan IR 07200046/20224012022-06-0101 June 2022 (Decommissioning) - Independent Spent Fuel Storage Installation Security Inspection Report 07200046/2022401 ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License ML22146A2002022-05-24024 May 2022 Submittal of Quality Assurance Program Changes ML22123A0822022-04-25025 April 2022 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML22068A2102022-04-20020 April 2022 Issuance of Amendment No. 77 Approving Independent Spent Fuel Storage Installation Emergency Plan, Revision 40 ML22108A0562022-03-28028 March 2022 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation ML22084A0092022-03-22022 March 2022 Annual Property Insurance Status Report ML22077A0132022-03-15015 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactor ML22069A1282022-03-0808 March 2022 Lacrossesolutions, LLC, La Crosse Boiling Water Reactor (LACBWR) Annual Radiological Environmental Operating Report, Supplemental Letter ML22062B0362022-02-28028 February 2022 Annual Radiological Environmental Operating Report ML22033A1472022-01-26026 January 2022 Submittal of Decommissioning Plan and Post-Shutdown Decommissioning Activities Report, and License Termination Plan Changes ML22031A1162022-01-26026 January 2022 CFR 50.59 I 10 CFR 72.48 Report of Changes, Tests, and Experiments 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 24, 2019 EA-19-077 Mr. John Sauger Executive Vice President Chief Nuclear Officer Reactor D&D EnergySolutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202
SUBJECT:
ORDER APPROVING TRANSFER OF THE LICENSE FOR THE LA CROSSE BOILING WATER REACTOR FROM LACROSSESOLUTIONS, LLC TO DAIRYLAND POWER COOPERATIVE AND CONFORMING ADMINISTRATIVE LICENSE AMENDMENT (CAC NO. 000083; EPID-L-2018-LNS-0002)
Dear Mr. Sauger:
By letter dated June 27, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18184A444), as supplemented by letter dated December 3, 2018 (ADAMS Accession No. ML18341A138), LaCrosseSolutions, LLC (LS) and Dairyland Power Cooperative (DPC) (collectively, the applicants) submitted an application, pursuant to Section 184 of the Atomic Energy Act of 1954, as amended, and Section 50.80, Transfer of licenses, of Title 10 of the Code of Federal Regulations (10 CFR), requesting U.S. Nuclear Regulatory Commission (NRC) consent for the direct transfer of LSs Possession Only License No. DPR-45 for the La Crosse Boiling Water Reactor (LACBWR) to DPC.
Specifically, the applicants requested that the NRC consent to the transfer of LSs NRC-licensed possession, maintenance, and decommissioning authorities back to DPC upon the completion of decommissioning activities at the LACBWR site. The applicants also requested approval of a conforming amendment to the license pursuant to 10 CFR 50.80 and 10 CFR 50.90, Application for amendment of license, construction permit, or early site permit. Notice of the application was published in the Federal Register (FR) on October 11, 2018 (83 FR 51509).
The supplemental letter dated December 3, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs no significant hazards consideration determination.
DPC is currently the licensed owner of LACBWR; it holds title to and ownership of the real estate encompassing most of the LACBWR site, as well as lease hold interests for the remaining portions of the site; title to and ownership of the spent nuclear fuel; and title to and ownership of all improvements at the LACBWR site. LS currently maintains a lease for the above-ground LACBWR structures (other than the LACBWR independent spent fuel storage
J. Sauger installation (ISFSI)) and previously assumed responsibility for all NRC-licensed activities at the LACBWR site, including responsibility under the license to complete decommissioning. LS will relinquish any remaining lease rights it holds at the site upon completion of decommissioning.
Upon the execution of the license transfer, DPC will maintain the onsite ISFSI and the ultimate disposition of the spent nuclear fuel will be provided for under the terms of DPCs Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Waste with the U.S. Department of Energy. DPC will also continue to maintain its nuclear decommissioning trust, an external trust in which funds are segregated from its assets and outside its administrative control.
The NRC staff has completed its review of the LACBWR license transfer application. is the Order, which provides consent to the proposed license transfer, subject to the condition described therein, and approves the conforming license amendment. Enclosure 2 provides the conforming amendment for LACBWR, which will be issued and become effective at the time the transfer is consummated. Enclosure 3 provides the NRC staffs safety evaluation (SE) related to the preceding actions. The SE will be placed in the NRC public document room and added to the ADAMS Publicly Available Records System Library.
A copy of the Order has been forwarded to the Office of the Federal Register for publication.
Should you have any questions concerning this action, please contact me at (301) 415-3178 or via e-mail at marlayna.doell@nrc.gov.
Sincerely,
/RA/
Marlayna Vaaler Doell, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-409 and 72-046 License No.: DPR-45
Enclosures:
- 1. Order
- 2. Conforming Amendment to DPR-45
- 3. Safety Evaluation cc w/enclosures: La Crosse Boiling Water Reactor Service List
Package: ML19008A393 Letter: ML19008A395 Order: ML19008A396 Amendment: ML19008A394
- by memo / e-mail SE: ML19008A397 FRN: ML19008A405 OFFICE NMSS/RDB/PM NMSS/DUWP/LA NRR/PFPB/BC NMSS/RDB/BC OGC - NLO NAME MVaaler CHolston ABowers* BWatson JWachutka*
DATE 1/8/2019 1/10/2019 4/12/2019 4/23/2019 6/7/2019 OFFICE NMSS/DUWP/D OE/D NMSS/QTE NMSS/D NMSS/RDB/PM NAME JTappert GWilson* LMoorin* JLubinski MDoell DATE 7/5/2019 7/15/2019 8/9/2019 9/24/2019 9/24/2019 La Crosse Boiling Water Reactor Service List:
Ken Robuck Jeffery Kitsembel President and CEO Division of Energy Regulation EnergySolutions Wisconsin Public Service Commission 299 South Main Street, Suite 1700 P.O. Box 7854 Salt Lake City, UT 84111 Madison, WI 53707-7854 John Sauger Paul Schmidt, Manager Executive VP and Chief Nuclear Officer Radiation Protection Section Reactor D & D Bureau of Environmental and Occupational Health EnergySolutions Division of Public Health 121 W. Trade Street, Suite 2700 Wisconsin Department of Health Services Charlotte, NC 28202 P.O. Box 2659 Madison, WI 53701-2659 Gerard van Noordennen VP Regulatory Affairs Barbara Nick EnergySolutions President and CEO 121 W. Trade Street, Suite 2700 Dairyland Power Cooperative Charlotte, NC 28202 3200 East Avenue South, La Crosse, WI 54602-0817 Joseph Nowak General Manager Cheryl Olson, ISFSI Manager LaCrosseSolutions La Crosse Boiling Water Reactor S4601 State Highway 35 Dairyland Power Cooperative Genoa, WI 54632-8846 S4601 State Highway 35 P.O. Box 817 Russ Workman Genoa, WI 54632-8846 General Counsel EnergySolutions Lane Peters, Site Manager 299 South Main Street, Suite 1700 La Crosse Boiling Water Reactor Salt Lake City, UT 84111 Dairyland Power Cooperative S4601 State Highway 35 Jerome Pedretti, Clerk Genoa, WI 54632-8846 Town of Genoa E860 Mundsack Road Thomas Zaremba Genoa, WI 54632 Wheeler, Van Sickle and Anderson, S.C.
44 East Mifflin Street, Suite 1000 Regional Administrator Madison, WI 53703 U.S. NRC, Region III 2443 Warrenville Road John E. Matthews Lisle, IL 60532-4352 Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004