ML24045A159
| ML24045A159 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 01/25/2024 |
| From: | Jeremy G. Browning Dairyland Power Cooperative |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| LAC?14541 | |
| Download: ML24045A159 (1) | |
Text
JeremyBrowning ChiefNuclearOfficer
3200EastAve.S.*POBox817*LaCrosse,WI546020817*6087871258*6087871420fax*www.dairylandpower.com DairylandPowerCooperativeisanequalopportunityproviderandemployer.
January25,2024
Inreply,pleaserefertoLAC14541
ATTN:DocumentControlDesk U.S.NuclearRegulatoryCommission Washington,D.C.205550001
SUBJECT:
LaCrosseBoilingWaterReactor
FacilityOperatingLicenseNo.DPR45
NRCDocketNos.50409and72046 LaCrosseBoilingWaterReactorSubmittalofDecommissioningPlanandPost ShutdownDecommissioningActivitiesReport
References:
- 1) LaCrosseSolutions,LLCletter,LaCrosseBoilingWaterReactor(LACBWR)
SubmittalofDecommissioningPlanandPostShutdownDecommissioningActivities ReportandLicenseTerminationPlanChanges,"datedJanuary26,2022
- 2) NRCRegulatoryIssueSummary201517,"ReviewandSubmissionofUpdatesto FinalSafetyAnalysisReports,EmergencyPreparednessDocuments,andFire ProtectionDocuments"
- 3) LaCrosseBoilingWaterReactorDecommissioningPlanandPostShutdown DecommissioningActivitiesReportRevisedAugust2023(ADAMSAccessionNumber ML23234A102)
- 4) LACBWRLicenseTransferAmendmentIssuance(ML19009A154)
TheLaCrosseBoilingWaterReactor(LACBWR)DecommissioningPlanandPostShutdown DecommissioningActivitiesReport(DPlan/PSDAR)isrecognizedastheLACBWRSafetyAnalysis Report(SAR)equivalentasitcontainstheplantpostfuelaccidentanalysis.Therefore,theD Plan/PSDARissubjecttorevisionsbeingsubmittedtotheNRCona24monthintervalin accordancewithI0CFR50.7l(e)(4).
Inaccordancewiththerequirementsof10CFR50.4,"WrittenCommunications,"paragraph (b)(6),DairylandPowerCooperative(DPC)submittedtheAugust2023revisionoftheD Plan/PSDARforLACBWR(Reference3).Inaccordancewith10CFR50.71(e)(4),theupdateis beingsubmittedwithin24monthsofthepreviousrevisionwhichwassubmittedinReference1.
LAC14541 Page2of2 ThereactorfacilitydecommissioningactivitiesaddressedbytheLACBWRLTParenowcomplete andthereisnolongeraneedfortheLTPtobemaintainedorupdatedinaccordancewith either10CFR50.82,TerminationofLicense,or10CFR50.71,MaintenanceofRecords, MakingofReports.AnewLTPwillberequiredinthefutureinaccordancewith10CFR 50.82(a)(9)tosupportdecommissioningthegenerallylicensedLACBWRISFSIandfinal terminationoftheLACBWRlicense.
Therearenoregulatorycommitmentscontainedinthissubmittal.
ThisDPlan/PSDARupdatewaspreviouslyprovidedon7/27/2023onatotalreplacementbasis, satisfyingthesubmittalrequirementsofI0CFR50.4(b)(6),asdiscussedinReference2.The changestotheDPlan/PSDARreflecttransferofthelicensedfacilityfromLaCrosseSolutions,LLC (LS)backtoDPC,whichreducedthelicensedareatothe38.9acreOwnerControlledAreaof theISFSIandreflectsthestandaloneISFSIstatus.
Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMartyMoe,ISFSI ManageratMarty.Moe@DairylandPower.comor6087921745.
Respectfully,
JeremyBrowning VP/ChiefNuclearOfficer
DairylandPowerCooperative
JRB:MGM:tco
cc:
BernardWhite NRCProjectManager
TildaLui NRCProjectManager
JackGiessner RegionalAdministrator
YoiraDiazSanabria DivisionofFuelManagement