ML24045A159

From kanterella
Jump to navigation Jump to search
LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report
ML24045A159
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 01/25/2024
From: Jeremy G. Browning
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LAC?14541
Download: ML24045A159 (1)


Text

JeremyBrowning ChiefNuclearOfficer

January25,2024 10CFR50.54 10CFR50.71

Inreply,pleaserefertoLAC14541

ATTN:DocumentControlDesk U.S.NuclearRegulatoryCommission Washington,D.C.205550001

SUBJECT:

LaCrosseBoilingWaterReactor FacilityOperatingLicenseNo.DPR45 NRCDocketNos.50409and72046 LaCrosseBoilingWaterReactorSubmittalofDecommissioningPlanandPost ShutdownDecommissioningActivitiesReport

References:

1) LaCrosseSolutions,LLCletter,LaCrosseBoilingWaterReactor(LACBWR)

SubmittalofDecommissioningPlanandPostShutdownDecommissioningActivities ReportandLicenseTerminationPlanChanges,"datedJanuary26,2022

2) NRCRegulatoryIssueSummary201517,"ReviewandSubmissionofUpdatesto FinalSafetyAnalysisReports,EmergencyPreparednessDocuments,andFire ProtectionDocuments"
3) LaCrosseBoilingWaterReactorDecommissioningPlanandPostShutdown DecommissioningActivitiesReportRevisedAugust2023(ADAMSAccessionNumber ML23234A102)
4) LACBWRLicenseTransferAmendmentIssuance(ML19009A154)

TheLaCrosseBoilingWaterReactor(LACBWR)DecommissioningPlanandPostShutdown DecommissioningActivitiesReport(DPlan/PSDAR)isrecognizedastheLACBWRSafetyAnalysis Report(SAR)equivalentasitcontainstheplantpostfuelaccidentanalysis.Therefore,theD Plan/PSDARissubjecttorevisionsbeingsubmittedtotheNRCona24monthintervalin accordancewithI0CFR50.7l(e)(4).

Inaccordancewiththerequirementsof10CFR50.4,"WrittenCommunications,"paragraph (b)(6),DairylandPowerCooperative(DPC)submittedtheAugust2023revisionoftheD Plan/PSDARforLACBWR(Reference3).Inaccordancewith10CFR50.71(e)(4),theupdateis beingsubmittedwithin24monthsofthepreviousrevisionwhichwassubmittedinReference1.

3200EastAve.S.*POBox817*LaCrosse,WI546020817*6087871258*6087871420fax*www.dairylandpower.com DairylandPowerCooperativeisanequalopportunityproviderandemployer.

LAC14541 Page2of 2

Thereactorfacilitydecommissioningactivitiesaddressed bytheLACBWRLTPare nowcomplete and there isnolongeraneedfor theLTPtobemaintainedorupdated in accordancewith either10 CFR50.82,TerminationofLicense, or10 CFR50.71,Maintenance ofRecords, Making ofReports.AnewLTPwillberequired in thefuturein accordancewith 10 CFR 50.82(a)(9)tosupportdecommissioningthegenerallylicensed LACBWRISFSIand final terminationoftheLACBWRlicense.

Thereare noregulatorycommitmentscontained in thissubmittal.

This D Plan/PSDARupdatewaspreviouslyprovidedon7/27/2023onatotal replacementbasis, satisfyingthesubmittalrequirementsofI0 CFR50.4(b)(6),asdiscussedin Reference 2.The changestotheD Plan/PSDARreflecttransferofthelicensed facilityfromLaCrosseSolutions, LLC (LS)backtoDPC,which reducedthelicensed areatothe38.9acre OwnerControlledAreaof theISFSIand reflectsthestand aloneISFSIstatus.

Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMartyMoe,ISFSI Manager atMarty.Moe@DairylandPower.comor6087921745.

Respectfully,

JeremyBrowning VP/ChiefNuclearOfficer Dairyland PowerCooperative

JRB:MGM:tco

cc:

BernardWhite NRCProjectManager

TildaLui NRCProjectManager

JackGiessner RegionalAdministrator

Yoira Diaz Sanabria DivisionofFuelManagement