LACBWR License Transfer Order Second Extension Letter
ML21050A309
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 03/09/2021
From: Marlayna Vaaler Doell
Office of Nuclear Material Safety and Safeguards
To: Sauger J
Energy Solutions
Doell M
Shared Package
ML21050A299 List:
References
CAC 000083, EA-19-077, EPID-L-2020-LLO-0004
Download: ML21050A309 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 9, 2021 EA-19-077 Mr. John Sauger Executive Vice President Chief Nuclear Officer Reactor D&D EnergySolutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202

SUBJECT:

ORDER EXTENDING THE EFFECTIVENESS OF THE APPROVAL OF THE TRANSFER OF THE POSSESSION ONLY LICENSE FOR THE LA CROSSE BOILING WATER REACTOR FROM LACROSSESOLUTIONS, LLC TO DAIRYLAND POWER COOPERATIVE AND CONFORMING AMENDMENT (CAC NO. 000083; EPID-L-2020-LLO-0004)

Dear Mr. Sauger:

The U.S. Nuclear Regulatory Commission (NRC) is issuing the enclosed Order (Second Extension Order) in response to your request dated February 2, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21036A055), on behalf of LaCrosseSolutions, LLC for the second extension of the effectiveness of an NRC Order dated September 24, 2019 (Transfer Order) (ADAMS Package Accession No. ML19008A393).

The Transfer Order approved the transfer of Possession Only License No. DPR-45, held by LaCrosseSolutions, LLC, for the La Crosse Boiling Water Reactor (LACBWR) to Dairyland Power Cooperative and approved a conforming license amendment in accordance with Section 50.80, Transfer of licenses, and Section 50.90, Application for amendment of license, construction permit, or early site permit, of Title 10 of the Code of Federal Regulations (10 CFR). The Transfer Order was intended to be implemented upon completion of decommissioning activities at the LACBWR site, and was effective for one year from issuance.

By letter dated June 24, 2020 (ADAMS Accession No. ML20188A228), LaCrosseSolutions, LLC submitted a request to extend the effectiveness of the Transfer Order by six months. By Order dated September 1, 2020 (First Extension Order) (ADAMS Package Accession No. ML20195A846), the Commission extended the Transfer Orders expiration date to March 24, 2021.

The NRC staff has considered the information presented in your February 2, 2021, request and determined that you have shown good cause for extending the effectiveness of the Transfer Order by an additional six months from March 24, 2021, to September 24, 2021. The enclosed Second Extension Order approves this extension. The previously approved conforming license amendment will be issued and made effective when the transfer is complete.

J. Sauger 2 The NRC Safety Evaluation enclosed with the September 24, 2019, Transfer Order remains valid. The Second Extension Order is being forwarded to the Office of the Federal Register for publication.

In accordance with 10 CFR 2.390, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this action, please contact me at 301-415-3178 or via e-mail at marlayna.doell@nrc.gov.

Sincerely, Signed by Doell, Marlayna on 03/09/21 Marlayna Vaaler Doell, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-409 and 72-046 License No.: DPR-45

Enclosure:

Order Extending the Effectiveness of the Approval of the Transfer of License and Conforming Amendment cc w/enclosure: Distribution via Listserv

ML21050A299; Ltr ML21050A309

  • via email NMSS/DUWP OGC/GCHA/AGCOR OFFICE NMSS/DUWP/RDB* NMSS/DUWP/RDB*

/LLWPB* /NLO*

NAME MDoell MD JHickman JH BWatson BW JWachutka JW DATE Mar 5, 2021 Mar 5, 2021 Mar 5, 2021 Mar 5, 2021 NMSS/DUWP OFFICE NMSS/DUWP* SECY* NMSS

/LLWPB NAME PHolahan PH WMoore WM JLubinski JL MDoell MD DATE Mar 5, 2021 Mar 8, 2021 Mar 9, 2021 Mar 9, 2021