ML24045A161
ML24045A161 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 01/25/2024 |
From: | Jeremy G. Browning Dairyland Power Cooperative |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
LAC?14542 | |
Download: ML24045A161 (1) | |
Similar Documents at La Crosse | |
---|---|
Category:Letter
MONTHYEARML24249A3202024-09-0404 September 2024
[Table view]Quality Assurance Program Application to Transportation Activities Pursuant to 10 CFR 71.101(f) IR 07200046/20244012024-07-23023 July 2024 Independent Spent Fuel Storage Installation – NRC Security Inspection Report 07200046/2024401 IR 05000409/20240012024-07-17017 July 2024 NRC Inspection Report 05000409/2024001(DRSS); 07200046/2024001(DRSS) ML24193A1152024-07-0909 July 2024 Intent to Implement NAC-MPC CoC No. 1025, Amendment No. 7, Revision 1 ML24136A2432024-05-24024 May 2024 Independent Spent Fuel Storage Installation - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 ML24121A0732024-04-16016 April 2024 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML24058A1222024-02-27027 February 2024 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24045A1612024-01-25025 January 2024 LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML24045A1592024-01-25025 January 2024 LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report ML24031A6432023-12-20020 December 2023 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML23341A0222023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23192A0612023-06-14014 June 2023 Possession-Only License DPR-45 - Formal Announcement of New ISFSI Manager ML23192A1082023-06-14014 June 2023 Possession-Only License DPR-45 - New Chief Nuclear Officer Selected ML23130A1202023-05-0202 May 2023 Transmittal of Financial Statement and Auditors Report ML23137A1552023-05-0202 May 2023 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML23115A1712023-04-0404 April 2023 ISFSI - Nuclear Liability Insurance Coverage ML23115A1742023-04-0303 April 2023 Independent Spent Fuel Storage Installation, Adoption of Amendment 7 of NAC MPC Certificate of Compliance No. 72-1025 and Canister Registration ML23074A0552023-03-13013 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML23076A0402023-03-0606 March 2023 Notification of License Transfer Date from Lacrossesolutions, LLC to Dairyland Power Cooperative ML23060A0732023-02-27027 February 2023 Annual Radiological Environmental Operating Report ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23033A0682023-01-26026 January 2023 Proof of Financial Protection ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000409/20220012022-12-27027 December 2022 NRC Inspection Report No. 05000409/2022001(DRSS) ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22297A0042022-10-20020 October 2022 Response to October 14, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22285A0782022-10-13013 October 2022 NRC Analysis of Energy Solutions Decommissioning Funding Status Report Docket No. 50-409 ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units ML22269A3902022-09-0707 September 2022 Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22224A1172022-07-14014 July 2022 Possession-Only License DPR-45 Chief Nuclear Officer Selected ML22224A1372022-07-12012 July 2022 Quality Assurance Program Description (Oapd), Revision 31 ML22203A0932022-07-11011 July 2022 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan IR 07200046/20224012022-06-0101 June 2022 (Decommissioning) - Independent Spent Fuel Storage Installation Security Inspection Report 07200046/2022401 ML22146A2002022-05-24024 May 2022 Submittal of Quality Assurance Program Changes ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License ML22123A0822022-04-25025 April 2022 Possession-Only License DPR-45 - Financial Statement and Auditors Report ML22068A2102022-04-20020 April 2022 Issuance of Amendment No. 77 Approving Independent Spent Fuel Storage Installation Emergency Plan, Revision 40 ML22108A0562022-03-28028 March 2022 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation ML22084A0092022-03-22022 March 2022 Annual Property Insurance Status Report ML22077A0132022-03-15015 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactor ML22069A1282022-03-0808 March 2022 Lacrossesolutions, LLC, La Crosse Boiling Water Reactor (LACBWR) Annual Radiological Environmental Operating Report, Supplemental Letter ML22062B0362022-02-28028 February 2022 Annual Radiological Environmental Operating Report ML22033A1472022-01-26026 January 2022 Submittal of Decommissioning Plan and Post-Shutdown Decommissioning Activities Report, and License Termination Plan Changes ML22031A1162022-01-26026 January 2022 CFR 50.59 I 10 CFR 72.48 Report of Changes, Tests, and Experiments IR 05000409/20210012022-01-0707 January 2022 NRC Inspection Report No. 05000409/2021-001 La Crosse Boiling Water Reactor 2024-09-04 Category:Report MONTHYEARML24045A1612024-01-25025 January 2024
[Table view]LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML23055A0292023-02-24024 February 2023 Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release ML22269A3882022-09-0707 September 2022 02-Gamma Spectroscopy of Concrete Pucks ML22269A3912022-09-0707 September 2022 03-L1-SUB-CDR Release Record R.2 Final ML22269A3932022-09-0707 September 2022 05-LACBWR Gamma Spec Typo ML22223A0702022-07-28028 July 2022 Energysolutions, LLC, ES-LCR-CR-2017-0073, Survey Unit 010-101-C WTB Subfoundation ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22223A0722022-07-28028 July 2022 Lacrossesolutions, LLC, LC-RS-PN-164017-001, Rev. 0, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0732022-07-28028 July 2022 FSS Plan 101C, Waste Treatment Building Subsoil Excavation, FSS Unit L1-010-101C, Subsurface Soil ML22223A0742022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Final Status Survey Data Assessment Data Assessment ML22223A0752022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-008, Rev 0, LACBWR Site Restoration Project Final Radiation Survey Data Assessment ML22223A0762022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO1-SB, WTB Excavation ML22223A0772022-07-28028 July 2022 Lacrossesolutions, LLC, GG-EO-313196-RS-RP-001, Rev. 0, Characterization Survey Report for GG-EO-313196-RS-RP-001 La Crosse Boiling Water Reactor ML22223A0782022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO3-SB WTB Excavation ML22223A0802022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 1, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22223A0812022-07-28028 July 2022 Lacrossesolutions, LLC, Apex-Gamma, L1-010-101-FR-GS-CO2-SB, WTB Excavation ML22223A0822022-07-28028 July 2022 Lacrossesolutions, LLC, LC-FS-PR-010, Rev. 2, LACBWR Site Restoration Project Work Control Procedure Isolation and Control for Final Status Survey ML22068A0902022-03-0909 March 2022 Draft License Termination Plan License Amendment Request - Zion Units 1 and 2 ML21189A2022021-03-0808 March 2021 Enclosure 1: Description and Evaluation of Changes ML20352A2372020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 2 Final Report Revision 1 ML20352A2382020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 a Release Record Revision 1, Final, Storm Drain 3 ML20352A2392020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, Phase 3 Final Report Revision 1 ML20352A2402020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B1-010-004 Release Record Revision 1, Waste Gas Tank Vault Basement ML20352A2412020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 a Release Record, Revision 1, Final, De-Icing Line ML20352A2422020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-103 Release Record, Revision 1, Final, Circulating Water Intake Pipe ML20352A2432020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-102 B Release Record, Revision 1, Final, Storm Drain 5 ML20352A2442020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-101 Release Record Revision 1, LACBWR Crib House ML20352A2452020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S2-011-101 B Release Record Revision 1, Final, Storm Drain 6 ML20352A2462020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S1-011-102 Release Record Revision 1, Final, Circulating Water Discharge Pipe ML20352A2472020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, S3-012-109 B Release Record, Revision 1, Final, Storm Drain 2 ML20352A2492020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-103 Release Record Revision 1, Genoa 1 Crib House ML20352A2502020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 Release Record, Rev. 1, Reactor Building, WTB, Wgtv, Ventilation Stack Grounds ML20352A2512020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS a Release Record, Rev. 1, Eastern Portion TB, Sump, Pit, Diesel ML20352A2522020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-102 Release Record Revision 1, Genoa 3 Crib House ML20352A2532020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B2-010-103 Release Record Revision 1, Administration Building ML20352A2542020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-109 Release Record, Revision 1, Security Station ML20352A2552020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-TDS Release Record, Rev. 1, L1-010-102 Excavation ML20352A2572020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-105 Release Record, Rev. 1, North Interim Debris Storage Area ML20352A2582020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-104 Release Record, Rev. 1, G3 Crib House, Circ. Water Discharge Land ML20352A2592020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LACBWR IC Dose Calculations ML20352A2612020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-104 Release Record, Revision 1, Barge Wash Break Room ML20352A2622020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L2-011-101 Release Record, Rev. 1, Area North of Lse Fence ML20352A2632020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-107 Release Record, Rev. 1, Outside East Lse Area ML20352A2642020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-102 Release Record, Revision 1, Transmission Sub-Station Switch House ML20352A2652020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-104 Release Record, Rev. 1, North Lse Grounds ML20352A2662020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-010-101 C Release Record, Rev. 1, Waste Treatment Building Excavation ML20352A2672020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, B3-012-101 Release Record, Revision 1, Back-Up Control Center ML20352A2682020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, L1-SUB-CDR Release Record, Rev. 1, Stack, Pipe Tunnel, RPGPA Excavation ML20352A2692020-11-0202 November 2020 Response to Request for Additional Information Re Revised Final Status Survey Final Reports, LC-FS-TSD-005, Revision 0, MCNP Modeling of Water Discharge Pipes for the Lacrosse Boiling Water Reactor 2024-01-25 Category:Miscellaneous MONTHYEARML24045A1612024-01-25025 January 2024
[Table view]LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML23055A0292023-02-24024 February 2023 Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release ML22223A0702022-07-28028 July 2022 Energysolutions, LLC, ES-LCR-CR-2017-0073, Survey Unit 010-101-C WTB Subfoundation ML20036C9792020-01-31031 January 2020 Boiling Water Reactor 10 CFR 50.59 / 10 CFR 72.48 Report of Changes, Tests, and Experiments ML18331A0292018-11-0808 November 2018 Enclosure 5 - Site Investigation Report ML19007A0322018-06-20020 June 2018 5299-SR-03 - LACBWR Confirmatory Survey Report ML19007A0402018-05-30030 May 2018 RS-TD-313196-001, Radionuclides of Concern During LACBWR Decommissioning, Rev 5 ML19007A0372018-05-28028 May 2018 LC-FS-TSD-002, Rev. 2, Operational Derived Concentration Guideline Levels for Final Status Survey. ML19007A0422018-05-28028 May 2018 RS-TD-313196-004, Rev. 4, LACBWR Soil Dcgl, Basement Concrete Dcgl & Buried Pipe Dcgl. ML19007A0342018-05-24024 May 2018 Hai LACBWR Site Investigation Work Plan ML19007A0362017-04-28028 April 2017 LC-FS-TSD-001, Use of Isocs for FSS of End State Sub Structures at Lacbwr. ML19007A0352016-03-23023 March 2016 LC-FS-PR-003 - Radiological Assessments Rass Rev 0 ML19007A0432015-11-23023 November 2015 RS-TD-313196-005, Rev. 0, LACBWR Open Air Demolition Limits. ML19007A0442015-10-0606 October 2015 RS-TD-313196-006 - Ludlum Model 44-10 Detector Sensitivity Rev 0 ML19007A0412015-09-29029 September 2015 RS-TD-313196-003, Rev. 0, LACBWR Historical Site Assessment. ML19007A0382015-07-16016 July 2015 LC-QA-LTP-PL-001, Quality Assurance Project Plan LACBWR License Termination Plan Development, Site Characterization and Final Radiation Survey Projects, Rev. 0 ML19007A0392015-06-10010 June 2015 PG-EO-313196-SV-PL-001, Rev. 1, Characterization Survey Plan for the Lacbwr. ML14330A2332014-11-18018 November 2014 Changes to LACBWR Controlled Document. Includes QAPD, Issue 27, Quality Assurance Program Description ML19007A2412014-10-13013 October 2014 TSD-14-006, Rev. 5, Conestoga-Rovers and Associates Report: Evaluation of Hydrogeological Parameters in Support of Zion Restoration Project. ML19007A0332014-10-0808 October 2014 GP-EO-313196-QA-PL-001 - LACBWR Characterization Qapp 2014 ML11363A1892011-12-15015 December 2011 Boiling Water Reactor - Results of Root Cause Analysis Performed for Non-Compliance with ODCM Requirement ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers 2024-01-25 |
Text
JeremyBrowning ChiefNuclearOfficer
3200EastAve.S.*POBox817*LaCrosse,WI546020817*6087871258*6087871420fax*www.dairylandpower.com DairylandPowerCooperativeisanequalopportunityproviderandemployer.
January25,2024
Inreply,pleaserefertoLAC14542
ATTN:DocumentControlDesk U.S.NuclearRegulatoryCommission Washington,D.C.205550001
SUBJECT:
LaCrosseBoilingWaterReactor
FacilityOperatingLicenseNo.DPR45
NRCDocketNos.50409and72046 LaCrosseBoilingWaterReactorSubmittal10CFR50.59and10CFR72.48Report ofChanges,Tests,andExperiments
DearSirorMadam:
Inaccordancewith10CFR50.59(d)(2)and10CFR72.48(d)(2),DairylandPowerCooperativeis providingareportsummarizingthe10CFR50.59and10CFR72.48evaluationsofchanges, tests,andexperimentsimplementedduringtheperiodfromDecember31,2021,toDecember 31,2023.
Theattachmentprovidesthebiennialreport.
Noregulatorycommitmentsarecontainedinthissubmittal.
Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMartyMoe,ISFSI ManageratMarty.Moe@DairylandPower.comor6087921745.
Respectfully,
JeremyBrowning VP/ChiefNuclearOfficer
DairylandPowerCooperative
JRB:MGM:tco
Enclosure
LAC14542 Page2of2
cc:
BernardWhite NRCProjectManager
TildaLui NRCProjectManager
JackGiessner RegionalAdministrator
YoiraDiazSanabria DivisionofFuelManagement
LAC14542 Attachment
LaCrosseBoilingWaterReactor10CFR50.59and10CFR72.48SummaryReport 10CFR50.59Evaluations Therewereno10CFR50.59evaluationsduringthereportingperiod.
10CFR72.48Evaluations Therewereno10CFR72.48evaluationsduringthereportingperiod.