LER 89-023-00:on 890613,main Control Room/Emergency Switchgear Room Chiller Found Inoperable Due to Degraded Performance.Caused by Low Refrigerant Charge.Chiller B Recharged & Administrative Control established.W/890712 Ltr
ML18153B816
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/12/1989
From: Kansler M
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-024, 89-24, LER-89-023, LER-89-23, NUDOCS 8907180457
Download: ML18153B816 (4)


Text

t*

VIRGINIA ELECTRIC ANO POWER COMPANY

- Surrv P_,

P.O. Box 3115 Station Surrv, Virginie 23883 July 12, 1989 U.S. Nuclear Regulatory Commission Serial No.: 89-024 Document Control Desk Docket Nos.: 50-280 016 Phillips Building 50-281 Washington, D.C. 20555 License Nos. DPR-32 DPR-37 Gentlemen:

Pursuant to Surry Power Station Technical Specifications, Virginia Electric and Power Company hereby submits the following Licensee Event Report for Units 1 and 2.

REPORT NUMBER 89-023-00 This report has been reviewed by the Station Nuclear Safety and Operating Committee and will b~ reviewed by Safety Evaluation and Control.

Very truly yours, Station Manager Enclosure cc: Regional Administrator Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323 s

PDR 890718 Ag~gz..._ osooo2eo 890712 -

PNU IE2;(

'I,

POW 28-06-01 NAC Fo,n, 31141 J.S. NUCLEAR REGULATORY COMMISSION l!MIJI APPROVED 0MB NO. 3160-011M EXPIRES: 8/311118 LICENSEE EVENT REPORT (LERI FACILITY NAME 11 l DOCKET NUMIIIEA (21 I PAGE 131 TITLE l'l Surrv Power Station. Units 1 and 2 !01s101010121s10 1i0Flo13 Main Control Room Chiller Inoperable Due to Low Refrigerant Charge EVENT DATE 1151 LEA NUMBER 16) REPORT DATE 171 OTHER FACILITIES INVOLVED (Iii)

MONTH DAY YEAR YEAR )} SE~~~~~~AL )?~~~':::~~ MONTH DAY YEAR FACILITY NAMES DOCKET NUMBERISI oI 6 11 3 s 9 s 19 - o I 2 13 - o Io 0 1 1 I 2 s l 9 1

OPERATING N THIii REPORT IS SUBMITTED PUAIIUANT TD THE AEQUIAEMENTII OF 10 CFA §: /Ch<<:k on* or mo,. of th* fo110.,,n11) 1111 MODE Ill _ _............---4 20.402(b)

I - 20.4Clll(cl

- l50.73(alf2lfM

- 73.71(b)

POWER 20.40ll(a111llll l50.3S(cll1l l50.73(alf2lM 73.71(cl LEVEL O I OI O -

1101 20.40111*11111111

-X S0.311(cll2l l50.73lalf2lMil OTHER /S,-:ify in A/J,.,.ct tMlaw *nd in T*1tr, NRC Form lliflll= -

20.40ll(all1 lfilil I0.731*112)(1) l50.73(alf2llwilllfA) 366A/

20.40ll(al11 lf1Yl 20.411111*111 JM -- S0.73(alf21Uil I0.73111lf2llllll LICENIIEE CONTACT FOR THIS LEA 1121 S0.73(alf2lfvlllllBl S0.731alf21h<l NAME TELEPHONE NUMBER AREA CODE M. R. Kansler, Station Manager 8 10 1 4 3 I s1 7 1- I 3 I 1 18 I 4 COMPLETE ONE LINE FOR EACK COMPONENT FAILURE DESCRIBED IN THIS REPORT 1131 MANUFAC* MANUFAC*

CAUSE SYSTEM COMPONENT TURER TUAER I I I I I I I I l I I I I I I I I I I I I I I I I I I 1


..-----*-----------l .-1.1,*:"":.::u"'.!TA* Air-!M"'q- C!lf,*CL..'TEu ii.:'

EXPECTED 1-M_o_N_T_H_D*. I n ...-~

~;~

SUBMISSION I l

1 YES (lfve,. =mplttl ., .. ,.., .. ;.~ .. _.,,.,,,ss,oN OATf:1 1X I Iii..,

DATE 1151 I I I I AUTAACT /Limit ID 1"10 - *

  • i.*.* *PPrD*im*toly fif. . .n 1int1l**-c* ry-imn /inn) 11111 On June 13, 1989 at 0949 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.610945e-4 months <br />, with Units 1 and 2 in cold shutdown, it was determined that the operating Main Control Room/Emergency Switchgear Room (MCR/ESGR) chiller (EIIS-CHU), l-VS-E-4B, was inoperable due to degraded performance caused by an improper valve lineup. At the time of the event, the 11 C11 chiller was operable and the "A" chiller was out of service. This condition is contrary to Technical Specification 3.14 which requires that one MCR/ESGR chiller be operating and another be operable whenever fuel is in the reactor core. Administrative controls have been established to ensure the chilled water and service water valves remain in the proper position.

NRC Forn, 31141 19-1131

U.I NUCLEAIII IIE.C.ULATOIIY COIIIIIIIIDIO"'

LICENSEE E . T REPORT (LERI TEXT CONTINU.N ..... ROVED 0MB *.: Jl 50-,01 -

flll'IRES 8/JI/&-

,,'ACILITY NAME 111 IDOCICET-Ell 12 LEII NUMaEII 16
  • 1111tvtS10""'

.l"ifUMllfD' Surry Power Station, Units 1 and 2 o ,s I o I o , o 1 2 1 s 1o Is 91-/ o 1 2 1 3 /-i o o : o : 2 ;o F/ o:3 TIXTI*--*- --NlfC-P'*ll17*

1 I 1.0 Description of the Event On June 13, 1989 at 0949 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.610945e-4 months <br />, with Units 1 and 2 in cold shutdown, it was determined that the operating Main Control Room/Emergency Switchgear Room (MCR/ESGR) chiller, l-VS-E-4B, was inoperable due to degraded performance. At the time of the event, the 11 c11 chiller was operable and the 11 A11 chiller was out of service. This condition is contrary to Technical Specification 3.14. It was determined that an improper valve lineup existed for the chilled water and service water systems for the 11 B11 chiller. This resulted in actuation of the refrigerant relief valve and degradation of chiller performance. The 11 c11 chiller was placed in operation at 1028 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91154e-4 months <br />. The 11 11 B chiller was recharged with its chilled water and service water flows properly balanced, and returned to service at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />.

2.0 Safety Consequences and Implications The MCR/ESGR air conditioning system consists of three air conditioning chiller units. The design temperature of the MCR/ESGR spaces is from 40 degrees Fahrenheit to 120 degrees Fahrenheit.

During this event, the MCR/ESGR air handling units remained operating, and there was no significant increase in ambient temperature of the MCR/ESGR areas.

Therefore, the health and safety of the public were not affected.

3.0 Cause Insufficient administrative control of the valve lineup for the chilled water and service water (SW)

(EIIS-BI) systems for the 11 B11 chiller was the cause of the event. This resulted in a flow imbalance that resulted in inefficient heat transfer between the two systems, overpressurizing the chiller's refrigerant.

This actuated the chiller's relief valve causing a loss of refrigerant and degradation of the chiller heat removal capability.

NIIC "OIIM-A II.al,

l N11c;-,.aeA IMJ U.I NUCLEAIII IIIUoULATD ..... c;oM*HDIO" LICEN~EE E.NT REPORT (LERI TEXT CONTINU.N &*~~OVEO 0MB , : J15,C-(l1*

fl!l'IRES Bill tB:-

I DOCKET NU1119EII 12 LIIII N~llll 16 PACiE '"

Surry Power Station, Units 1 and 2

.*.,Sf~~:.-;~-.*~ j j:~v.!~'~;:,  ! i o is Io Io Io I 2 1s I o j s 1 9 _j o 12 I 3 /_i o 1n : o i 3 loF[ op TEXTt*--*---N/fC-.. '*11'71 4.0 Immediate Corrective Action(s) 11 The C11 chiller was placed in operation at 1028 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91154e-4 months <br />.

5.0 Additional Corrective Action(s)

The 11 B11 chiller was recharged and its chilled water and service water flows were properly balanced. The 11 11 B chiller was returned to service at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />, and the c chiller was removed from operation and 11 11 maintained in an operable status at 1212 hours0.014 days <br />0.337 hours <br />0.002 weeks <br />4.61166e-4 months <br />.

6.0 Action(s) Taken to Prevent Recurrence Administrative controls have been established to ensure the valves remain in the proper position.

7.0 Similar Events None.

8.0 Manufacturer/Model Number(s)

N/A NIIIC .. O I I I M -

11.al,