IR 05000458/2018001

From kanterella
(Redirected from ML18128A246)
Jump to navigation Jump to search
NRC Integrated Inspection Report 05000458/2018001
ML18128A246
Person / Time
Site: River Bend 
Issue date: 05/08/2018
From: Jason Kozal
NRC/RGN-IV/DRP/RPB-C
To: Maguire W
Entergy Operations
Kozal J
References
IR 2018001
Download: ML18128A246 (33)


Text

May 8, 2018

SUBJECT:

RIVER BEND STATION - NRC INTEGRATED INSPECTION REPORT 05000458/2018001

Dear Mr. Maguire:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your River Bend Station, Unit 1. On April 25, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

One of these findings involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the River Bend Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jason W. Kozal, Chief Project Branch C Division of Reactor Projects

Docket No. 50-458 License No. NPF-47

Enclosure:

Inspection Report 05000458/2018001 w/ Attachments:

1. Documents Reviewed 2. O

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2018001

Enterprise Identifier: I-2018-001-0009

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

Saint Francisville, Louisiana

Inspection Dates:

January 1, 2018 to March 31, 2018.

Inspectors:

J. Sowa, Senior Resident Inspector

B. Parks, Resident Inspector

M. OBanion, Acting Resident Inspector

J. Drake, Senior Reactor Inspector

C. Young, Senior Project Engineer

L. Carson II, Senior Health Physicist

Approved By:

J. Kozal, Chief, Branch C

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at River Bend Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

Failure to Implement Procedure for Storage of Material in the Pools Cornerstone Significance Cross-cutting Aspect Report Section Occupational Radiation Safety Green NCV 05000458/2018001-01 Closed

[H.4] -

Human Performance,

Teamwork 71124.02 -

Occupational As Low As Reasonably Achievable (ALARA)

Planning and Controls The inspectors identified a non-cited violation of Technical Specification 5.4.1.a for the licensees failure to implement written procedures for activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, dated February 1978. Specifically, the licensee failed to implement radioactive material control Procedure ADM-0071, Fuel Pools Material Control,

Revision 8, for the storage and movement of spent Tri-Nuke filters.

Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000458/2018001-02 Closed

[H.5] -

Human Performance,

Work Management 71152 -

Problem Identification and Resolution The inspectors reviewed two examples of a self-revealed finding for the licensees installation of an incorrectly specified relay in 1) the control circuitry for the feedwater level control system and 2) the turbine generator voltage regulator circuitry. In each instance, the incorrectly specified relay failed in service, causing a plant transient and automatic reactor scram.

Additional Tracking Items

Type Issue number Title Report Section Status LER 05000458/2017-007-00 Automatic Reactor Scram Due to Failure of Main Generator Voltage Regulator Mode Transfer Relay 71153 Closed LER 05000458/2017-008-00 Automatic Reactor Scram Due to Failure of Main Feedwater Regulator Transfer Relay 71153 Closed

PLANT STATUS

River Bend Station began the inspection period at rated thermal power. On January 8, 2018, the unit was shut down for a planned maintenance outage. A reactor startup was performed on January 30, 2018. The unit was shut down to conduct a forced outage on February 1, 2018, due to an unexpected trip of the B reactor recirculation pump. A reactor startup was performed on February 9, 2018. The unit was shut down to conduct a forced outage on March 1, 2018, due to a pipe leak associated with the main condenser. A reactor startup was performed on March 6, 2018. The unit was returned to rated thermal power on March 20, 2018. The unit remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Division I residual heat removal system on January 25, 2018
(2) Division II residual heat removal system on January 25, 2018
(3) Control building heating, ventilation, and air conditioning (HVAC) system on March 15, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the standby service water system on March 8, 2018.

===71111.05AQFire Protection Annual/Quarterly

Quarterly Inspection===

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Residual heat removal pump A room, fire area AB-5 on January 25, 2018
(2) Residual heat removal pump B room, fire area AB-3 on January 25, 2018
(3) Standby service water pump A room, fire area PH-1/Z-1on March 12, 2018
(4) Standby service water pump B room, fire area PH-2/Z-1 on March 12, 2018

71111.06Flood Protection Measures Internal Flooding

The inspectors evaluated internal flooding mitigation protections in the standby service water pump rooms, SW-01 on January 12, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Electrical manhole 1EMH607 on January 16, 2018
(2) Electrical manhole 1EMH613 on January 16, 2018

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated licensed operator requalification training on February 6, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated the operators performance during a plant shutdown for a planned maintenance outage on January 7, 2018.

===71111.12Maintenance Effectiveness

Routine Maintenance Effectiveness===

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Functional failure review of standby service water on January 16, 2018
(2) Functional failure review of the 120 VAC system on February 19, 2018
(3) Functional failure review of the reactor recirculation system associated with the failure of the B recirculation pump to upshift to fast speed on March 1, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Yellow shutdown risk condition with containment access hatch open on January 8, 2018
(2) Yellow risk condition due to fuel movement and Division III emergency diesel generator inoperability while in Mode 5 on January 24, 2018
(3) Yellow risk condition due to high pressure core spray pump inoperability during remote shutdown panel surveillance testing on February 23, 2018
(4) Yellow risk condition due to residual heat removal pump B discharge flow inoperability during maintenance and testing on March 15, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) E31-N604F main steam line tunnel temperature exceeded allowable values per surveillance test requirements on January 3, 2018
(2) Jacket water leaks associated with Division I emergency diesel generator on January 5, 2018
(3) Unexpected system response during Division II standby service water surveillance testing on January 15, 2018
(4) Residual heat removal shutdown cooling outboard isolation valve E12-MOVF008 over-torqued on February 19, 2018
(5) Division I inverter DNB-INV01A1 system output voltage exceeded max allowable voltage on March 20, 2018

71111.18Plant Modifications

The inspectors evaluated the following permanent modification:

(1) Division I standby diesel generator exhaust manifold piping to eliminate a vulnerability to flaw formation and leakage after Division I emergency diesel generator shroud replacement on January 19, 2018

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) STP-209-6310, Revision 39, RCIC Pump and Valve Quarterly Operability and Flow Test, following maintenance on the reactor core isolation cooling governor valve on January 5, 2018
(2) STP-504-4504, Revision 18, RPS/Control Rod Block - IRM D Channel Functional Test and LSFT, following replacement of intermediate range monitor D control relay H13-P672-Z2K18 on January 13, 2018
(3) STP-309-0206, Revision 29, Division I Diesel Generator 184 Day Operability Test, following maintenance on Division I emergency diesel generator on January 22, 2018
(4) STP-309-0203, Revision 329, Division III Diesel Generator Operability Test, following replacement of the Division III emergency diesel generator voltage regulator on January 24, 2018
(5) STP-504-4503, Revision 20, RPS/Control Rod Block - IRM C Channel Functional Test and LSFT, following maintenance on intermediate range monitor C on January 30, 2018
(6) SOP-0030, Revision 33, High Pressure Core Spray System (Sys 203), following maintenance on high pressure core spray motor supply breaker on February 22, 2018
(7) STP-256-6603, Revision 21, Division I Standby Service Water Quarterly Valve Operability Test, following maintenance and repairs to standby service water valve SWP-MOV96A on March 5, 2018

71111.20Refueling and Other Outage Activities

(1) The inspectors evaluated a planned maintenance outage implemented to remove damaged fuel assemblies. Inspection activities occurred from January 8, 2018, to January 31, 2018.
(2) The inspectors evaluated forced outage activities from February 1, 2018, to February 9, 2018. The forced outage occurred due to a failure of the B reactor recirculation pump to shift to fast speed. Station personnel conducted a forced outage and replaced the 13.8 kV transformer associated with the B reactor recirculation pump.
(3) The inspectors evaluated forced outage activities from March 1, 2018, to March 7, 2018. The forced outage occurred due to a leak from a crack on piping associated with the main condenser. Station personnel conducted a forced outage and repaired the leak.

===71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine===

(1) STP-203-1302, Revision 25, E22-S001BAT Quarterly Surveillance, on January 18, 2018
(2) STP-057-3801, Revision 012, Containment Equipment Hatch Leak Rate Test, on January 27, 2018
(3) OSP-0604, Revision 2, Remote Shutdown System Control Circuit Operability Test, on February 26, 2018

In-service (2 Samples)

(1) STP-204-1300, Revision 18, LPCI Pump A Start Time Delay Channel Calibration and Channel Functional Test, on January 2, 2018
(2) STP-256-6301, Revision 23, Division I Standby Service Water Quarterly Valve Operability Test, on January 6, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) STP-000-0001, Revision 082, Daily Operating Logs, on January 4, 2018

Containment Isolation Valve (1 Sample)

(1) STP-057-7705, Revision 012, Primary Containment Airlocks Seal Leakage Rate Test, on January 28, 2018

===71114.06Drill Evaluation

Drill/Training Evolution===

The inspectors evaluated a simulator-based emergency preparedness drill on March 13,

RADIATION SAFETY

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 2017-1220, Pre/Post Outage Prep Including Support
(2) RWP 2017-1296, RWCU Pump Replacement and Support Activities
(3) RWP 2017-1426, Motor Operated Valve and In-Vessel Testing
(4) RWP 2017-1436, Installation/Removal of Temporary Installation Main Steam Tunnel
(5) RWP 2017-1753, RWCU Hx Room Flow Accelerated Corrosion (FAC) Piping Replacement
(6) RWP 2017-1800, RF-19 Refuel Floor Outage Activities
(7) RWP 2018-1327, Separator Repair Following SHZAM Bolt Disengagement

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:

(1) RWP 2017-1220, Pre/Post Outage Prep Including Support
(2) RWP 2017-1296, RWCU Pump Replacement and Support Activities
(3) RWP 2017-1426, Motor Operated Valve and In-Vessel Testing
(4) RWP 2017-1436, Installation/Removal of Temporary Installation Main Steam Tunnel
(5) RWP 2017-1753, RWCU HX Room FAC Piping Replacement
(6) RWP 2017-1800, RF-19 Refuel Floor Outage Activities
(7) RWP 2018-1327, Separator Repair Following SHZAM Bolt Disengagement

Radiation Worker Performance (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (01/01/2017 - 12/31/2017)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (01/01/2017 - 12/31/2017)
(3) IE04: Unplanned Scrams with Complications (USwC) Sample (01/01/2017 - 12/31/2017)

71152Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:

(1) Relay failures in the feedwater level control system and the turbine generator voltage regulator control system resulted in reactor scrams

71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports

The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Report 05000458/2017-007-00, Automatic Reactor Scram Due to Failure of Main Generator Voltage Regulator Mode Transfer Relay on August 21, 2017
(2) Licensee Event Report 05000458/2017-008-00, Automatic Reactor Scram Due to Failure of Main Feedwater Regulator Transfer Relay on October 12,

INSPECTION RESULTS

Failure to Implement Procedure for Storage of Material in the Pools Cornerstone Significance Cross-cutting Aspect Report Section Occupational Radiation Safety Green NCV 05000458/2018001-01 Closed

[H.4] - Human Performance, Teamwork

71124.02 - Occupational

As Low As Reasonably Achievable (ALARA)

Planning and Controls The inspector identified a non-cited violation of Technical Specification 5.4.1.a, for the licensees failure to implement written procedures for activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, dated February 1978. Specifically, the licensee failed to implement radioactive material control Procedure ADM-0071, Fuel Pools Material Control, Revision 8, for the storage and movement of spent Tri-Nuke filters.

Description:

The inspector reviewed condition reports (CRs) that documented incidents associated with the movement and storage of highly radioactive materials in the various pools at River Bend Station (RBS) in 2017. Four radiological occurrences involved unplanned and unanticipated movements of spent Tri-Nuke filters around the separator and upper inclined fuel transfer storage (IFTS) pools.

  • January 5, 2017, CR-RBS-2017-0100: Radiation Protection (RP) was notified that a spent Tri-Nuke filter was found floating on the surface of the separator pool.

Surveys of the filter and surrounding area were performed by RP technicians.

Dose rates on the filter measured 2.2 Roentgen/hour (R/hr) on contact and 0.85 R/hr at 30 centimeters (cm).

  • April 3, 2017, CR-RBS-2017-03011: A used Tri-Nuke filter measuring 1.3 R/hr and 0.350 R/hr at 30 cm was discovered floating in the reactor building (RB)-186 separator pool.
  • April 24, 2017, CR-RBS-2017-03424: While performing video surveillance of the refueling pool on RB-186, a Tri-Nuke filter was discovered floating on the surface of the separator pool. The filter had a dose rate of 11 R/hr on contact and 6 R/hr at 30 cm.
  • During the week of April 27, 2017, the licensee transferred the 30 Tri-Nuke filters from the separator pool to the IFTS. However, one of the Tri-Nuke filters (0.300 R/hr) had been damaged when falling into the bottom of the IFTS pool. It was eventually recovered and stored.

The inspector examined the circumstances that caused the Tri-Nuke filters to become buoyant and float around the separator pool resulting in unintended radiological hazards. Two CRs from 2015 (CR-RBS-2015-07893 and CR-RBS-2015-08050) identified concerns with air intrusion from a leaky spent fuel cooling system valve. Also, two CRs from 2017 (CR-RBS-2017-01881 and CR-RBS-2017-03424) identified that the leaky valve caused spent Tri-Nuke filters to float. The licensee eventually determined the solution to the problem was to transfer the spent Tri-Nuke filters to the upper IFTS pool. However, the inspector determined that the licensee was not supposed to leave the spent Tri-Nukes in the separator and upper IFTS pools unless designed storage racks were in place or an engineering change request (ECR) evaluation allowed the practice.

The movement and storage of radioactive material in and around the pools at RBS are implemented through the following procedures:

  • EN-RP-121, Revision 13, Radioactive Material Control
  • EN-RP-123, Revision 1, Radiological Controls of Highly Radioactive Objects
  • ADM-0071, Revision 8, Fuel Pools Material Control

The inspector determined that the purpose of Entergy Corporate Procedures EN-RP-121 and EN-RP-123 was to prevent the unauthorized movement and removal of radioactive materials around the site and from pools. These procedures required that licensee personnel receive proper authorization from reactor engineering and radiation protection management for movement and storage of radioactive materials in pools and the around pools. Based on the documents and procedures reviewed by the inspector, the licensee did not specify storage requirements or equipment for these filters to prevent them from floating to the top of the pools and becoming radiological hazards.

The inspector reviewed RBS site-specific Procedure ADM-0071, Revision 8, which described the requirements established for the control of miscellaneous material stored in fuel pools. At RBS, radioactive materials are stored in the following seven pools: spent fuel pool, cask pool, lower IFTS, upper IFTS, upper containment pool, dryer storage pool, and separator pool.

ECR RBS-ER-97-504, Fuel Pool Inventory Identification, Justification, and Evaluation, dated September 30, 1997, stated that the purpose of ADM-0071 was to provide a means to adequately control, regulate, and inventory non-special nuclear material stored in the spent fuel pool and upper containment pools. Items may not be stored in the spent fuel storage upper containment pools, which includes the separator pool, without design engineering approval. Additionally, items that are not stainless steel or in a stainless steel container are not to be stored without being verified radiation resistant and not detrimental to the fuel pool water quality.

Section 7.3 of Procedure ADM-0071 provided instructions for storing or moving material within the same pool or to another pool location. Section 7.3.7 required that the pool material inventory POOL MATERIAL CONTROL FORM be completed and updated after approval of the material storage/move by the reactor engineering manager and radiation protection superintendent. The form required specific information about proposed items to be stored, such as the radiation surveys taken, work order used, storage container location, special requirements, radiation exposure duration, and applicable ECR evaluations. At the time of this inspection, the licensee did not have any pool material control forms completed for the 30 Tri-Nuke filters that were placed into the separator pool and subsequently transferred to the IFTS in 2017. In particular, there was no pool material control forms signed by the reactor engineering manager and radiation protection superintendent approving the proper storage and movement of these Tri-Nuke filters for either location.

Procedure ADM-0071 allowed miscellaneous items such as Tri-Nuke filters to be stored in the separator and IFTS pools if an ECR evaluation and engineering approval on the storage method were done. The inspector queried whether any ECRs had been performed for storage of the Tri-Nuke filters. Only two were available for the inspectors review. The two ECRs (ECR RBS-ER-97-504 and ECR 33163) revealed that the licensee had not made specific provisions or performed evaluations for the storage of Tri-Nuke filters in the separator or upper IFTS pools.

The inspector determined that licensees procedures did not adequately address securing highly radioactive material in pools such as Tri-Nuke filters to prevent radioactive material from floating to the pool surface and thereby becoming radiation hazards to personnel, as had occurred three times in early 2017. Further, the failure to follow the requirements of Procedure ADM-0071 resulted in bypassing the performance of an evaluation to ensure proper movement and storage of the filters.

Corrective Actions: Immediate safety concerns with filters becoming buoyant due to the air intrusion in the separator pool were addressed when the licensee transferred the 30 Tri-Nuke filters to the IFTS pool in late April 2017. Procedure compliance issues are being addressed through an action item in CR-RBS-2018-00523.

Corrective Action References: CR-RBS-2018-00523

Performance Assessment:

Performance Deficiency: The licensees failure to implement written procedures for activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, dated February 1978, as required by Technical Specification 5.4.1.a, was a performance deficiency. Specifically, the licensee failed to implement radioactive material control Procedure ADM-0071, Fuel Pools Material Control, Revision 8, for the storage and movement of spent Tri-Nuke filters.

Screening: The performance deficiency was more than minor because it adversely affected the programs and process (exposure control) attribute of the Occupational Radiation Safety Cornerstone and its objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material. Specifically, allowing highly radioactive material (Tri-Nuke filters) to be moved and stored in an unsafe, unevaluated, unapproved manner resulted in unanticipated dose rates and unplanned worker exposures to radiation.

Significance: The inspectors assessed the significance of the finding using NRC Inspection Manual Chapter 0609, Appendix, C, Occupational Radiation Safety Significance Determination Process, and determined that the finding was of very low safety significance (Green) because it did not:

(1) involve ALARA planning or work controls,
(2) did not involve an overexposure,
(3) did not have a substantial potential to be an overexposure, and
(4) the ability to assess dose was not compromised.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance, associated with teamwork, because individuals and work groups failed to communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety was maintained. Specifically, the communication and coordination of activities between construction projects, health physics, and nuclear engineering failed to prevent radiological issues associated with the storage and movement of Tri-Nuke filters.

Enforcement:

Violation: Technical Specification 5.4.1.a requires, in part, that procedures be written, implemented, and established for those areas recommended in Regulatory Guide 1.33, Appendix A, Revision 2, 1978. Section 7(b) of Regulatory Guide 1.33, Appendix A, requires procedures for control of radioactive materials to minimize potential releases to the environment and control personnel exposure associated with solid radioactive waste.

Licensee Procedure ADM-0071, Fuel Pools Material Control, Revision 8, Section 7.1, requires that if material must be stored in a pool or previously stored material must be moved from one pool to a different pool or to a different area in the same pool, Section 7.3 must be completed. Section 7.3.7 requires that the pool material inventory POOL MATERIAL CONTROL FORM be updated after approval of the material storage/move by the reactor engineering manager and radiation protection superintendent.

Contrary to the above, beginning in 2017 and to present, the licensee stored material in a pool and moved previously stored material from one pool to a separate pool without completing Section 7.3 of Procedure ADM-0071. Specifically, the licensee stored 30 Tri-Nuke filters in the separator pool without completing the pool material Inventory form and, in April 2017, moved the filters to the incline fuel transfer storage pool without completing/

updating a pool material Inventory POOL MATERIAL CONTROL FORM and obtaining the required approvals.

As of January 26, 2018, the licensee had not fully implemented Section 7.3 of Procedure ADM-0071 by updating the form and obtaining written approval from the radiation protection superintendent and reactor engineering manager for the movement and safe storage of the 30 Tri-Nuke filters in the incline fuel transfer storage pool.

Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the NRC Enforcement Policy.

Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram Cornerstone Significance Cross-cutting Aspect Report Section Initiating Events Green FIN 05000458/2018001-02 Closed

[H.5] - Human Performance, Work Management

71152 - Problem

Identification and Resolution The inspectors reviewed two examples of a self-revealed finding for the licensees installation of an incorrectly specified relay in 1) the control circuitry for the feedwater level control system and 2) the turbine generator voltage regulator circuitry. In each instance, the incorrectly specified relay failed in service, causing a plant transient and automatic reactor scram.

Description:

Example 1: On August 18, 2017, with the plant operating at 100 percent power, an automatic scram occurred. At the time of the scram, operators were performing a scheduled surveillance test that called for a planned shift of the controlling channel of the feedwater level control system from channel B to channel A. Immediately after the shift, feedwater regulating valves went full open and recirculation pumps downshifted to slow speed. The combination of these events caused an automatic scram to occur on high flow-biased thermal power.

The cause of the scram was a failure of the feedwater level select relay, C33A-K12. The failure of this relay caused the interpreted level in the feedwater level control system to go to zero, which in turn caused a full open demand on the feedwater regulating valves and a downshift of recirculation pumps from fast to slow speed on a perceived low level condition in the reactor vessel.

A subsequent investigation determined that the feedwater level select relay failed due to a degradation in the electrical contacts on the relay. The degradation caused a sharp increase in resistance across the contacts, which in turn led to a substantial reduction in the current passing through these contacts to the rest of the feedwater level control circuit. With the current substantially reduced, the circuit incorrectly perceived a low vessel level condition.

The failed relay was a General Electric Agastat GPI type relay. Operating experience at River Bend Station and at other sites in the industry has established that this type of relay is prone to intermittent failure. When used in low current applications such as those associated with the feedwater level control circuit, there is a potential for oxidation to build up on the contacts of the relay, which will create resistance across the relay and impair its ability to pass current. In light of this operating experience, the licensee issued part interchangeability evaluation (PIE) 411 in March 1993. PIE 411 called for a GPIA type relay with gold-plated contacts to be used for C33A-K12 in lieu of the silver-plated GPI type relay that had traditionally been used.

The inspectors determined that PIE-411 was a self-imposed licensee standard. The licensee complied with this standard until February 2017, when the gold-plated relay installed in the system was incorrectly replaced with a silver-plated relay. Given that the silver-plated relay was being used in a low current application, it built up resistance over time and eventually failed, causing the scram.

Example 2: On June 23, 2017, with the plant operating at 100 percent power, an automatic scram occurred. At the time of the scram, operators were performing a scheduled surveillance test that called for a planned shift of the turbine generator voltage regulator control from automatic to manual. Immediately after the shift, the main generator tripped which caused a subsequent reactor scram.

The cause of the scram was a failure of the voltage regulator transfer circuit relay, EXS-PNL1-43A. The failure of this relay caused an open circuit in both the manual and automatic voltage regulators and complete loss of control of the Alterrex Excitation System.

When neither the manual nor the automatic voltage regulator is connected to the Alterrex Excitation System, there is no excitation field applied. The result is a turbine trip on loss of excitation.

A subsequent investigation determined that the main generator voltage regulator mode transfer relay failed due to a degradation in the electrical contacts on the relay. The degradation caused a sharp increase in resistance across the contacts, which in turn led to a substantial reduction in the current passing through these contacts to the rest of the voltage regulator control circuit. With the current substantially reduced, the circuit could not be completed for either the manual or automatic control system of the turbine voltage regulator.

The failed relay was a General Electric DC operated 4-pole double throw miniature 43A relay provided as part of the turbine generator package and is part of the Alterrex exciter transfer panel assembly. Operating experience at River Bend Station and at other sites in the industry has established that this type of relay is prone to intermittent failure. The station generated engineering change 40442 in 2012 to replace the 43A relay with a different model documenting obsolescence of this relay as well as operating experience related to intermittent failures of this type of relay. In light of this operating experience, the licensee cancelled engineering change 40442 for unknown reasons and did not replace the 43A relay with a different style.

Corrective Actions: The licensee installed the correctly specified relay in the feedwater level control system and an upgraded vendor recommended relay in the turbine voltage regulator control system. The licensee also completed an extent of condition review on similar relays.

Corrective Action References: Condition Reports CR-RBS-2017-06118 and CR-RBS-2017-04961

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees installation of an incorrectly specified relay in 1) the control circuitry for the feedwater level control system and 2) the control circuitry for the main generator voltage regulator were two examples of a performance deficiency.

Screening: The performance deficiency was more than minor, and therefore a finding, because it was associated with the equipment performance attribute of the Initiating Events Cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations.

Significance: The inspectors assessed the significance of the finding using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process for Findings At-Power. The finding was determined to be of very low safety significance (Green) because the finding did not contribute to both the likelihood of a reactor trip and the likelihood that mitigating equipment would not be available.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with work management because the licensee failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 26, 2018, the inspectors presented the radiation safety inspection results to Mr. W. Maguire, Site Vice President, and other members of the licensee staff.

On April 25, 2018, the inspectors presented the quarterly resident inspector inspection results to Mr. W. Maguire, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.04 - Equipment Alignment

Condition Reports (CR-RBS-)

2017-05292

2017-07460

2017-07880

2018-00615

2018-00992

Drawings

Number

Title

Revision

PID-09-10E

Engineering P&I Diagram, System 256, Service

Water - Standby

PID-22-09A

Engineering P&I Diagram, System 402, HVAC -

Control Building

Procedures

Number

Title

Revision

R-STM-0118

Service Water Systems

R-STM-0402

HVAC - Control Building and Diesel Generator

Building

SOP-0031

Residual Heat Removal

338

SOP-0042

Standby Service Water System (Sys #256)

SOP-0058

Control Building HVAC System (Sys #402)

71111.05 - Fire Protection

Procedures

Number

Title

Revision

AB-070-502

RHR Pump A Room, Fire Area AB-5

AB-070-505

RHR Pump B Room, Fire Area AB-3

EN-DC-161

Control of Combustibles

SP-118-450

Standby Cooling Pump A Room, Fire Area PH-1/Z-1 3

SP-118-451

Standby Cooling Pump B Room, Fire Area PH-2/Z-1 3

STP-250-4533

FPM-PNL6 Fire Detection Channel Functional and

Operational Tests for Zone SD72, SD73, and SD89

(A&B)

71111.06 - Flood Protection Measures

Condition Reports (CR-RBS-)

2018-00200

2018-00367

2018-00369

Procedure

Number

Title

Revision

PN-317

Max Flood Elevations for Moderate Energy Line

Cracks in Cat I Structures

Work Orders

0052802383

0052802384

71111.11 - Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

GOP-0002

Power Decrease/Plant Shutdown

078

RSMS-OPS-HIT1

Licensed Operator Requalification

71111.12 - Maintenance Effectiveness

Condition Reports (CR-RBS-)

2017-00629

2017-01579

2017-01668

2017-01703

2017-01739

2017-01748

2017-01749

2017-03871

2017-04048

2017-04514

2017-05273

2017-05939

2017-06767

2017-06977

2017-06998

2017-07017

2017-07200

2017-07410

2017-07454

2017-07820

2017-07880

2017-07950

2018-00825

2018-01363

Procedures

Number

Title

Revision

EN-DC-203

Maintenance Rule Program

EN-DC-204

Maintenance Rule Scope and Basis

EN-DC-205

Maintenance Rule Monitoring

EN-DC-206

Maintenance Rule (A)(1) Process

Procedures

Number

Title

Revision

SOP-0042

Standby Service Water System (Sys #256)

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Condition Report (CR-RBS-)

2018-00505

Procedures

Number

Title

Revision

ADM-0096

Risk Management Program Implementation and

On-Line Maintenance Risk Assessment

26

EN-WM-104

On Line Risk Assessment

OSP-0037

Shutdown Operations Protection Plan (SOPP)

036

71111.15 - Operability Determinations and Functionality Assessments

Condition Reports (CR-RBS-)

2016-05866

2017-04048

2017-04097

2017-04302

2017-05033

2017-07111

2017-07162

2017-07199

2017-07219

2017-07532

2017-08048

2018-00194

2018-00402

Miscellaneous

Number

Title

Revision

EC 66261

SWP-SOV523B Reasonable Expectation of

Operability Input for CR-RBS-2016-05866

Procedures

Number

Title

Revision

OSP-0028

Log Report - Normal Switchgear, Control, and

Diesel Generator Buildings

108

STP-000-0001

Daily Operating Logs

STP-256-6608

Division II Standby Service Water 2 Year Position

Indication Verification Test

STP-309-0201

Division I Diesel Generator Operability Test

71111.18 - Plant Modifications

Calculation

Number

Title

Revision

G13.18.2.4-108

LPI, Inc. Evaluation of Standby Diesel Generator

Exhaust Manifold Stiffeners

Condition Reports (CR-RBS-)

2015-04817

2016-06841

2016-07753

2017-07111

2017-07532

2017-08048

Drawing

Number

Title

Revision

PID-08-09B

Engineering P&I Diagram System 309 Diesel

Generator

Procedure

Number

Title

Revision

SOP-0053

Standby Diesel Generator and Auxiliaries

(Sys #309)

057

Work Order 228397

71111.19 - Post-Maintenance Testing

Condition Reports (CR-RBS-)

2017-07237

2017-07728

Miscellaneous

Number

Title

Revision/Date

E22-S004 ACB2

Vendor Overhaul Breaker

Work Orders

00469400

00476322

00479296

Procedures

Number

Title

Revision

CMP-EM-203-1001

Inspection and Maintenance of 4.16 KV

Magne-Blast Circuit Breakers

STP-209-0201

RCIC Discharge Piping Fill and Valve Lineup

Verification

Work Orders

228397

00478865

00492550

00493155

00493741

2650988

2769345

2779858

71111.20 - Refueling and Other Outage Activities

Procedures

Number

Title

Revision

GOP-0001

Plant Startup

099

GOP-0002

Power Decrease/Plant Shutdown

078

71111.22 - Surveillance Testing

Condition Reports (CR-RBS-)

2015-02736

2018-00290

Drawing

Number

Title

Revision

GE-828E534AA

Elementary Diagram Residual Heat Removal

Sheet 8

Procedures

Number

Title

Revision

SOP-0018

Normal Service Water System

SOP-0042

Standby Service Water System

Work Orders

00492725

2785880

2787021

71114.06 - Drill Evaluation

Miscellaneous

Number

Title

Revision

RDRL-EP-1201

Site Drill Scenario

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and

Controls

Audits and Self-Assessments

Number

Title

Date

LO-RLO-2017-0055

Pre-NRC Self-Assessment Radiation Safety -

IP 71124.02

December 4, 2017

LO-RLO-2016-0145

Pre-NRC Self-Assessment Radiation Safety -

IP 71124.02

January 17, 2017

Condition Reports (CR-RBS-)

2015-07893

2015-08050

2017-00100

2017-00707

2017-00868

2017-01250

2017-01355

2017-01731

2017-01881

2017-01927

2017-03011

2017-03237

2017-03266

2017-03424

2017-03598

2017-03788

2017-04856

2017-04941

2017-05499

2017-01372

2017-01422

Miscellaneous

Number

Title

Date

RF-19 Water Movement Plan

January 2017

CFR Part 20.1101(c) Report for 2016

June 2017

ADM-0071

Post Material Inventory Report Post RF-19

May 31, 2017

WO 473593

Relocate Tri-Nuke filters from the Separator Pool

the IFTS

April 11, 2017

Procedures

Number

Title

Revision

ADM-0071

Fuel Pools Material Control

EN-RP-100

Radiation Worker Expectations

EN-RP-101

Access Control for Radiologically Controlled Areas

Procedures

Number

Title

Revision

EN-RP-102

Radiological Control

EN-RP-105

Radiological Work Permits

EN-RP-106

Radiological Survey Documentation

EN-RP-108

Radiation Protection Posting

EN-RP-109

Hot Spot Program

EN-RP-110

ALARA Program

EN-RP-110-03

Collective Radiation Exposure (CRE) Guidelines

EN-RP-110-04

Radiation Protection Risk Assessment Process

EN-RP-110-06

Outage Dose Estimating and Tracking

EN-RP-115-01

BRAC Survey Instructions

EN-RP-121

Radioactive Material Control

EN-RP-123

Radiological Controls for Highly Radioactive

Objects

EN-RP-143

Source Control

EN-RP-151

Radiological Diving

GMP-0111

Tri-Nuclear Filter Operations

Radiation Surveys

Number

Title

Date

RBS-1701-0042

RB +186 Upper Pool HCA Handrail

January 5, 2017

RBS-1703-0124

RB +186 Upper Pool and Carousel Area

March 5, 2017

RBS-1704-0059

RB +186 Upper Pool 354 R/hr. Tri-Nuke Filter

April 5, 2017

RBS-1704-0248

RB +186 Upper Pool 11 R/hr. Tri-Nuke Filter

April 21, 2017

RBS-1704-0303

RB +186 Upper Pool 24 Tri-Nuke Filters

April 21, 2017

Radiation Work Permits/ALARA Reviews

Number

Title

Revision

2017-1220

Pre/Post Outage Prep Including Support

2017-1296

RWCU Pump Replacement and Support Activities

2017-1426

Motor Operated Valve and In-Vessel Testing

Radiation Work Permits/ALARA Reviews

Number

Title

Revision

2017-1436

Installation/Removal of Temporary Installation Main

Steam Tunnel

2017-1753

RWCU HX Room FAC Piping Replacement

2017-1800

RF-19 Refuel Floor Outage Activities

2018-1327

Separator Repair Following SHZAM Bolt

Disengagement

71124.04 - Occupational Dose Assessment

Audits and Self-Assessments

Number

Title

Date

LO-RBS-2017-00055 Pre-NRC Assessment IP71124.04

Occupational Dose

October 27, 2017

Condition Reports (CR-RBS-)

2016-05858

2017-08105

2017-00707

2017-00868

2017-00910

2017-03788

2017-05176

2017-05489

Miscellaneous

Number

Title

Date

2017

Multi-Pack TLD Results

2017

2018

NVLAP Accreditation Report

2018

Procedures

Number

Title

Revision

EN-RP-131

Air Sampling

EN-RP-201

Dosimetry Administration

EN-RP-202

Personnel Monitoring

EN-RP-203

Dose Assessment

EN-RP-204

Special Monitoring Requirements

EN-RP-205

Prenatal Monitoring

EN-RP-206

Dosimeter of Legal Record QA

EN-RP-208

Whole Body Counting / In-Vitro Bioassay

Procedures

Number

Title

Revision

EN-RP-311

Electronic Alarming Dosimeter

EN-RP-317-09

Electronic Alarming Dosimeter Calibration

Self-Reading Dosimeter Calibration Records

Number

Title

Date

2017-B2-28-

CALDAT-05667

Self-Reading Dosimeter

September 18, 2017

2017-B2-28-

CALDAT-05713

Self-Reading Dosimeter

September 30, 2017

2017-B2-28-

CALDAT-05736

Self-Reading Dosimeter

September 30, 2017

2017-B2-28-

CALDAT-05836

Self-Reading Dosimeter

September 26, 2017

2017-B2-28-

CALDAT-06692

Self-Reading Dosimeter

December 15, 2017

71151 - Performance Indicator Verification

Procedures

Number

Title

Revision

EN-LI-114

Performance Indicator Process

NEI 99-02

Regulatory Assessment Performance Indicator

Guideline

71152 - Problem Identification and Resolution

Condition Reports (CR-RBS-)

2017-06118

2017-04961

71153 - Follow-up of Events and Notices of Enforcement Discretion

Condition Report (CR-RBS-)

2017-06118

Miscellaneous

Number

Title

Revision

PIE-411

Part Interchangeability Evaluation 411

Procedure

Number

Title

Revision

EN-MA-101

Conduct of Maintenance

Work Order 00441196

The following items are requested for the

Occupational Radiation Safety Inspection

at River Bend Station

January 22-25, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 12, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

Louis.Carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of last inspection:

January 21, 2016

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional specific procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit (RWP) Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address RWP violations, electronic dosimeter

alarms, and RWP dose estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection:

January 21, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D.

Procedure indexes for the following areas:

1. Occupational Dose Assessment

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of positive whole body counts since date of last inspection, names redacted if

desired

H.

Part 61 analyses/scaling factors

I.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18128A246

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: CHY/rdr

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/C

RI:DRP/C

ARI:DRP/C

SPE:DRP/C

C:DRS/EB1

C:DRS/EB2

NAME

JSowa

BParks

MOBanion

CYoung

TFarnholtz

JDrake

SIGNATURE

/RA/

/RA/

/RA-E/

/RA/

/RA/

/RA/

DATE

4/23/18

4/30/18

4/24/18

4/27/18

4/23/18

4/23/18

OFFICE

C:DRS/OB

C:DRS/PSB2

TL:IPAT

BC:DRP/C

NAME

VGaddy

HGepford

GGeorge

JKozal

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE

4/14/18

4/23/18

4/24/18

5/08/18

May 8, 2018

Mr. William

F. Maguire, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NRC INTEGRATED INSPECTION

REPORT 05000458/2018001

Dear Mr. Maguire:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your River Bend Station, Unit 1. On April 25, 2018, the NRC inspectors discussed the results

of this inspection with you and other members of your staff. The results of this inspection are

documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

One of these findings involved a violation of NRC requirements. The NRC is treating this

violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement

Policy.

If you contest the violation or significance of the NCV, you should provide a response within

days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the

NRC resident inspector at the River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the

U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the

NRC resident inspector at the River Bend Station.

W. Maguire

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Jason

W. Kozal, Chief

Project Branch C

Division of Reactor Projects

Docket No. 50-458

License No. NPF-47

Enclosure:

Inspection Report 05000458/2018001

w/ Attachments:

1. Documents Reviewed

2. Occupational Radiation Safety Inspection

Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2018001

Enterprise Identifier: I-2018-001-0009

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

Saint Francisville, Louisiana

Inspection Dates:

January 1, 2018 to March 31, 2018.

Inspectors:

J. Sowa, Senior Resident Inspector
B. Parks, Resident Inspector
M. OBanion, Acting Resident Inspector
J. Drake, Senior Reactor Inspector
C. Young, Senior Project Engineer
L. Carson II, Senior Health Physicist

Approved By:

J. Kozal, Chief, Branch C

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at River Bend Station in accordance with

the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and

violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

Failure to Implement Procedure for Storage of Material in the Pools

Cornerstone

Significance

Cross-cutting

Aspect

Report

Section

Occupational

Radiation

Safety

Green

NCV 05000458/2018001-01

Closed

[H.4] -

Human

Performance,

Teamwork

71124.02 -

Occupational

As Low As

Reasonably

Achievable

(ALARA)

Planning and

Controls

The inspectors identified a non-cited violation of Technical Specification 5.4.1.a for the

licensees failure to implement written procedures for activities referenced in Appendix A of

Regulatory Guide 1.33, Revision 2, dated February 1978. Specifically, the licensee failed to

implement radioactive material control Procedure ADM-0071, Fuel Pools Material Control,

Revision 8, for the storage and movement of spent Tri-Nuke filters.

Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram

Cornerstone

Significance

Cross-cutting

Aspect

Report

Section

Initiating

Events

Green

FIN 05000458/2018001-02

Closed

[H.5] -

Human

Performance,

Work

Management

71152 -

Problem

Identification

and

Resolution

The inspectors reviewed two examples of a self-revealed finding for the licensees installation

of an incorrectly specified relay in 1) the control circuitry for the feedwater level control system

and 2) the turbine generator voltage regulator circuitry. In each instance, the incorrectly

specified relay failed in service, causing a plant transient and automatic reactor scram.

Additional Tracking Items

Type

Issue number

Title

Report

Section

Status

LER 05000458/2017-007-00

Automatic Reactor Scram

Due to Failure of Main

Generator Voltage Regulator

Mode Transfer Relay

71153

Closed

LER 05000458/2017-008-00

Automatic Reactor Scram

Due to Failure of Main

Feedwater Regulator

Transfer Relay

71153

Closed

PLANT STATUS

River Bend Station began the inspection period at rated thermal power. On January 8, 2018,

the unit was shut down for a planned maintenance outage. A reactor startup was performed on

January 30, 2018. The unit was shut down to conduct a forced outage on February 1, 2018,

due to an unexpected trip of the B reactor recirculation pump. A reactor startup was performed

on February 9, 2018. The unit was shut down to conduct a forced outage on March 1, 2018,

due to a pipe leak associated with the main condenser. A reactor startup was performed on

March 6, 2018. The unit was returned to rated thermal power on March 20, 2018. The unit

remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Division I residual heat removal system on January 25, 2018

(2) Division II residual heat removal system on January 25, 2018

(3) Control building heating, ventilation, and air conditioning (HVAC) system on

March 15, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the standby

service water system on March 8, 2018.

71111.05AQFire Protection Annual/Quarterly

Quarterly Inspection (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Residual heat removal pump A room, fire area AB-5 on January 25, 2018

(2) Residual heat removal pump B room, fire area AB-3 on January 25, 2018

(3) Standby service water pump A room, fire area PH-1/Z-1on March 12, 2018

(4) Standby service water pump B room, fire area PH-2/Z-1 on March 12, 2018

71111.06Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the standby service

water pump rooms, SW-01 on January 12, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Electrical manhole 1EMH607 on January 16, 2018

(2) Electrical manhole 1EMH613 on January 16, 2018

71111.11Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated licensed operator requalification training on

February 6, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated the operators performance during a plant shutdown for

a planned maintenance outage on January 7, 2018.

71111.12Maintenance Effectiveness

Routine Maintenance Effectiveness (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Functional failure review of standby service water on January 16, 2018

(2) Functional failure review of the 120 VAC system on February 19, 2018

(3) Functional failure review of the reactor recirculation system associated with the failure of

the B recirculation pump to upshift to fast speed on March 1, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control (4 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Yellow shutdown risk condition with containment access hatch open on January 8, 2018

(2) Yellow risk condition due to fuel movement and Division III emergency diesel generator

inoperability while in Mode 5 on January 24, 2018

(3) Yellow risk condition due to high pressure core spray pump inoperability during remote

shutdown panel surveillance testing on February 23, 2018

(4) Yellow risk condition due to residual heat removal pump B discharge flow inoperability

during maintenance and testing on March 15, 2018

71111.15Operability Determinations and Functionality Assessments (5 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) E31-N604F main steam line tunnel temperature exceeded allowable values per

surveillance test requirements on January 3, 2018

(2) Jacket water leaks associated with Division I emergency diesel generator on

January 5, 2018

(3) Unexpected system response during Division II standby service water surveillance

testing on January 15, 2018

(4) Residual heat removal shutdown cooling outboard isolation valve E12-MOVF008

over-torqued on February 19, 2018

(5) Division I inverter DNB-INV01A1 system output voltage exceeded max allowable voltage

on March 20, 2018

71111.18Plant Modifications (1 Sample)

The inspectors evaluated the following permanent modification:

(1) Division I standby diesel generator exhaust manifold piping to eliminate a vulnerability to

flaw formation and leakage after Division I emergency diesel generator shroud

replacement on January 19, 2018

71111.19Post Maintenance Testing (7 Samples)

The inspectors evaluated the following post maintenance tests:

(1) STP-209-6310, Revision 39, RCIC Pump and Valve Quarterly Operability and Flow

Test, following maintenance on the reactor core isolation cooling governor valve on

January 5, 2018

(2) STP-504-4504, Revision 18, RPS/Control Rod Block - IRM D Channel Functional Test

and LSFT, following replacement of intermediate range monitor D control relay

H13-P672-Z2K18 on January 13, 2018

(3) STP-309-0206, Revision 29, Division I Diesel Generator 184 Day Operability Test,

following maintenance on Division I emergency diesel generator on January 22, 2018

(4) STP-309-0203, Revision 329, Division III Diesel Generator Operability Test, following

replacement of the Division III emergency diesel generator voltage regulator on

January 24, 2018

(5) STP-504-4503, Revision 20, RPS/Control Rod Block - IRM C Channel Functional Test

and LSFT, following maintenance on intermediate range monitor C on January 30, 2018

(6) SOP-0030, Revision 33, High Pressure Core Spray System (Sys 203), following

maintenance on high pressure core spray motor supply breaker on February 22, 2018

(7) STP-256-6603, Revision 21, Division I Standby Service Water Quarterly Valve

Operability Test, following maintenance and repairs to standby service water valve

SWP-MOV96A on March 5, 2018

71111.20Refueling and Other Outage Activities (3 Samples)

(1) The inspectors evaluated a planned maintenance outage implemented to remove

damaged fuel assemblies. Inspection activities occurred from January 8, 2018, to

January 31, 2018.

(2) The inspectors evaluated forced outage activities from February 1, 2018, to

February 9, 2018. The forced outage occurred due to a failure of the B reactor

recirculation pump to shift to fast speed. Station personnel conducted a forced outage

and replaced the 13.8 kV transformer associated with the B reactor recirculation

pump.

(3) The inspectors evaluated forced outage activities from March 1, 2018, to

March 7, 2018. The forced outage occurred due to a leak from a crack on piping

associated with the main condenser. Station personnel conducted a forced outage

and repaired the leak.

71111.22Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (3 Samples)

(1) STP-203-1302, Revision 25, E22-S001BAT Quarterly Surveillance, on

January 18, 2018

(2) STP-057-3801, Revision 012, Containment Equipment Hatch Leak Rate Test, on

January 27, 2018

(3) OSP-0604, Revision 2, Remote Shutdown System Control Circuit Operability Test, on

February 26, 2018

In-service (2 Samples)

(1) STP-204-1300, Revision 18, LPCI Pump A Start Time Delay Channel Calibration and

Channel Functional Test, on January 2, 2018

(2) STP-256-6301, Revision 23, Division I Standby Service Water Quarterly Valve

Operability Test, on January 6, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) STP-000-0001, Revision 082, Daily Operating Logs, on January 4, 2018

Containment Isolation Valve (1 Sample)

(1) STP-057-7705, Revision 012, Primary Containment Airlocks Seal Leakage Rate Test,

on January 28, 2018

71114.06Drill Evaluation

Drill/Training Evolution (1 Sample)

The inspectors evaluated a simulator-based emergency preparedness drill on

March 13, 2018.

RADIATION SAFETY

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the

following activities:

(1) RWP 2017-1220, Pre/Post Outage Prep Including Support

(2) RWP 2017-1296, RWCU Pump Replacement and Support Activities

(3) RWP 2017-1426, Motor Operated Valve and In-Vessel Testing

(4) RWP 2017-1436, Installation/Removal of Temporary Installation Main Steam Tunnel

(5) RWP 2017-1753, RWCU Hx Room Flow Accelerated Corrosion (FAC) Piping

Replacement

(6) RWP 2017-1800, RF-19 Refuel Floor Outage Activities

(7) RWP 2018-1327, Separator Repair Following SHZAM Bolt Disengagement

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the

following activities:

(1) RWP 2017-1220, Pre/Post Outage Prep Including Support

(2) RWP 2017-1296, RWCU Pump Replacement and Support Activities

(3) RWP 2017-1426, Motor Operated Valve and In-Vessel Testing

(4) RWP 2017-1436, Installation/Removal of Temporary Installation Main Steam Tunnel

(5) RWP 2017-1753, RWCU HX Room FAC Piping Replacement

(6) RWP 2017-1800, RF-19 Refuel Floor Outage Activities

(7) RWP 2018-1327, Separator Repair Following SHZAM Bolt Disengagement

Radiation Worker Performance (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification (3 Samples)

The inspectors verified licensee performance indicators submittals listed below:

(1)

IE01: Unplanned Scrams per 7000 Critical Hours Sample (01/01/2017 - 12/31/2017)

(2)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (01/01/2017 -

2/31/2017)

(3)

IE04: Unplanned Scrams with Complications (USwC) Sample (01/01/2017 -

2/31/2017)

71152Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issue:

(1) Relay failures in the feedwater level control system and the turbine generator voltage

regulator control system resulted in reactor scrams

71153Follow-up of Events and Notices of Enforcement Discretion

Licensee Event Reports (2 Samples)

The inspectors evaluated the following licensee event reports which can be accessed at

https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Report 05000458/2017-007-00, Automatic Reactor Scram Due to

Failure of Main Generator Voltage Regulator Mode Transfer Relay on August 21, 2017

(2) Licensee Event Report 05000458/2017-008-00, Automatic Reactor Scram Due to

Failure of Main Feedwater Regulator Transfer Relay on October 12, 2017

INSPECTION RESULTS

Failure to Implement Procedure for Storage of Material in the Pools

Cornerstone

Significance

Cross-cutting

Aspect

Report Section

Occupational

Radiation Safety

Green

NCV 05000458/2018001-01

Closed

[H.4] - Human

Performance,

Teamwork

71124.02 -

Occupational

As Low As

Reasonably

Achievable

(ALARA)

Planning and

Controls

The inspector identified a non-cited violation of Technical Specification 5.4.1.a, for the

licensees failure to implement written procedures for activities referenced in Appendix A of

Regulatory Guide 1.33, Revision 2, dated February 1978. Specifically, the licensee failed to

implement radioactive material control Procedure ADM-0071, Fuel Pools Material Control,

Revision 8, for the storage and movement of spent Tri-Nuke filters.

Description:

The inspector reviewed condition reports (CRs) that documented incidents associated with the

movement and storage of highly radioactive materials in the various pools at River Bend

Station (RBS) in 2017. Four radiological occurrences involved unplanned and unanticipated

movements of spent Tri-Nuke filters around the separator and upper inclined fuel transfer

storage (IFTS) pools.

January 5, 2017, CR-RBS-2017-0100: Radiation Protection (RP) was notified that

a spent Tri-Nuke filter was found floating on the surface of the separator pool.

Surveys of the filter and surrounding area were performed by RP technicians.

Dose rates on the filter measured 2.2 Roentgen/hour (R/hr) on contact and

0.85 R/hr at 30 centimeters (cm).

April 3, 2017, CR-RBS-2017-03011: A used Tri-Nuke filter measuring 1.3 R/hr and

0.350 R/hr at 30 cm was discovered floating in the reactor building (RB)-186

separator pool.

April 24, 2017, CR-RBS-2017-03424: While performing video surveillance of the

refueling pool on RB-186, a Tri-Nuke filter was discovered floating on the surface of

the separator pool. The filter had a dose rate of 11 R/hr on contact and 6 R/hr at

cm.

During the week of April 27, 2017, the licensee transferred the 30 Tri-Nuke filters

from the separator pool to the IFT

S. However, one of the Tri-Nuke filters

(0.300 R/hr) had been damaged when falling into the bottom of the IFTS pool. It

was eventually recovered and stored.

The inspector examined the circumstances that caused the Tri-Nuke filters to become buoyant

and float around the separator pool resulting in unintended radiological hazards. Two CRs

from 2015 (CR-RBS-2015-07893 and CR-RBS-2015-08050) identified concerns with air

intrusion from a leaky spent fuel cooling system valve. Also, two CRs from 2017

(CR-RBS-2017-01881 and CR-RBS-2017-03424) identified that the leaky valve caused spent

Tri-Nuke filters to float. The licensee eventually determined the solution to the problem was to

transfer the spent Tri-Nuke filters to the upper IFTS pool. However, the inspector determined

that the licensee was not supposed to leave the spent Tri-Nukes in the separator and upper

IFTS pools unless designed storage racks were in place or an engineering change request

(ECR) evaluation allowed the practice.

The movement and storage of radioactive material in and around the pools at RBS are

implemented through the following procedures:

EN-RP-121, Revision 13, Radioactive Material Control

EN-RP-123, Revision 1, Radiological Controls of Highly Radioactive Objects

ADM-0071, Revision 8, Fuel Pools Material Control

The inspector determined that the purpose of Entergy Corporate Procedures EN-RP-121 and

EN-RP-123 was to prevent the unauthorized movement and removal of radioactive materials

around the site and from pools. These procedures required that licensee personnel receive

proper authorization from reactor engineering and radiation protection management for

movement and storage of radioactive materials in pools and the around pools. Based on the

documents and procedures reviewed by the inspector, the licensee did not specify storage

requirements or equipment for these filters to prevent them from floating to the top of the pools

and becoming radiological hazards.

The inspector reviewed RBS site-specific Procedure ADM-0071, Revision 8, which described

the requirements established for the control of miscellaneous material stored in fuel pools. At

RBS, radioactive materials are stored in the following seven pools: spent fuel pool, cask pool,

lower IFTS, upper IFTS, upper containment pool, dryer storage pool, and separator pool.

ECR RBS-ER-97-504, Fuel Pool Inventory Identification, Justification, and Evaluation, dated

September 30, 1997, stated that the purpose of ADM-0071 was to provide a means to

adequately control, regulate, and inventory non-special nuclear material stored in the spent

fuel pool and upper containment pools. Items may not be stored in the spent fuel storage

upper containment pools, which includes the separator pool, without design engineering

approval. Additionally, items that are not stainless steel or in a stainless steel container are

not to be stored without being verified radiation resistant and not detrimental to the fuel pool

water quality.

Section 7.3 of Procedure ADM-0071 provided instructions for storing or moving material within

the same pool or to another pool location. Section 7.3.7 required that the pool material

inventory POOL MATERIAL CONTROL FORM be completed and updated after approval of

the material storage/move by the reactor engineering manager and radiation protection

superintendent. The form required specific information about proposed items to be stored,

such as the radiation surveys taken, work order used, storage container location, special

requirements, radiation exposure duration, and applicable ECR evaluations. At the time of this

inspection, the licensee did not have any pool material control forms completed for the 30 Tri-

Nuke filters that were placed into the separator pool and subsequently transferred to the IFTS

in 2017. In particular, there was no pool material control forms signed by the reactor

engineering manager and radiation protection superintendent approving the proper storage

and movement of these Tri-Nuke filters for either location.

Procedure ADM-0071 allowed miscellaneous items such as Tri-Nuke filters to be stored in the

separator and IFTS pools if an ECR evaluation and engineering approval on the storage

method were done. The inspector queried whether any ECRs had been performed for storage

of the Tri-Nuke filters. Only two were available for the inspectors review. The two ECRs

(ECR RBS-ER-97-504 and ECR 33163) revealed that the licensee had not made specific

provisions or performed evaluations for the storage of Tri-Nuke filters in the separator or upper

IFTS pools.

The inspector determined that licensees procedures did not adequately address securing

highly radioactive material in pools such as Tri-Nuke filters to prevent radioactive material from

floating to the pool surface and thereby becoming radiation hazards to personnel, as had

occurred three times in early 2017. Further, the failure to follow the requirements of

Procedure ADM-0071 resulted in bypassing the performance of an evaluation to ensure proper

movement and storage of the filters.

Corrective Actions: Immediate safety concerns with filters becoming buoyant due to the air

intrusion in the separator pool were addressed when the licensee transferred the 30 Tri-Nuke

filters to the IFTS pool in late April 2017. Procedure compliance issues are being addressed

through an action item in CR-RBS-2018-00523.

Corrective Action References: CR-RBS-2018-00523

Performance Assessment:

Performance Deficiency: The licensees failure to implement written procedures for activities

referenced in Appendix A of Regulatory Guide 1.33, Revision 2, dated February 1978, as

required by Technical Specification 5.4.1.a, was a performance deficiency. Specifically, the

licensee failed to implement radioactive material control Procedure ADM-0071, Fuel Pools

Material Control, Revision 8, for the storage and movement of spent Tri-Nuke filters.

Screening: The performance deficiency was more than minor because it adversely affected

the programs and process (exposure control) attribute of the Occupational Radiation Safety

Cornerstone and its objective to ensure the adequate protection of the worker health and

safety from exposure to radiation from radioactive material. Specifically, allowing highly

radioactive material (Tri-Nuke filters) to be moved and stored in an unsafe, unevaluated,

unapproved manner resulted in unanticipated dose rates and unplanned worker exposures to

radiation.

Significance: The inspectors assessed the significance of the finding using NRC Inspection

Manual Chapter 0609, Appendix, C, Occupational Radiation Safety Significance

Determination Process, and determined that the finding was of very low safety significance

(Green) because it did not: (1) involve ALARA planning or work controls, (2) did not involve

an overexposure, (3) did not have a substantial potential to be an overexposure, and (4) the

ability to assess dose was not compromised.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human

performance, associated with teamwork, because individuals and work groups failed to

communicate and coordinate their activities within and across organizational boundaries to

ensure nuclear safety was maintained. Specifically, the communication and coordination of

activities between construction projects, health physics, and nuclear engineering failed to

prevent radiological issues associated with the storage and movement of Tri-Nuke filters.

Enforcement:

Violation: Technical Specification 5.4.1.a requires, in part, that procedures be written,

implemented, and established for those areas recommended in Regulatory Guide 1.33,

Appendix A, Revision 2, 1978. Section 7(b) of Regulatory Guide 1.33, Appendix A, requires

procedures for control of radioactive materials to minimize potential releases to the

environment and control personnel exposure associated with solid radioactive waste.

Licensee Procedure ADM-0071, Fuel Pools Material Control, Revision 8, Section 7.1,

requires that if material must be stored in a pool or previously stored material must be moved

from one pool to a different pool or to a different area in the same pool, Section 7.3 must be

completed. Section 7.3.7 requires that the pool material inventory POOL MATERIAL

CONTROL FORM be updated after approval of the material storage/move by the reactor

engineering manager and radiation protection superintendent.

Contrary to the above, beginning in 2017 and to present, the licensee stored material in a

pool and moved previously stored material from one pool to a separate pool without

completing Section 7.3 of Procedure ADM-0071. Specifically, the licensee stored 30 Tri-Nuke

filters in the separator pool without completing the pool material Inventory form and, in

April 2017, moved the filters to the incline fuel transfer storage pool without completing/

updating a pool material Inventory POOL MATERIAL CONTROL FORM and obtaining the

required approvals.

As of January 26, 2018, the licensee had not fully implemented Section 7.3 of

Procedure ADM-0071 by updating the form and obtaining written approval from the radiation

protection superintendent and reactor engineering manager for the movement and safe

storage of the 30 Tri-Nuke filters in the incline fuel transfer storage pool.

Disposition: This violation is being treated as a non-cited violation consistent with

Section 2.3.2.a of the NRC Enforcement Policy.

Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram

Cornerstone

Significance

Cross-cutting

Aspect

Report

Section

Initiating Events

Green

FIN 05000458/2018001-02

Closed

[H.5] - Human

Performance,

Work

Management

71152 -

Problem

Identification

and

Resolution

The inspectors reviewed two examples of a self-revealed finding for the licensees installation

of an incorrectly specified relay in 1) the control circuitry for the feedwater level control system

and 2) the turbine generator voltage regulator circuitry. In each instance, the incorrectly

specified relay failed in service, causing a plant transient and automatic reactor scram.

Description:

Example 1: On August 18, 2017, with the plant operating at 100 percent power, an automatic scram occurred. At the time of the scram, operators were performing a scheduled

surveillance test that called for a planned shift of the controlling channel of the feedwater level

control system from channel B to channel

A. Immediately after the shift, feedwater regulating

valves went full open and recirculation pumps downshifted to slow speed. The combination

of these events caused an automatic scram to occur on high flow-biased thermal power.

The cause of the scram was a failure of the feedwater level select relay, C33A-K12. The

failure of this relay caused the interpreted level in the feedwater level control system to go to

zero, which in turn caused a full open demand on the feedwater regulating valves and a

downshift of recirculation pumps from fast to slow speed on a perceived low level condition in

the reactor vessel.

A subsequent investigation determined that the feedwater level select relay failed due to a

degradation in the electrical contacts on the relay. The degradation caused a sharp increase

in resistance across the contacts, which in turn led to a substantial reduction in the current

passing through these contacts to the rest of the feedwater level control circuit. With the

current substantially reduced, the circuit incorrectly perceived a low vessel level condition.

The failed relay was a General Electric Agastat GPI type relay. Operating experience at

River Bend Station and at other sites in the industry has established that this type of relay is

prone to intermittent failure. When used in low current applications such as those associated

with the feedwater level control circuit, there is a potential for oxidation to build up on the

contacts of the relay, which will create resistance across the relay and impair its ability to pass

current. In light of this operating experience, the licensee issued part interchangeability

evaluation (PIE) 411 in March 1993. PIE 411 called for a GPIA type relay with gold-plated

contacts to be used for C33A-K12 in lieu of the silver-plated GPI type relay that had

traditionally been used.

The inspectors determined that PIE-411 was a self-imposed licensee standard. The licensee

complied with this standard until February 2017, when the gold-plated relay installed in the

system was incorrectly replaced with a silver-plated relay. Given that the silver-plated relay

was being used in a low current application, it built up resistance over time and eventually

failed, causing the scram.

Example 2: On June 23, 2017, with the plant operating at 100 percent power, an automatic scram occurred. At the time of the scram, operators were performing a scheduled

surveillance test that called for a planned shift of the turbine generator voltage regulator

control from automatic to manual. Immediately after the shift, the main generator tripped

which caused a subsequent reactor scram.

The cause of the scram was a failure of the voltage regulator transfer circuit relay,

EXS-PNL1-43A. The failure of this relay caused an open circuit in both the manual and

automatic voltage regulators and complete loss of control of the Alterrex Excitation System.

When neither the manual nor the automatic voltage regulator is connected to the Alterrex

Excitation System, there is no excitation field applied. The result is a turbine trip on loss of

excitation.

A subsequent investigation determined that the main generator voltage regulator mode

transfer relay failed due to a degradation in the electrical contacts on the relay. The

degradation caused a sharp increase in resistance across the contacts, which in turn led to a

substantial reduction in the current passing through these contacts to the rest of the voltage

regulator control circuit. With the current substantially reduced, the circuit could not be

completed for either the manual or automatic control system of the turbine voltage regulator.

The failed relay was a General Electric DC operated 4-pole double throw miniature 43A relay

provided as part of the turbine generator package and is part of the Alterrex exciter transfer

panel assembly. Operating experience at River Bend Station and at other sites in the

industry has established that this type of relay is prone to intermittent failure. The station

generated engineering change 40442 in 2012 to replace the 43A relay with a different model

documenting obsolescence of this relay as well as operating experience related to intermittent

failures of this type of relay. In light of this operating experience, the licensee cancelled

engineering change 40442 for unknown reasons and did not replace the 43A relay with a

different style.

Corrective Actions: The licensee installed the correctly specified relay in the feedwater level

control system and an upgraded vendor recommended relay in the turbine voltage regulator

control system. The licensee also completed an extent of condition review on similar relays.

Corrective Action References: Condition Reports CR-RBS-2017-06118 and

CR-RBS-2017-04961

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees installation of an

incorrectly specified relay in 1) the control circuitry for the feedwater level control system and

2) the control circuitry for the main generator voltage regulator were two examples of a

performance deficiency.

Screening: The performance deficiency was more than minor, and therefore a finding,

because it was associated with the equipment performance attribute of the Initiating Events

Cornerstone and adversely affected the cornerstone objective to limit the likelihood of events

that upset plant stability and challenge critical safety functions during shutdown as well as

power operations.

Significance: The inspectors assessed the significance of the finding using Inspection

Manual Chapter 0609, Appendix A, The Significance Determination Process for Findings At-

Power. The finding was determined to be of very low safety significance (Green) because

the finding did not contribute to both the likelihood of a reactor trip and the likelihood that

mitigating equipment would not be available.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human

performance associated with work management because the licensee failed to implement a

process of planning, controlling, and executing work activities such that nuclear safety is the

overriding priority.

Enforcement: Inspectors did not identify a violation of regulatory requirements associated

with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 26, 2018, the inspectors presented the radiation safety inspection results to

Mr.

W. Maguire, Site Vice President, and other members of the licensee staff.

On April 25, 2018, the inspectors presented the quarterly resident inspector inspection results to

Mr.

W. Maguire, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.04 - Equipment Alignment

Condition Reports (CR-RBS-)

2017-05292

2017-07460

2017-07880

2018-00615

2018-00992

Drawings

Number

Title

Revision

PID-09-10E

Engineering P&I Diagram, System 256, Service

Water - Standby

PID-22-09A

Engineering P&I Diagram, System 402, HVAC -

Control Building

Procedures

Number

Title

Revision

R-STM-0118

Service Water Systems

R-STM-0402

HVAC - Control Building and Diesel Generator

Building

SOP-0031

Residual Heat Removal

338

SOP-0042

Standby Service Water System (Sys #256)

SOP-0058

Control Building HVAC System (Sys #402)

71111.05 - Fire Protection

Procedures

Number

Title

Revision

AB-070-502

RHR Pump A Room, Fire Area AB-5

AB-070-505

RHR Pump B Room, Fire Area AB-3

EN-DC-161

Control of Combustibles

SP-118-450

Standby Cooling Pump A Room, Fire Area PH-1/Z-1 3

SP-118-451

Standby Cooling Pump B Room, Fire Area PH-2/Z-1 3

STP-250-4533

FPM-PNL6 Fire Detection Channel Functional and

Operational Tests for Zone SD72, SD73, and SD89

(A&B)

71111.06 - Flood Protection Measures

Condition Reports (CR-RBS-)

2018-00200

2018-00367

2018-00369

Procedure

Number

Title

Revision

PN-317

Max Flood Elevations for Moderate Energy Line

Cracks in Cat I Structures

Work Orders

0052802383

0052802384

71111.11 - Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

GOP-0002

Power Decrease/Plant Shutdown

078

RSMS-OPS-HIT1

Licensed Operator Requalification

71111.12 - Maintenance Effectiveness

Condition Reports (CR-RBS-)

2017-00629

2017-01579

2017-01668

2017-01703

2017-01739

2017-01748

2017-01749

2017-03871

2017-04048

2017-04514

2017-05273

2017-05939

2017-06767

2017-06977

2017-06998

2017-07017

2017-07200

2017-07410

2017-07454

2017-07820

2017-07880

2017-07950

2018-00825

2018-01363

Procedures

Number

Title

Revision

EN-DC-203

Maintenance Rule Program

EN-DC-204

Maintenance Rule Scope and Basis

EN-DC-205

Maintenance Rule Monitoring

EN-DC-206

Maintenance Rule (A)(1) Process

Procedures

Number

Title

Revision

SOP-0042

Standby Service Water System (Sys #256)

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Condition Report (CR-RBS-)

2018-00505

Procedures

Number

Title

Revision

ADM-0096

Risk Management Program Implementation and

On-Line Maintenance Risk Assessment

26

EN-WM-104

On Line Risk Assessment

OSP-0037

Shutdown Operations Protection Plan (SOPP)

036

71111.15 - Operability Determinations and Functionality Assessments

Condition Reports (CR-RBS-)

2016-05866

2017-04048

2017-04097

2017-04302

2017-05033

2017-07111

2017-07162

2017-07199

2017-07219

2017-07532

2017-08048

2018-00194

2018-00402

Miscellaneous

Number

Title

Revision

EC 66261

SWP-SOV523B Reasonable Expectation of

Operability Input for CR-RBS-2016-05866

Procedures

Number

Title

Revision

OSP-0028

Log Report - Normal Switchgear, Control, and

Diesel Generator Buildings

108

STP-000-0001

Daily Operating Logs

STP-256-6608

Division II Standby Service Water 2 Year Position

Indication Verification Test

STP-309-0201

Division I Diesel Generator Operability Test

71111.18 - Plant Modifications

Calculation

Number

Title

Revision

G13.18.2.4-108

LPI, Inc. Evaluation of Standby Diesel Generator

Exhaust Manifold Stiffeners

Condition Reports (CR-RBS-)

2015-04817

2016-06841

2016-07753

2017-07111

2017-07532

2017-08048

Drawing

Number

Title

Revision

PID-08-09B

Engineering P&I Diagram System 309 Diesel

Generator

Procedure

Number

Title

Revision

SOP-0053

Standby Diesel Generator and Auxiliaries

(Sys #309)

057

Work Order 228397

71111.19 - Post-Maintenance Testing

Condition Reports (CR-RBS-)

2017-07237

2017-07728

Miscellaneous

Number

Title

Revision/Date

E22-S004 ACB2

Vendor Overhaul Breaker

Work Orders

00469400

00476322

00479296

Procedures

Number

Title

Revision

CMP-EM-203-1001

Inspection and Maintenance of 4.16 KV

Magne-Blast Circuit Breakers

STP-209-0201

RCIC Discharge Piping Fill and Valve Lineup

Verification

Work Orders

228397

00478865

00492550

00493155

00493741

2650988

2769345

2779858

71111.20 - Refueling and Other Outage Activities

Procedures

Number

Title

Revision

GOP-0001

Plant Startup

099

GOP-0002

Power Decrease/Plant Shutdown

078

71111.22 - Surveillance Testing

Condition Reports (CR-RBS-)

2015-02736

2018-00290

Drawing

Number

Title

Revision

GE-828E534AA

Elementary Diagram Residual Heat Removal

Sheet 8

Procedures

Number

Title

Revision

SOP-0018

Normal Service Water System

SOP-0042

Standby Service Water System

Work Orders

00492725

2785880

2787021

71114.06 - Drill Evaluation

Miscellaneous

Number

Title

Revision

RDRL-EP-1201

Site Drill Scenario

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and

Controls

Audits and Self-Assessments

Number

Title

Date

LO-RLO-2017-0055

Pre-NRC Self-Assessment Radiation Safety -

IP 71124.02

December 4, 2017

LO-RLO-2016-0145

Pre-NRC Self-Assessment Radiation Safety -

IP 71124.02

January 17, 2017

Condition Reports (CR-RBS-)

2015-07893

2015-08050

2017-00100

2017-00707

2017-00868

2017-01250

2017-01355

2017-01731

2017-01881

2017-01927

2017-03011

2017-03237

2017-03266

2017-03424

2017-03598

2017-03788

2017-04856

2017-04941

2017-05499

2017-01372

2017-01422

Miscellaneous

Number

Title

Date

RF-19 Water Movement Plan

January 2017

CFR Part 20.1101(c) Report for 2016

June 2017

ADM-0071

Post Material Inventory Report Post RF-19

May 31, 2017

WO 473593

Relocate Tri-Nuke filters from the Separator Pool

the IFTS

April 11, 2017

Procedures

Number

Title

Revision

ADM-0071

Fuel Pools Material Control

EN-RP-100

Radiation Worker Expectations

EN-RP-101

Access Control for Radiologically Controlled Areas

Procedures

Number

Title

Revision

EN-RP-102

Radiological Control

EN-RP-105

Radiological Work Permits

EN-RP-106

Radiological Survey Documentation

EN-RP-108

Radiation Protection Posting

EN-RP-109

Hot Spot Program

EN-RP-110

ALARA Program

EN-RP-110-03

Collective Radiation Exposure (CRE) Guidelines

EN-RP-110-04

Radiation Protection Risk Assessment Process

EN-RP-110-06

Outage Dose Estimating and Tracking

EN-RP-115-01

BRAC Survey Instructions

EN-RP-121

Radioactive Material Control

EN-RP-123

Radiological Controls for Highly Radioactive

Objects

EN-RP-143

Source Control

EN-RP-151

Radiological Diving

GMP-0111

Tri-Nuclear Filter Operations

Radiation Surveys

Number

Title

Date

RBS-1701-0042

RB +186 Upper Pool HCA Handrail

January 5, 2017

RBS-1703-0124

RB +186 Upper Pool and Carousel Area

March 5, 2017

RBS-1704-0059

RB +186 Upper Pool 354 R/hr. Tri-Nuke Filter

April 5, 2017

RBS-1704-0248

RB +186 Upper Pool 11 R/hr. Tri-Nuke Filter

April 21, 2017

RBS-1704-0303

RB +186 Upper Pool 24 Tri-Nuke Filters

April 21, 2017

Radiation Work Permits/ALARA Reviews

Number

Title

Revision

2017-1220

Pre/Post Outage Prep Including Support

2017-1296

RWCU Pump Replacement and Support Activities

2017-1426

Motor Operated Valve and In-Vessel Testing

Radiation Work Permits/ALARA Reviews

Number

Title

Revision

2017-1436

Installation/Removal of Temporary Installation Main

Steam Tunnel

2017-1753

RWCU HX Room FAC Piping Replacement

2017-1800

RF-19 Refuel Floor Outage Activities

2018-1327

Separator Repair Following SHZAM Bolt

Disengagement

71124.04 - Occupational Dose Assessment

Audits and Self-Assessments

Number

Title

Date

LO-RBS-2017-00055 Pre-NRC Assessment IP71124.04

Occupational Dose

October 27, 2017

Condition Reports (CR-RBS-)

2016-05858

2017-08105

2017-00707

2017-00868

2017-00910

2017-03788

2017-05176

2017-05489

Miscellaneous

Number

Title

Date

2017

Multi-Pack TLD Results

2017

2018

NVLAP Accreditation Report

2018

Procedures

Number

Title

Revision

EN-RP-131

Air Sampling

EN-RP-201

Dosimetry Administration

EN-RP-202

Personnel Monitoring

EN-RP-203

Dose Assessment

EN-RP-204

Special Monitoring Requirements

EN-RP-205

Prenatal Monitoring

EN-RP-206

Dosimeter of Legal Record QA

EN-RP-208

Whole Body Counting / In-Vitro Bioassay

Procedures

Number

Title

Revision

EN-RP-311

Electronic Alarming Dosimeter

EN-RP-317-09

Electronic Alarming Dosimeter Calibration

Self-Reading Dosimeter Calibration Records

Number

Title

Date

2017-B2-28-

CALDAT-05667

Self-Reading Dosimeter

September 18, 2017

2017-B2-28-

CALDAT-05713

Self-Reading Dosimeter

September 30, 2017

2017-B2-28-

CALDAT-05736

Self-Reading Dosimeter

September 30, 2017

2017-B2-28-

CALDAT-05836

Self-Reading Dosimeter

September 26, 2017

2017-B2-28-

CALDAT-06692

Self-Reading Dosimeter

December 15, 2017

71151 - Performance Indicator Verification

Procedures

Number

Title

Revision

EN-LI-114

Performance Indicator Process

NEI 99-02

Regulatory Assessment Performance Indicator

Guideline

71152 - Problem Identification and Resolution

Condition Reports (CR-RBS-)

2017-06118

2017-04961

71153 - Follow-up of Events and Notices of Enforcement Discretion

Condition Report (CR-RBS-)

2017-06118

Miscellaneous

Number

Title

Revision

PIE-411

Part Interchangeability Evaluation 411

Procedure

Number

Title

Revision

EN-MA-101

Conduct of Maintenance

Work Order 00441196

The following items are requested for the

Occupational Radiation Safety Inspection

at River Bend Station

January 22-25, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 12, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

Louis.Carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of last inspection:

January 21, 2016

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional specific procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit (RWP) Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address RWP violations, electronic dosimeter

alarms, and RWP dose estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection:

January 21, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D.

Procedure indexes for the following areas:

1. Occupational Dose Assessment

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of positive whole body counts since date of last inspection, names redacted if

desired

H.

Part 61 analyses/scaling factors

I.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18128A246

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: CHY/rdr

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/C

RI:DRP/C

ARI:DRP/C

SPE:DRP/C

C:DRS/EB1

C:DRS/EB2

NAME

JSowa

BParks

MOBanion

CYoung

TFarnholtz

JDrake

SIGNATURE

/RA/

/RA/

/RA-E/

/RA/

/RA/

/RA/

DATE

4/23/18

4/30/18

4/24/18

4/27/18

4/23/18

4/23/18

OFFICE

C:DRS/OB

C:DRS/PSB2

TL:IPAT

BC:DRP/C

NAME

VGaddy

HGepford

GGeorge

JKozal

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE

4/14/18

4/23/18

4/24/18

5/08/18