ML23235A108
| ML23235A108 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/14/2023 |
| From: | Ameren Corp, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| EIP-ZZ-00260, Rev 30 | |
| Download: ML23235A108 (1) | |
Text
PROCEDURE REVIEW FORM (PRF) 1.0 initiation Initiator: James Reed Date: 20230814 Procedtire [)ept:
EP Document #: EIP-ZZ-00260 Rev. #
030 (3 digits required)
Title:
Event Closeout I Plant Recovery Level ofUse:
ElContinuous EReference Inforrmitiun MuftipIe EN/A 2.0 Reason for Change/Description of Change tList commitments, CRS, eB Change Reqitests, OERs, P/ant tlIods etc and recora mimbers here)
CR 202305406. Corrected misspelling.
See SOC for mote details.
rnnt niil 3.0.
Document Disposition 0Temp Change ElNew Doe in l t
1EJMijor Revision LMinor Revision ElCancellation Adrninistrative Correction t(3 T
/t(/
DepLHead orDesignated Approver requiredfor Adrninistratve Corrections (Signature/P[N/t)atc) no other signatures required 4O Interim Approval (Temp. Change only)
Temp. Change #:
Expiration Date:
Cognizant Supervisor (Signature/P[N/Date)
SRO (Signature/PIN/Date)
5.0 Comments
Continued: C 6.0 Reviews and Signatures (NOT requiredJr Administrative ( orreclions)
Ret&ws RLquired lpl j
PIN Signature Date CA0139 Attached Preparer p.
jlI?o?
JgL3t)If Technical Revie Yes LI No Technical Review LI Yes No Add! Review LI Yes No AddlReview DYes üNo LiAdditional Reviews (See Attac?wd CA Ol39fiirms).
Number of additionaL CAO 1 39s:
Type Coorchnator PIN Signature
[
Dczte CA0139 Attachcd LlVattdatton I
D\\ flNo 50.59 Review 0CA25 I 0 LJCA25 1 1 JCA25 I 2 / EN/A (per AP4-!Z-00113]
Scieeiier tnitialiPIiV Reviewer hutiat/ PIN 5;;-j; l-ktii:i or Designated Approver) Is a Change Management Plan required?
ElYes ONo tir YES. attach QA2773 or CA2774)
Is a Cross-Disciplinary review required?
EYes No 7.0 Approval (F/titer approval must he qttutled as P/i PAPI I? or PA TGAPR in Qicu/ivlaster)
El Senior Director Nuclear Operations Approval (pet APA-ZZ-OO1O1) 1 ORC is required in accordance with APA-ZZ-00091 E Department Head Final Review and Approval ORC Meeting:
Dept. I-lead or Designated Approver Senior Director Nticlcar Operations t Signature/PIN/Date)
(Signature/PIN/Date)
A1900001 2 S 3SA2100062 65 69 M1900001 Page 1 of 2 APA-ZZ-OO I 0 I Vote : Page 2 J7rvtde.s instaccicons to comptere ihisform and may be discarded CA0033 Rev. 002