ML17354B132

From kanterella
Jump to navigation Jump to search
Submits SG Tube Plugging 15-day Rept,Per TS 4.4.5.5.a.Unit 3 SGs Inspected from 981005-08.One SG Tube Located in Row 42, Column 55 Plugged in SG 3B as Result of Insp
ML17354B132
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/14/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-98-256, NUDOCS 9810200272
Download: ML17354B132 (4)


Text

~ CATEGORY N REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

ACCESSION NBR:9810200272 DOC.DATE: 98/10/14 NOTARIZED- NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C DOCKET 05000250 I

AUTH.NAME ' AUTHOR AFFILIATION HOVEY,R.J. Florida Power & Light Co.

RECZP.NAME RECIPIENT AFFILIATION REYES,L.A. Region 2 (Post 820201)

SUBJECT:

Submits SG tube plugging 15-day rept,per TS 4.4.5.5.a.Unit 3 SGs inspected from 981005-08.0ne SG tube located in Row 42, Column 55 plugged in SG 3B as'result of insp.

DISTRIBUTION CODE: ZEOlD COPIES RECEIVED:LTR I ENCL Q SIZE-TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD JABBOUR,K INTERNAL: AEOD/SPD/RAB 1 AEOD DEDRO 1 NRR/DRCH/HOHB 1 NRR/DRPM/PECB NRR/DRPM/PERB 1 NUDOCS-ABSTRACT OE DIR 1 OGC/HDS3 RGN2 FILE 01 1 EXTERNAL: LZTCO BRYCE,J H NOAC NRC PDR NUDOCS FULLTEXT C'

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION L ST.'R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROl DESK (DCD) ON EXTENSION 415-2083 t

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 0

OI:T 14 1998 L-98-256 I=Pt 10 CFR 50.36 Luis A. Reyes Regional Administrator U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303

Dear Mr. Reyes:

Re: Turkey Point Unit 3 Docket No. 50-250 The Turkey Point Unit 3 steam generators were inspected from October 5, 1998 through October 8, 1998. One steam generator tube located in Row 42, Column 55 was plugged in steam generator 3B as a result of the inspection. The tube was preventatively plugged due to mechanical wear at the anti-vibration bar. No defective tubes were identified in st'earn generators 3A, 3B, or 3C. This letter fullfills the reporting requirements as specified in Technical Specification 4.4.5.5.a.

Should there be any questions, please contact us.

Very truly yours, Sll R. J. Hovey Vice President Turkey Point Plant OIH cc: USNRC,'ocument Control Desk, Washington, D.C.

Senior Resident inspector, USNRC, Turkey Point Plant 98i0200272 9810i4 PDR ADOCK OM00250

),ol 8 PDR an fpL Group company

0 it