Informs That Util Proceeding W/Design & Will Commence Implementation of Fire Barrier Upgrades for Fire Zones.Util Will Aggressively Pursue Implementation of Thermo-Lag Fire Barrier Upgrades to Complete No Later than 991231
ML17354A980
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/15/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-151, NUDOCS 9806220249
Download: ML17354A980 (4)


Text

CATEGORY REGULA RY INFORMATION DISTRXBUTI SYSTEM (RIDS)

ACCESSION NBR:9806220249 DOC.DATE: 98/06/15 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.SAME'UTHOR AFFILIATION HOVEY,R.J. Florida Power S Light Co.

RECIP.NAME RECXPXENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that util proceeding w/design Ec will commence implementation of fire barrier upgrades for fire zones. Util will aggessively pursue implemetation of Thermo-Lag fire barrier upgrades to complete no later than 991231.

DISTRIBUTION CODE: A029D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA PD2-3 PD JABBOUR,K NRR/DE/EELB NRR/DRPW/PD3-1 NRR/DSSA/SPLB NRR/KUGLER,A RGN2 FILE EXTERNAL: NOAC NRC PDR D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL

Y (i

l "I

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fire Rating of Raceway Fire Barriers in the F' in T By letter L-96-318 dated December 12, 1996, Florida Power & Light Company (FPL) submitted a request for exemption from the requirements for raceway fire barriers in outdoor fire areas excluding the Turbine Building at Turkey Point Units 3 and 4. This letter also stated that an implementation plan would be provided to the NRC within 120 days of NRC approval of the exemption request.

By letter dated February 24, 1998, the NRC granted the FPL request for exemption for Fire Zones 47, 54, 113, 114, 115, 116, 118, 119, 120 and 143. Although the request for Fire Zone 106R was denied based on a horizontal distance of 10 feet separation, Fire Zone 106R is included in this implementation plan for protection of exposed cables required for safe shutdown. Accordingly, FPL is proceeding with the design and will commence implementation of the fire barrier upgrades for these fire zones. FPL will aggressively pursue implementation of these Thermo-Lag fire barrier upgrades to complete no later than December 31, 1999, in Fire Zones 47, 54, 106R, 113, 114, 115, 116, 118, 119, 120 and 143.

Should there be any questions, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH cc: Regional Administrator, Region II, USNRC g]( O Senior Resident Inspector, USNRC, Turkey Point Plant 9806220249 980615 PDR ADOCK 05000250 p PDR an FPL Group company