MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
~ CATEGORY 3Q REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9803170401 DOC.DATE: 98/03/05 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH.NAME . AUTHOR AFFILIATION HOVEY,R.J. Florida Power 6c Light Co.
RECIP . NAME RECIPIENT AFFILIATION REYES,L.A. Region 2 (Post 820201)
SUBJECT:
Forwards summary of results of SG tube inservice insp,per TS 4.4.5.5.b &. 6.9.2.Znsp occurred during end-of-cycle 15 on 970313-19.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES ZD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 0 INTERNAL: AEOD/SPD/RAB 1 1 Q4gTC. 1 1 DEDRO 1 1 FIL'E CENTER 1 1 NRR/DRCH/HHFB 1 1 R/'DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NUDOCS FULLTEXT 1 1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE LISTS DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 H
TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17
MAR OS tgg8 L-98-011 10 CFR 50.36 Luis A. Reyes Regional Administrator U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303
Dear Mr. Reyes:
Re: Turkey Point Unit 3 Docket No. 50-250 Steam Generator Tube Plugging In accordance with Turkey Point Technical Specification 4.4.5.5.b, the subject Special Report is submitted pursuant to Specification 6,9.2 as a result of the Turkey Point Unit 3 End-of-Cycle 15 inservice inspection of steam generator tubes.
The Turkey Point Unit 3 steam generators were inspected from March 13, 1997 through March 19, 1997. There were 3 steam generator tubes plugged in steam generator 3A as a result of the inspection bringing the total tubes plugged in steam generator 3A to 20. There were 9 steam generator tubes plugged in steam generator 3B bringing the total tubes plugged in steam generator 3B to 27. There were 2 steam generator tubes plugged in steam generator 3C bringing the total tubes plugged in steam generator 3C to 35.
The attached report summarizes the results of the steam generator tube inservice inspection.
.By letter L-97-084, dated March 27, 1997, FPL submitted the Turkey Poi,nt Unit 3 steam generator tube plugging 15 day special report summarizing the End-of-Cycle 15 tube plugging results. In the attachment to L-97-084, the three steam generator A tubes plugged specified the reason for plugging as defective per TS 4.4.5.4.a. The steam generator tube in location row 13, column 5, was preventively plugged as reflected in the attached report.
The change i.n classification for the steam generator tube does not affect the C-2 category classification, as defined in TS 4.4.5.2, for steam generator A.
Should there be any questions, please contact us.
Very truly yours, R. J, Hovey Vice President Turkey Point Plant Attachment OIH
~/(
cc: USNRC, Document Control Desk, Washington, D.C.
Senior Resident Inspector, USNRC, Turkey Point Plant 9803170401. 980305 PDR ADOCK 05000250 IIilllllllllllillilliiillliIilll(llilll 8 PDR
ATTACHMENT TO L-98-011 TURKEY POZNT UNZT 3 STEAM GENERATOR ZNSPECTZON REPORT
~ ~ ~
~ ~
'RH~~
RRRRRW
~
ERHRER5 0 REM RRRRRRH
~ ' ~ ~ ~
~ I '. i ~
~ ~
~ ~
ERIBIEESRZ54KRESERER
~ I ~ ~ ~
imigrd
~ I ~ I I I
~ ~
I
~ ~ (
~ s ~ ~ ~
L
~ ~ ~~ ~ '
~ C
~ 0 ~
~ C
CUMULATIVE DISTRIBUTION
SUMMARY
TURKEY POINT UNIT P 3 03/97 COMPONENT : S/G A Page Date : 05/12/97 Examination Dates : 03/13/97 thru 03/19/97 Total Number of Tubes Inspected .....: .-3197 Total Indications Between 204 and 394 6 (1)
Greater than or equal to 404 0 Total Corrosion type. Indications "VOL" 2 Total Tubes Plugged as Preventive Maint 1 Total Tubes Plugged 3 Location Of Indications 204 to 100% & "VOL" Hot Leg Cold Leg TSH .5 to 01H -2. 1 1 TSC .5 to 01C -2'.1 : 0 01H -2 0 to
~ 06H +2. 0 01C -2.0 to 06C +2.0 : 0 06H +2.1 to AV1 -3.1: .
0 06C +2.1 to AV4 -3.1 : 0 AV1 -3.0 to AV4 -3.0 : 6 (1)
IMOICATIOMS/TREMOINQ REPOR'T PTN-3 OUTACE : 03/97 COMPONENT : S/0 A Page :
OESCRIPTIOM : ALI. 20X TO 39X INOICATIONS Oate : 5/12/97 Time : 10:00:00
~ ~ ~ ~ ~ ~ ~ ~
I Extent 03/97 I I N/A I
'"I-"I-.I--
(Rou(Col (Leg(~~'I Tst/Note(
33( cl( c (
I.
ITEH I
Reel Ps(Ac006
( I Location "I-"--.-I--"""-"I -I Probe (A-720-H/ULc IAvl .0 (
(Volts fOeg(Ch
.9(
- I -I -
( X (P 2( 2cf IOI ff I I. I Location (volts(0eg(Ch I
I
-I---I-- I---.
I I
~
I I S,
(
(
I C ( (TEH PS(AC006 (A 720-H/ULC (AV3 .0 I .9( (P 2( 25( I I I I I 38( C5( C ( (TEH PS(AC007 (A.720.H/ULC IAV2 .0 ( 1.5( IP 2( 30( I I I I I
( 37( c7( c ( (TEH Ps(Ac012 (A-720-H/ULC fAv3 .0 ( .s( li 2( 22( I I I I
( 30( 52( H I (TEC PC(AH03C (A 720.H/ULC (AV3 .0 ( .4( (P 2( 20( I I I I 2s( 59( H f I s(AH021 (A-720.H/ULc IAv2 .0 .6( IP 2( 26(
(
+"
(SEC I--I -I- I"--" I"""--I--"---"I-(
I I I .I I" I I
I
""- I I I I
--(-" I.--
Nuaber of RECORDS Selected from Current Outage: 6 Nurber of fUSES Selected from Current Outage : 5
lNOlCATiONS/TRENDING REPORT PTN ~ 3 OUTAGE : 03/97 COHPONEHT : S/0 A Pege :
DESCRIPTION t ALL COX to 100X, VOl. C PTP lNOiCATIONS Dote . 5/12/97 Tice : 10:00:00
~ ~ ~ ~ ~ ~ y ~ ~ ~ ~ ~
I Extent I 03/97 I I H/A I
'"I" I- I" --"
IRoufcol ILegf '<<ITst/Hotel I I Reel Probe
--"-I""""..I I I locstion 3.0 IVoltSfgegfCh I 1.C f'119I IOifff Locstion
--" "" .I.-."I-"I "I-- I""I"-" -""-I""I.- I."'
X IVoltsfOegfCh I X I 13I 5I H ICHRIBAHTSHPL fAHOOZ IHRPC680.3C ITSH 1IPTPI
'f
~
I f 31I Tef H I I06H SCIAH039 IHPRC720-3C f06H 1 ~ 1 I 1 64l llvoLI I I I I I I CCI 36f C I I IAH037 IHPRC720 3C I I I IPTPI I I I I I
'I--I"I".I-I I Ruder of I C ICHRITSH RECORDS GTIAK037 I
INPRC720.3C
".--"I"-."-.-"I" Selected fran Current Outage:
ITSK 4
.7 I
f 1.2f 14f
.I. I TIVOLI I I I I
I I
I I
I I
I xunber of TUBES Selected frae Current Outege T
CUMULATIVE DISTRIBUTION
SUMMARY
TURKEY POINT UNIT g 3 03/97 COMPONENT: S/G B Page Date : 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected .....: --3196 I
Total Indicatiohs Between 204 and 394 7 '(1)
Greater than or equal to 404 1 Total Corrosion type Indications "VOL" 9 (2)
Total Tubes Plugged as Preventive Maint 2 Total Tubes Plugged 9 (2)
Location Of Indications 204 to 1004 &
"VOL<'ot Leg Cold Leg TSH -.5 to 01H -2.1 TSC .5 to 01C -2.1 01H -2.0 to 06H +2.0 01C -2.0 to 06C +2.0 06H +2.1 to AV1 -3.1 06C +2.1 to AV4 -F 1 0 AV1 -3.0 to AV4 -3 ' 7 (1)
IKOICAT IONS/TREHO IKO REPOR I PTH-3 OUTAGE : 03/97 COHPOHEHT t S/0 8 Page : 1 OESCRIPTION; ALL ZOX TO 3'HOICATIONS Oate : 5/12/97 Tl~ : 10:00:00 l Extent I 03/97 I ( N!A I (Leg(~"~(Tst/Note( Reel Probe Location (Volts (Oeg(Ch f 7. (Oi f I( Location (voltsfgeg feb ( z f (Row(Col
.(-- I --I.--I""-"I""""I.-."---.".(-.--.""-"f" "("-f-"(
f f I f ( I -I".I.---
( 32( 3A( C f fTEH PS(BC019 (A-720.H/ULC (AVI ~ 0 ( .7( (P 2( 23f I I I I (TEH PS(BC019 (A.720.H/ULC (AV3 -~1 1.3( (P 2( 31( f I I I
( ( f C ( (
( C ( (TEH IS(BC019 (A-720-H/ULC (AVC -.2 ' .7( (P 2( 22( ( I I I (
f 3t( 46( C f (TEH PC(BC009 (A-720-N/ULC (AV2 .0 ( 1.0f (P 2( 28( ( I I I I
( f C ( (TEH PC(BC009 (A-720.H/ULC (AV3 .0 ( 1.5( (P 2( 35( ( I I I (
f 3C( 51( C ( (TEH PS(BC011 (A-720.N/ULC (AVZ .0 f 1.2( (P 2( 29( f ( I ( ( I
-.3 1.7( '(P Zf 31(
42( 55(
'"("-I-.I--I-( C f (TEH
(
--"I-"---.I-PC(BC012 (A-720.H/ULC (AV3 f I (--(- (- I.--.I.
I I I I (
Hurdler of RECOROS Selected free Current Outage:
H~r of TUBES Selected froa Current Outage:
IkDICATIONS/TREkOINO REPORI PTN.3 OUTACE : 03/97 CONPONENT : S/0 8 Page : I DESCRIPTION .: ALL 40K to 100K, VOI. C PTP INDICATIONS Date , 5/'IZ/97 Tice t 10:00:00 I Extent f 03/97 N/A I
(Diff( Location I"- -"- I" --- I-- I" I--I-IRoufcol(Leg('~'ITst/Note( Ree( Probe Location fvolts(oeg(Ch I X fvoltsfoeg(Ch I R (
'-- I--I I I I
( I I I I -I-"I-- ~
I 37( Zof H ICHR('TSH PL(BH002 IHRPC680.3C ITSH .4 I 1-0(102( 1(VOL( ~
I 42( 38( H (cHRIOIHTBHPLIBH004 IHRPc680 3c ITBH 1.5 (
'l.2( 87( 1(vol.( I I I I I 39( 39( C ICHR(05H PL(BX043 IHRPC680-3C (05H .d I 2.3(125( l(VOL( I I I I I 44( 40( ~
C ICHRITSH PLIBH043 IHRPC680 3C ITSH .3 I 1.3( 46( 1(VOL( I I I I I C (PIT(TSH PL(BH043 IHRPC680 3C (TSH 1.8 ( .4( 6O( Pl I dZ( I I I I I I 23( 4'I I C ICHR(03C PCIBC031 (HRPC680 3C (03C .5 I .4( 93( 1(VOL( I I I I I
( 44( 41( C ICHR(TSH PL(BH043 fxRPC680-3C ITSH .2 ( 1.5(122( I fvoLI I I I I I
( ( I c (cHRITBH PL(BN043 (HRPc680.3c (TsH .4 (
1.'I I 90( 1(vol.(- I I I I I I C ICHRITSH PL(BN043 (HRPC680 3C (TSH .5 I .9( 83( l(VOLI I I I I I I 45I 411'C ILPHITEH PLIBC009 IA-720 H/ULC ITSH .6 I . I I IPTPI I I I I I 45( 42(' (LPHITEH PLIBC009 :IA.720.H/ULC ITSH 1.3 . (PIP( I
( ( I ( I I I (
I 41( 44( c (CHRITEH Number I I of I".
RECORDS I
OT(dxo43 I
I...I-- -"--"I-"I" (HRPc680-3c Selected fros Current Outage:
ITSH 12
.6 ( .3( 52'(
I 1(vol:(
I I (
"I I
I.
I I
I I
.I"--
I Nurher of TUBES Selected Iraa Current Outage : 9
CUMULATIVE DISTRIBUTION
SUMMARY
TURKEY POINT UNIT P 3 03/97 COMPONENT : S/G C Page Date: 05/12/97 Examination Dates : 03/13/97 thru 03/19/97 Total Number of Tubes Inspected ~ -3181 Total Indications Between 204 and 394 20 (1)
Greater than or equal to 40% 1 Total Corrosion type. Indications <<VOL<< 0 Total Tubes Plugged as Preventive Maint 1 Total Tubes Plugged 2 Location Of Indications 204 to 100% 6 <<VOL<<
'Hot Leg Cold Leg TSH .5 to 01H -2.1 TSC -.5 to 01C '-2.1 : 0 01H -2.0 to OGH +2.0 : 0 01C -2.0 to 06C +2.0 : 0 06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1 : 0 AV1 -3.0 to AV4 -3.0 : 20 (1)
INOICATIONS/TRENO!NC REPORT PTN 3 OUTAGE t 03/97 COHPONENT: S/0 C Page: I OESCRIP'TION". ALL ZI7A TO 39K INOICATIONS Oat e: 5/lz/97 Time: 10:00:00 I Extent I 03/97 I I N/A I
(Row(Col (Leg( I Tst/Note( Reel Probe Location (Volts fOeg fCh f S (Oifff I ocation (Vol tsfgeg(Ch f
-"I--I- I".I. I""---"I""""
( (
I
-I.-- J"-I.-.I. J I I I I 2,
f
( 30( 17( H I (TEc Ps(cx006 (A 720.H/ULc IAvl .0 .5( fi 2( zo( I I I I I
( 3L( 31( H ( ('TEC PSICNOZ7 (A-7ZO.H/ULC fAV2 .0 t sl IP zl 21( I I I I ( I I I I H I JTEC PSICH027 IA.720.H/ULC IAY3 .0 ~ sf JP z( zol I I I I I A3( 33( N I ITEc Pslcx026 JA-720.H/ULc IAv3 .0 I A( I>>I ZZI I I I I I
( 35f 36f N ( (TEC PSJCXOZ8 (A 720 H/ULC (AV2 .0 I sl I>>I 23t I I I I I I 3CI CIJ H I JTEC PSJCH029 (A.720-H/ULC IAV1 .0 I -6l JP zl zzl I I I I I I I I H I (TEC PSJCNOZ9 (A-720-H/ULC IAV3 ~ 0 .6( JP z( zz( I I I I I f f H f fTEC PSfCNOZ9 (A.72O.H/ULC fAVC .0 I 33( c3( x I ITEc Pc(cx030 (A-720 H/ULc IAv3 ~ 0 I 6I (P zl 27I I I I I I I I 35( c3( N ( ITEc Pclcx030 IA 720.H/ULc (Avz .0 I ~ 8( I>>I >> I I I I I I I f f I Ii f fTEC PCJCN030 'A.720.H/ULC IAV3 ~ .0 I.c( IP zl 3z( I I ( J I I I I K I ITEc PcICN030 IA-720-H/ULC IAYC .0 I .9( l>>(23( I t. t t I I 35( ccl H I ITEc Pctcxoso IA 720.H/ULc IAY2 .0 I 1.5l IP 2( 3c( I I I I I I ( I H I ITEc Pcfcx030 (A-720.H/ULc (AY3 .0 J 1.6( JP 2( 35I I I I I I 30( C8( H I (TEC (CH009 JA-720.H/ULC IAV2 .0 I I ~ 1( I>>I 32I I I I I I I f H ( (TEC PC(CN009 IA 720 H/ULC fAV3 .0 I I sl (>>I 37( I t I I ( t I 35( 49( C ( JTEH PSICC009 (A 720 H/UI.C JAVC .0 .6( Ii zl zsl I I I I I I 26( Ql H I (TEC JCN009 IA.720.H/ULC (Av2 .0 I sl I>>I zol I I I I I I
( 30( 61f H ( (TEC PSfCN009 fA-/ZO-H/ULC IAVZ .0 sl I>>(2 I I I 38( 71f C J (TEH PS(CC011 (A.720.H/ULC JAVC -.2 I 6l I>>l 23I I I I I
'I I
+ i( (ii I i( I I I .I .I . I
. o f if ~
Nutbar of RECORos seleccecf from current Outage: ZO Nuaber oi TUBES Selected free Current Outage : . 13
INOICATIONS/TRENOING REPORT PIN-3 OUTAGE: 03/97 COHPONENT : S/G C Page :
OESCRIPTION ~ : ALL COL to 100K, VOL C PTP INOICATIONS Oa te: 5/12/97 TI~: 10:00:00
~ 0 ~ ~
Extent I 03/97 I I N/A I
(
(Rou(Col(Leg(
'"(--(-
30( CB( K (
(
(Tst/Note(
(
(TEC
(-
Reel PL(CK009
'-"--(-
( probe (
(A 720 H/ULC (AV3 Location
.0 (volts(Oeg(CK
( (
( X (Ol f I(
-(" (- (""(
Location (Volts(0eg(Ch I
I I I
( S
(.-.I--.
.6 .A(103(P 1( Sdf
( 33( 66(
-- (
C (PIT(TSM I
PL(CNOCT (HRPC680 3C
-I- -I.-"-"("---.I -----.-"(-"----"--(--I- (".I.
~~
(TSN (
I
(
I I
I
" ("(
I I I
(" ~
NUrbtr of RECOROS Selected fraca Current Outage: 2 Number of TUBES Selected frea Current Outage: 2
'F