Forwards Revs to EPIPs 0-EPIP-20132, Technical Support Ctr (TSC) Activation & Operation & 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training. Description of Revs,Attached
ML17354A568
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/03/1997
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354A569 List:
References
L-97-170, NUDOCS 9707110044
Download: ML17354A568 (5)


Text

P 71 Vg&AZlV' REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9707110044 DOC.DATE: 97/07/03 . NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION ol Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revs to EPIPs O-EPIP-20132, "Technical Support Ctr (TSC) Activation & Operation" & " O-EPIP-20201, ."Maintaining Emergency Preparedness Radiological Emergency Plan Training." Description of revs, attached.

DISTRIBUTION CODE: A045D TITLE: OR COPIES RECEIVED:LTR Submittal: Emergency Preparedness I ENCL i SIZE: 4 Plans, Implement'g Procedures, 70 C T

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL . ID CODE/NAME LTTR ENCL 0 PD2-3 LA 1 1 PD2-3 PD 1 1 CROTEAU,R 1 1 R INTERNAL: AEOD/HAGAN,D 1 1 FILE CENTER 0 2 2 NRR/DRPM/PERB 1 1 UDOCS-"A'BSTRACT 1 1 "XTERNAL: NOAC 1 1 NRC PDR 1 1 N

NOTE TO ALL "RIDS" RECIPIENTSS PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5 (EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL  : 10

JUL 3 1997 L-97-170 10 CFR 50.54(q) 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission

, Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revised Emer en Plan Im lementin Procedures Pursuant to the requirements of 10 CFR 50.54(q), and 10CFR50 Appendix E, enclosed is one copy each of revised Emergency Plan Implementing Procedures O-EPIP-20132, "Technical Support Center (TSC) Activation and Operation," and O-EPIP-20201, "Maintaining Emergency Preparedness-Radiological Emergency Plan Training." Attached is a description of the changes to the EPIPs.

The implementation date for these revised procedures was June 25, 1997. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.

Should there be any questions, please contact us.

Very truly yours, oi R. J. Hovey Vice President Turkey Point Plant CLM Attachment Enclosures cc: Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure)

'rr707if0044 970703 PDR ADQCK 05000250 F PDR llllllllllllllllllllllllllllllllllllllll an FPL Group company'

Attachment to L-97-170 Page 1 of2 0-EPIP-20132 has been revised to include criteria for Severe Accident Management Guidelines (SAMG's) and to incorporate critique comments from the Evaluated Exercise conducted May 13 and 14, 1997. Changes include the following:

SAMG criteria have been added to the procedure. The procedure directs the TSC Supervisor to assign a member of the TSC Technical Support Group to monitor Core Exit Thermocouples (CET's). The procedure step reads as follows, "IfCET's are greater than 1200'F and actions to cool the core are not successful, consult with the TSC Operations Manager and the EC to implement SAMG's." In the event the TSC Supervisor is not present in the TSC, the TSC Reactor Engineer has the responsibility for monitoring the SAMG criteria.

The Team Request Form has been deleted. Speed memos may now be used to request information applicable to recovery teams. The Team Tracking Board will be modified to include all applicable information from the Team Request Form. Guidance has been added to the procedure to provide for better tracking of teams, and to provide instructions on the use of the Team Tracking Board and TSC Maintenance Manager logbook for tracking teams.

The TSC Operations Manager will now instruct the Control Room Communicator to monitor the radio channel in use by the field operators once notification/communication duties are turned over to the TSC. This will allow the Control Room Communicator to provide team status to the Control Room stafF.

O-ADM-207, "Operations Instructions in the Event of a Situation Not Addressed by Procedure," has been referenced in the procedure to provide guidance for 50.54(x) procedural deviations. Guidance for coordination of 50.54(x) procedural deviations has been included within the TSC Operations Manager and TSC Lead Engineer responsibilities.

The TSC Licensed Operator Support has been given the responsibility for monitoring the status of the unafFected unit and reporting any operational concerns or Technical Specification issues to the TSC Lead Engineer and the TSC Operations Manager.

Procedural steps have been added to allow the ENS Communicator to discontinue the completion of the Event Notification Worksheet once a continuous line of communication has been established with the NRC. Both the ENS and HPN Communicator have instructions to record information transmitted via an open line in the logbooks.

The procedure also includes other editing and minor clarification changes.

Attachment to L-97-170 Page 2 of2 0-EPIP-20201 has been revised to clarify SAMG training requirements for emergency response personnel. A note has been added to reference the Supervisor Fitness For Duty requirement for emergency responders. The Emergency Preparedness Coordinator has been given the responsibility for approval of Emergency Preparedness Lesson Plans and training schedules. The procedure also includes other editing and minor clarification changes.