MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
CATEGORY 1 REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR:9705060120 DOC.DATE: 97/05/01 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME HOVEY,R.J.
RECIP.NAME AUTHOR AFFILIATION Florida Power a Light Co.
RECIP1ENT AFFILIATION q+z~a ~ x<8yi~g Document Control Branch (Document Control Desk)
SUBJECT:
Forwards newly issued EPIP O-EPIP-20110, "Criteria for of Owner Controlled Area Evacuation." Predecessor to s'onauct C
subj"procedure was EPIP-20110.New procedure includes diagram of alt'ernate evacuation route for nonradiological hazards.
DISTRIBUTION CODE: A0450 COPIES RECEIVED: LTR l ENCL J SIZE: I T TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, C E
NOTES:
RECIPIENT COPIES RECiPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU R 1 ~
1 INTERNAL: AEOD/HAGAN,D 1 1 ILE CENTER 2 2 NRR/DRPM/PERB 1 1 N 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
0 E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED OM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CON ACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9
t f
MAY L-97-119 I 1997 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Emer enc Plan Im lementin Procedure In accordance with the requirements of 10 CFR 50, Appendix E, enclosed is one copy of newly issued Emergency Plan Implementing Procedure O-EPIP-20110, "Criteria for and Conduct of Owner Controlled Area Evacuation."
The predecessor to this procedure was EPIP-20110. The new procedure number is 0-EPIP-20110. The primary reason for the change was to upgrade the format of the old procedure. The new procedure also includes a diagram of an alternate evacuation route for non-radiological hazards, and includes some editorial changes. Old procedure EPIP-20110 has been canceled.
The implementation date for O-EPIP-20110, and the cancellation date for EPIP-20110, is April 24, 1997. FPL has determined that the changes described do not result in a decrease in the eQectiveness of the Emergency Plan.
Should there be any questions, please contact us.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant Cho)5 i CLM Enclosure cc: Luis A Reyes, Regional Administrator, Region II, USNRC (2 copies)
T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure) 9705060i20 97050%
PDR ADOCK 05000250 DR an FPL Group company
f J
,,~r a f
~ e v
e n
FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 ANO 4 EMERGENCY PLAN IMPLEMENTING PROCEOURE 20110 OCTOBER 17 1991
1.0 Title
CRITERIA FOR ANO CONDUCT OF OWNER CONTROLLED AREA EVACUATION 2.0 A royal aod List of Effective Pa es:
t
- 2. I A~rural:
Oi and Approved by Plant Manager - N: 10 17 91 Periodic Review Oue: 6.18 92 Implementation Oate: 10 28 91 2.2 List of Effective Pa es:
Pacae Oate ~Pa e Oate ~Pa e Oate 1 10/17/91 4 10/17/91 7 10/17/91 2 10/17/91 5 10/17'/91 8 10/17/91 3 10/17/91 6 10/(1'91 9 10/17/91 v
3.0 ~Sco e:
3.1 ~Pur ose:
This procedure provides criteria for evacuating the owner controlled area, instructions for implementing an orderly', rapid and safe evacuation of the Turkey Point Ow er Controlled Area 'and instructions for personnel accountability.
3.2 Oiscussion
v 3.2.1 The accurate classification of an emergency at the Turkey Point Plant is necessary to enable the Emergency Coordinator to take the pr'oper corrective actions.
)
RTSs 86-1579, 88-0180, 88-1573, 89-2085, 90-0559, 90-2940, 91-3141 Ph.~- ~>/s?(/-C/ff Sp l f ' P ~
l Pg J
~l'
10/17/91 EMERGENCY P IMPLEMENTING PROCEDURE 20110, P 2 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION 3.2.2 Evacuation of the Owner Controlled Area may be necessitated by the occurrence of any of several events where minimize site personnel's it would be necessary to exposure to radiation. An Owner Controlled Area evacuation will be conducted for any General Emergency and is discretionary for a Site Area Emergency. (See Precaution Section).
3.2.3 The U. S. Air Force will handle its own personnel accountability by normal military procedures. An agreement is in effect between the Company and the U. S. Air Force wherein the U. S. Air Force, through Homestead Air Force Base, will assist in the evacuation of personnel in the area south and east of the Protected Area.
it 0 3.2.4 The Community Services Department shall advise groups which schedules or permits to use the recreation areas of the requirement to evacuate when'otified by the Security Force.
has modified the appropriate This department permit forms to include this requirement.
3.2.5 Activities and functions which take place within the Owner Controlled Area but outside of the Protected Area are the responsibilities of the Land Utilization 'Site Superintendent. Day-to-day supervision of Owner Controlled Area functions outside the Protected Area, including scout camps, recreation areas and liaison with the U. S. Air Force School, and Belcher Oil Company are handled by the Land Utilization Site Superintendent.
3.2.6 'ecurity, Land Utilization Site Superintendent and Escorts shall maintain control of groups or individuals to which they are assigned. This control enables all members of the groups to be located, notified and evacuated.
3.2.7 Supervisors of contractor operations with crews working in remote areas of the Owner Controlled Area, such as the cooling canal system, shall maintain adequate communications with work crews to enable evacuation instructions to be carried out.
3.2.8 The Security Shift Specialist or his designee should maintain the FPL Boat Ramp Log for each boat admitted to the ramp area.
Information on this form will assist in accounting for and controlling re-entry of boats and personnel who may be outside of the Owner Controlled Area when an evacuation is ordered.
3.3 ~Author)t:
This procedure implements the Turkey Point Plant Radiological Emergency Plan.
0 x~ r-tP'-
lp II P
f(
10/17/91 EMERGENCY PL i IMPLEMENTING PROCEDURE 20110, P 3 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION
3.4 Definitions
3.4.1 Protected Area The area within the Owner Controlled Area occupied by the two nuclear units and their associated equipment, enclosed within the Protected Area fence.
3.4.2 Offsite Assembl Area I The Assembly Area for personnel and visitors evacuated from the II Owner Controlled Area. The Florida City Substation, located approximately seven and one-half miles west of the plant on Old Palm Qi Drive (See Attachment 1) is the alternate assembly West Perimeter Road.
area primary Offsite Assembly Area. An is available on the Cooling Canal System 3.4.3 Owner Controlled Area That portion of FPL property surrounding and including the plant which is subject to limited access and control by FPL.
3.4.4 Owner Controlled Area Evacuation The evacuation from the Owner Controlled Area of all personnel except those required to place Units 1, 2, 3 and 4 in a safe condition, the emergency response teams, and the security officers necessary to fulfill their evacuation responsibilities. The evacuation will include personnel at the Scout Camps, Air Force Sea Survival Training School, the recreation areas, and the cooling canal system.
3.4.5 Primar Evacuation Route This is the main evacuation route to be used to evacuate personnel from the Owner Controlled Area radiological conditions permitting.
This route uses the plant access road west to Palm Drive, continuing west on Palm Drive approximately 7 miles to Farm Life School Road, south on Old Palm Drive then west approximately 100 yards to 'urning the Florida City Substation.
3.4.6 Alternate Evacuation Route This is the evacuation route to be used to evacuate personnel when radiological conditions prohibit the use of the Primary Evacuation Route. This route uses the road north of the main discharge canal from the plant (Lake Warren), continuing west past contractor entrance road through the access gates of the cooling canals continuing past the north end of the cooling canals, turning south along the west perimeter road of the canals for approximately four (4) miles to the Alternate Assembly Area, turning west to 'the Levee 31 Access Road then south to Card Sound Road.
)k pl t h
10/17/91 EMERGENCY PLA IMPLEMENTING PROCEDURE 20110, PAGE 4 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION
.0 Precautions:
- 4. 1 Every effort shall be made to minimize personnel exposure to radiation.
4.2 The Emergency Coordinator shall consider plant and radiological conditions as it relates to the emergency prior to ordering an evacuation. As conditions warrant, the Emergency Coordinator may delay, postpone, or make special requirements on the evacuation. Some examples of special circumstances are as follows:
4.2.1 Radiological conditions (puff releases) where large doses may be received during an evacuation.
Q, 4.2.2 4.2.3 Security events where unknown hazards or dangers are perceived.
Plant conditions where additional personnel are necessary to put the plant in a safer configuration (i.e., equipment hatch open, primary system open for repair, etc.)
4.2.4 Onsite hazards such as toxic gas, fires, or explosions where the movement of personnel would be placing them in additional risk.
4.2.5 Other similar events.
The Emergency Coordinator should consider the event with regard to duration of release, plant conditions, and meteorological information prior to determining if special instructions should be given (retention of additional essential repair personnel, an alternate evacuation route, or in place onsite sheltering).
5.0 Res onsibilities:
5.1 The Emergency Coordinator is responsible for performing evacuation instructions per EPIP-20101, Duties of the Emergency Coordinator.
5.2 The Security Force is responsible for implementing evacuation of the Owner Controlled Area per this procedure and Security Force Instruction 6307.
5.3 The TSC Health Physics Supervisor is responsible for ensuring emergency equipment is available at the Alternate Offsite Assembly Area as the Alternate Evacuation Route is used.
needed, if
g'l 4
10/17/91 EMERGENCY PLA IMPLEMENTING PROCEDURE 20110, PA 5 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION
.0 References Commitment Documents 6.1 References 6.1.1 Turkey Point Plant Radiological Emergency Plan 6.1.2 Off-Site Emergency Organization EPIP 1104, Duties of the Emergency Security Manager
- 6. 1.3 Turkey Point Plant Physical Security Plan and Security Force Instructions 6.1.4 10 CFR 50 Appendix E, Emergency Plans for Production and Utilization Facilities
- 6. 1.5 EPIP-20101, Duties of Emergency Coordinator
- 6. 1.6 EPIP-20104, Duty Call Notification/Staff Augmentation 6.1.7 EPIP-20109, Criteria for and Conduct of Local Evacuation
- 6. 1.8 EPIP-20127, Duties of the Offsite Assembly 'Area Supervisor 6.1.9 Security Force Instruction 6307, Emergency Evacuations 6.2 Commitment Documents 6.2.1 None
.0 Records and Notifications:
7.1 Records 7.1.1 Significant records of personnel accountability inside the Protected Area shall be forwarded to the Emergency Preparedness Supervisor for transmittal to guality Assurance records section.
7.2 Notifications 7.2.1 The Security Team Leader shall notify the On Shift Security Force, U.S. Air Force School, and Land Utilization of the Owner Controlled Area Evacuation initiation.
7.2.3 The Land Utilization Site Superintendent shall notify their respective groups that a site evacuation has been ordered. In the absence of Land Utilization personnel, the Security Force shall assume this responsibility.
l t2 l 4 e'
10/17/91 EMERGENCY PLA IMPLEMENTING PROCEDURE 20110, PA 6 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION 0 Instructions:
CAUTION: The Emergency Coordinator shall consider plant and radiological conditions as it relates to the emergency prior to ordering an evacuation. If large doses will be received during an evacuation, personnel it may be more effective to shelter non-essential onsite. As conditions warrant, the Emergency Coordinator may delay, postpone, or make special requirements on the'vacuation. Some examples of special circumstances are listed in the Precautions section of this procedure.
- 8. 1 Owner Controlled Area Evacuation Criteria 8.1. 1 The Owner Controlled Area shall be evacuated upon declaration of a 0 8.1.2 General Emergency.
If a Site Area Emergency has been declared, an Owner Evacuation should be initiated at the discretion fo the Emergency Controlled Area Coordinator based on Radiological and/or Plant Conditions.
8.2 Evacuation Pre aredness 8.2. 1 Upon the decision to evacuate the Owner Controlled Area, the Emergency Coordinator will implement the evacuation preparedness steps outlined in EPIP-20101, Duties of the Emergency Coordinator.
8.3 Evacuation Im lementation 8.3.1 When the Emergency Coordinator determines that an evacuation of the Owner Controlled Area is necessary, he shall, in following EPIP-20101, Duties of the Emergency Coordinator, order an Owner Controlled Area evacuation using the plant page and the evacuation alarm.
8.3.2 Upon hearing the evacuation order or alarm, all Emergency Response Organization personnel (primaries and alternates) shall:
- 1. Complete tasks necessary to stabilize the Plant as directed by the Emergency Coordinator.
- 2. Report to the appropriate Emergency Response Facility for further assignments.
- 3. If released from emergency duties by the cognizant supervisor, proceed in accordance with direction given by the supervisor.
t)
'es
10/17/91 EMERGENCY P IMPLEMENTING PROCEOURE 20110, PA 7 CRITERIA FOR AND CONOUCT OF OWNER CONTROLLEO AREA EVACUATION 8.4 Evacuation Routes 8.4. 1 The following routes should be used as directed by the Emergency Coordinator and/or Security (reference Attachment 1):
- 1. The Primary Evacuation route.
NOTE: Access along the Levee 31 Road requires plant security to unlock a series of gates along this route. Calmly wait in vehicles until security has unlocked the access gates to the Levee 31 Road.
- 2. The Alternate Evacuation route.
- 3. By boat, east and north in Biscayne Bay to Cutler Plant.
8.5 Securit Force Evacuation Im lementation 8.5.1 Upon notification of the Owner Controlled Area evacuation, the Security Shift Specialist shall:
- 1. Implement Security Force Instruction '6307.
- 2. Perform notifications in accordance with Security Force Instruction 6307 and this procedure.
- 3. Report accountability results (list of personnel in Protected Area not accounted for) to the Emergency Coordinator within 30 minutes from the time the site evacuation was declared.
- 4. Ensure that the Offsite Assembly Area Supervisor is dispatched from the OSC.
8.5.2 The Security Shift Specialist, after completion of sweeps by members of the Security Force, shall instruct Security personnel concerning special assignments which may be required as a result of the evacuation. He shall advise the Emergency Security Manager of any circumstances which require his attention, including boats at sea launched from Turkey Point, enabling the Emergency Security Manager to relay the information to the U. S. Coast Guard and/or Marine Patrol.
~
Qj
10/17/91 EMERGENCY PL IMPLEMENTING PROCEDURE 20110, PAU 8 CRITERIA FOR AND CONDUCT OF OWNER CONTROLLED AREA EVACUATION 8.6 Im lementation of the Alternate Evacuation Route 8.6.1 If the decision is made to utilize the alternate evacuation route, a security officer or designee shall obtain the key to the South Florida Water Management, Levee 31 road gates and immediately proceed to unlock the Levee 31 Road gates.
8.6.2 Security should provide traffic control on the alternate evacuation route.
8.6.3 The TSC Health Physics Supervisor should ensure Health Physics emergency equipment is available at the Alternate Off-Site Assembly Area, as needed.
0 P'
I Q)y l
0
U.S.¹1 n
X7 W ~
~
~~0 0 Dl OFF SITE O~
~n ASSEMBLYAREA FLORIDA CITY SUBSTATION FARM LIFE
~yp pqO n n~ I 0
TALMA ASSEE ROAD o> rn 137 AVE PRIMARY EVACUATION ROUTE
'Q
( no Kl I
O onPl
~D oo ALTERNATE OWNER CONTROLLED AREA o ~ Pl 117 AVE OFF SITE ASSEMBLYAREA ALTERNATE oo UTTLE SCAR EVACUATION CARD SOUND
~ aa ROUTE mo
~ ea
~
COOUNG CANALS C
o CARDSOUND TURKEY BISCAYNE BAY POINT o SITE EVACUATION ROUTE
Oi