ML17353A893

From kanterella
Jump to navigation Jump to search
Forwards Response to Request for Addl Info Re NRC Bulletin 96-001, Control Rod Insertion Problems.
ML17353A893
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/24/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-96-001, IEB-96-1, L-96-231, TAC-M95012, TAC-M95013, NUDOCS 9609300291
Download: ML17353A893 (9)


Text

CATEGORY 1 REGULA1l INFORMATION DISTRIBUTIOlYSTEM (RIDE)

ACCESSION NBR:9609300291 DOC.DATE: 96/09/24 NOTARIZED: YES DOCKET FACIL:5p-$ 50 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-,!! 5i Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power'6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to request for addi info re NRC Bulletin 96-001, "Control Rod Insertion Problems."

DISTRIBUTION CODE: IE57D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: NRC Bulletin 96-01 Control Rod Insert1on Problems NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DRPW/PD4-2 1 1 PD2-3 PD 1 1 CROTEAUFR 1 1 R

INTERNAL: AEOD 1 1 FILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 NR 1 1 RES 1 1 SPA/SR'RC EXTERNAL: NOAC 1 1 PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 "

ENCL- 10

L

,ai',,",N'

4 pp PI%I SEP 24 ~ggg L-96-231 10 CFR 550.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Bulletin 96-01 CONTROL ROD INSERTION PROBLEMS (TAC NOS. M95012 AND M95013)

NRC Bulletin 96-01, "CONTROL ROD INSERTION PROBLEMS", issued March 8, 1996, requested licensees take specific actions and"provide information to the NRC. In accordance with the bulletin, Florida Power and Light Company provided responses L-96-082 dated April 05, 1996, and L-96-107 dated May 01, 1996. In a letter to T. F. Plunkett from R. P. Croteau dated August 22, 1996, the staff requested additional information to support the review of NRC Bulletin 96-01 responses.

Attached is the requested information.

Should there be any questions, please contact us.

u g8~

W. H. Bohlke Vice President Nuclear Engineering and Licensing Turkey Point Plant JAH, Attachment cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant n -,n @PA

~IJfiQCJV 960930029ii 960924 PDR ADOCK 05000250 8 PDR

Ef 1

il

STATE OF FLORIDA )

) ss.

COUNTY OF DADE )

being first duly sworn, deposes and says:

That he is of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

W. H. Bohlke Subscribed and sworn to before me this day of Se Aee-, 1996.

Name of Notary Public (Type or Print)

NOTARY PUBLIC, in and for the County of Dade, State of Florida OLGA HAMEK

-": A:.aa ~COMMtSStoN l CC SSZr42 No..

EKPlRES: June 18, Imo My Commission expires ~WC /~ Quoo ~+<eeoc ++M thll I++jlPg@ Qg~~

Commission d '7V W. H. Bohlke is personally known to me.

, ~

I 1>> H Il Pp

<I I

Attachment FPL Turkey Point Unit 4 EOC-15 RCCA Drag Test L-96-231 Page1 of 2 Fuel Core Assembly RCCA RCCA DRAG CRITERIA Assembly Location Bumup DASHPOT (100 lbs.) GUIDE THIMBLE (40 lbs.)

MWD/MTU INSERTION WITHDRAWAL INSERTION WITHDRAWAL PASS FAIL COMMENT PASS FAIL COMMENT PASS FAIL COMMENT PASS FAIL COMMENT SS09 M-10 47,900 R59 <50 lbs. X 52 lbs. <20 lbs. <20 lbs.

TT37 B-10 26,000 R63 <50 <50 c20 c20 TT50 G-13 31,600 R109 X <50 <50 c20 c20 TT45 J-13 31,600 R52 <50 <50 c20 <20 SS45 43,800 R58 <50 <50 <20 <20 TT42 P-10 26,000 R61 <50 <50 c20 <20 TT38 F-14 26,000 R53 <50 <50 c20 SS08 K-12 47,900 R55 <50 <50 <20 <20 TT39 K42 26,000 R91 <50 <50 <20 <20 SS46 L-05 43,800 R81 <50 <50 c20 <20 Tl41 P-6 26,000 R76 <50 <50 <20 c20 B-6 26,000 R80 <50 <50 c20 <20 SS33 L-7 42,000 R75 <50 <50 c20 c20 TT51 J-3 31,600 R89 <50 <50 23 c20 SS48 E-5 43,800 R85 <50 <50 22 c20 SS07 F-4 47,900 R88 69 69 62 62 SS15 D-10 47,900 R62 75 75 62 62 SS42 E-9 42,000 R101 X 56 49 49 SS01 F-12 47,900 R56 59 59 50 SS02 D-6 47,900 R79 52 50 46 '648 TT49 G-3 31,600 R90 58 52 41 SS35 L-9 42,000 R65 <50 <50 <20 42 TT24 F-8 34,300 R71 <50 <50 42 42 TT31 H-6 34,300 R78 <50 <50 28 42 SS10 M-6 47,900 R77 X 70 70 46 40 TT27 D-8 34,000 R72 55 52 40 40 Tr23 K-8 34,300 R69 <50 <50 36 40 TT46 C-7 31.600 R74 X <50 <50 31 40 Tl48 C-9 31,600 R67 X 52 52 40 39 SS06 47,900 R86 <50 <50 34 32 SS36 E-7 42,000 R93 <50 <50 30 31 SS30 G-11 42.000 R84 <50 <50 24 31 TT30 34,000 R87 <50 <50 25 30

Attachment FPL Turkey Point Unit 4 EOC-15 RCCA Drag Test L-96-231 '.

Page 2of 2 Fuel Core Assembly RCCA RCCA DRAG CRITERIA Assembly Location Bumup DASHPOT (1 00 lbs.) GUIDE THIMBLE(40 lbs.)

MWD/MTU INSERTION WITHDRAWAL INSERTION WITHDRAWAL PASS FAIL COMMENT PASS FAIL COMMENT PASS FAIL COMMENT PASS FAIL COMMENT TT40 F-2 26,000 R92 <50 lbs. X <50 lbs. <20 lbs. X 29 lbs.

G-5 42,000 R83 <50 <50 28 28 TT21 H-12 34,000 R54 <50 <50 29 27 SS38 J-11 42,000 R66 <50 <50 27 27 SS47 E-11 43,800 R57 <50 <50 <20 23 SS37 J-5 42,000 R82 <50 <50 28 23 TT20 34,000 R68 <50 <50 21 23 TT47 N-9 31,600 R64 <50 <50 <20 22 K-14 26,000 R51 <50 <50 <20 22 TT52 = N-7 31,600 R73 <50 <50 22 22 TT26 H-10 34,300 R60 <50 <50 26 20 RR05 H-8 50,800 R70 <50 <50 20 20

k ~

~ f~