Responds to RAI Re Four Relief Requests for Third Ten Year Interval Inservice Inspection Program
ML17353A848
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/08/1996
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-188, NUDOCS 9608150038
Download: ML17353A848 (4)


Text

REGULATE. INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION /BR:9608150038 DOC.DATE: 96)08/08 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMc. AUTHOR AFFILIATION HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION vs Document Control Branch (Document Control Desk)

SUBJECT:

Responds to RAI re four relief requests for third ten year TITLE: OR interval Inservice Inspection DISTRIBUTION CODE: R047D Program.

COPIES RECEIVED:LTR Submittal: Ins'ervice/Testing/Relief from g ENCL j SIZE:

ASME Code GL-89-04 E

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA ,1 1 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RAB 1 1 1 1 1 NRR/DE/ECGB 1 1 NRR/DE/EMCB 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC, 1 '1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL'4

AUG 08 1996 L-96-188 10 CFR 550.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inservice Inspection Program Response to Request for Additional Information By letter L-95-237, dated December 14, 1995, Florida Power and Light -Co. submitted four relief requests for the Turkey Point Units 3 and 4 third ten year interval Inservice Inspection Program. As requested by NRC staff members, attached is the response to the request for additional information.

Should there be any questions concerning this response, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC