ML17349A884

From kanterella
Jump to navigation Jump to search
Documents FPL Decision to Invoke Code Case N-416, Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping. Forwards Figures 1-6
ML17349A884
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/17/1993
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-139, NUDOCS 9306030113
Download: ML17349A884 (12)


Text

ACCKI.ERATO DOCUMENT DISTRIBVTION SYSTEM REGULAT~ INFORMATION DISTRIBUTIONSYSTEM (RIDE)

ACE.'ESSION NBR:9306030113 DOC.DATE: 93/05/17 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Documents FPL decision to invoke Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping." Forwards figures 1-6.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 1 1 RAGHAVAN,L 2 2 INTERNAL: NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OC/J EHB 1 0 OGC/HDS3 1 0 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EG&G BROWNFB 1 1 EG&G RANSOME F C 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 11

P.O. Box 029100, Miami, FL, 33102-9100 ltd 17 1%3 L-93-139 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inservice Ins ection Pro ram This letter documents Florida Power and Light Co.'s (FPL) decision to invoke Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping," as discussed in Regulatory Guide (RG) 1.147 foz the Class 2 component steam generators up to the first isolation valve. Attached Figures 1 through 6 define the steam generators'oundary for applicability of Code Case N-416 for Turkey Point Units 3 and 4. There will be no deviations from the requirements of. Code Case N-416.

By FPL letter L-93-60, dated March 10, 1993, FPL informed the NRC that the Turkey Point Units 3 and 4 Insezvice Inspection Program invokes Code Case N-498, "Alternative Rules for 10 Year Hydrostatic Pressure Testing for Class 1 and 2 Systems,Section XI, Division 1," as discussed in RG 1.147. Code Case N-498 requires a hydrostatic pressure test after replacement and repairs for Class 1 and 2 systems.

Ultrasonic inspections were conducted on the Turkey Point Unit 4 steam generators'eedwater nozzle to reducer weld joints. The inspections identified cracks originating in the weld root and propagating into the reducer base material for all three steam generators. FPL is currently replacing the Turkey Point Unit 4 feedwater reducers on all three steam generators.

Code Case N-416 allows deferral of the required hydrostatic pressure test for repairs or replacements to the next regularly scheduled ten-year hydrostatic test The ten-year hydrostatic pressure test for the Turkey Point Unit 3 steam generators was completed on September 24, 1992. The ten-year hydrostatic pressure test for the Turkey Point Unit 4'steam generators was completed on April 18, 1993. The next scheduled ten-year hydrostatic pressure test will be performed at the end of the third inspection interval for each unit. The end of the third inspection interval for Turkey Point Unit 3 is February 21, 2004. The end of the third inspection interval for Turkey Point Unit 4 is April 15, 2004.

9'3060305 13 930517 PDR *DOCK 05000250

'8 PDR on FpL Group company

1 jl

  • N I

he

L-93-139 Page 2 of 2 In accordance with Code Case N-416, both a post-repair visual leak test at operating pressure will be performed, and a full volumetric examination, consisting of one hundred percent radiographic testing and ultrasonic testing, will be performed for the reducer replacement.

Should there be any questions concerning the above information, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/OIH/oh attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC R. C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

FIGURE 1 MOV-3-1400 3-10-124 cv n0 g RV-3-1403 0

3-10-121 0I I O 0 O I I RV-3-1401 Ol PRESSURE TEST PARAMETERS PSIG F I DES1GM 1085 600 I OPERATNG 745 555 HYDROSTATIC 1356 <<>60 POV-3-2604 P 26 A 3-10-107 SGWL-3-022 RV-3-1400 3-10-101 3-10-148 RV-3 1402 3-10-139 3-10-100 3-10 147 3-10-143 3 10-150 3-10-156 3-10-152 3-10-154 Ill

~~

IA IA Oi-I O I I n1>>

I n I O Y)

I 3-20-723 SGB-3-001 SGB-3-002 7A 3-20-134 3-20-139 SGWL-3-007 3-20-679 3-20-132 3-20-133 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 3 "A STEAM GENERATOR DATE: 09/16/91 TEST g: 03-SG-7104-H REVISION DRAWN BY: DRAWING NUMBER:

1 ISI GROUP 7104

FIGURE 2 MOV 3 1401 RV-3-1408 3-10-221 6

PRESSVRE TEST PARAMETERS nI I I RV-3-1406 Oi v> CV PSIG F I O

0ESICM 1085 600 I OPERATlNC 745 555 Vl HYOROSTATIC 1356 <<>60 POV-3-2605 P 248 3-1 0-207 SCWL-3-028 RV-3-1405 3-10-201 248 RV-3-1407 3-10-200 247 3-10-243 3-10-250 3-10-256 3-10-252 3-10-701 3-10 254 I

O I

3-20-728 SCB-3-004 3-20-234 3-20-239 SCWL-3 025 3-20-683 3-20-232 3-20-233 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 3 'B STEAM GENERATOR DATE: 07/23/92 TEST IT: 03-SG-7105-H REVISION DRAWN BY: DRAWING NUMBERI 1 ISI GROUP 7105

FlGURE 3 MOV-3-1402 RV-3-1413 3-10-321 0I 0 0 PRESSURE TEST PARAMETERS I I RV-3-1411 0 0I 0I DESIGN 1085 600 I OPERATING 745 555 I vl V)

H'IOROSTATI0 1356 ~>60 POV-3-2606 P 24C 3-10-307 SGWL-3-046 RV-3-1410 3-10-301 348 RV-3-1412 3-10-300 347 3-10-343 3-10-350 3-10-356 3-10-352 3 10 354 el' 0ln I

I I

v7 3-20-733 SGB-3-006 GB-3-005 P-2 TC 3-20-334 3-20-339 SGWL-3-042 3-20-687 3-20-332 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 3 "C" STEAM GENERATOR DATE: 09/16/91 TEST III: 03-SG-7106-H REVISION DRAWN BY: DRAWING NUMBER:

1 ISI GROUP 7106

FIGURE 4 MOV-4-1400 CV Vl RV-4-1403 O 0 O I I I I 10-4-121 O O PRESSORE TEST PARAMETERS I I I RV-4-1401 Ok O

PSIG F O I I O DESIGN 1085 600 I OPERATING 745 555 'tI HYDROSTATIC 1356 m>60 POV-4-2604 P 26A SGWL-4-022 4-10-107 RV-4-1400 4-10-101 4-10-148 RV-4-1402 4-10-100 4-10-147 4-10-143 4 10-150 4-10-156 4-10-152 4-10 154 IA cA y) lA O

r

~o-OI I

I I O

I 4-20-723 SG8-4-002 P-2 7A 4-20-134 4-20-139 SGWL-4-007 4- 0-679 4-20-132 4-20-133 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 4 "A" STEAM GENERATOR DATE: 09/16/91 TEST g: 04-SG-7110-H REVISION DRAWN BY: DRAWING NUMBER:

1 ISI GROUP 7110

FIGURE 5 MOV-4-1401 N W ~ IA RV-4 1408 0N 0N 4-10-221 0I 0I I I PRESSURE TEST PARAMETERS I I I I RV 4-1406 0 N

PSIG F DESIGN 1085 600 oI 0I I

OPERATING 745 555 I HYDROSTATIC 1356 <<>60 POV-4-2605 P 2ISB 4-10-207 SGWL-4-028 RV-4-1405 4-10-201 248 RV-4-1407 4-10-200 247 4-10-243 4-10-250 4 10-256 4-10-252 4-10-254 NICI 0I N I

0I oI V I I

4-20-728 SG8-4-004 GB-4-003 4-20-234 4-20-239 SGWL-4-025 4-20-232 4-20-233 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 4 "B" STEAM GENERATOR DATE: 09/16/91 TEST 8: 04-SG-7111-H REVISION DRAWN BY: DRAWING NUMBER:

1 ISI GROUP 7111

4 ~ ~

FlGURE 6 MOV-4-1402 C4 RV-4-1413 o

I I 4-10-321 o o I RV-4-1411 PRESSURE TEST PARAMETERS 'llI I II' PSIG DESIGN 1085 600 o OPERATING 745 555 HYDROSTATIC 1356 >60 POV-4-2606 P-24C 4-10-307 SGYh.-4-046 RV-4-1410 4-10-301 348 RV-4-1412 4-10-300 347 4-10-343 4-10-350 4-10-356 4-10-352 4-10-354 v) o oI nI I o I I

4-20-733 SGB-4-006 GB-4-005 P- 7C 4-20-339 SGWL-4-042 4-20-687 4-20-332 4-20-333 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE: HYDROSTATIC TEST OF 4 "C" STEAM GENERATOR DATE: 09/16/91 TEST g: 04-SG-7112-H REVlSION DRAWN BY: DRAWING NUMBER:

1 ISI GROUP 7112

P