Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
WASHINOTON OIVICEg WILLIAMLKHMAN I 3IH DISTIIICT, FLOAIOA, 2440 RAYSVIIN HOVSE OFFICE BVILOINO WASHINOTON, D.C. 20515 COMMITTEEI (202) 2~211 APPROPRIATIONS IIl,OIIg12IIS Df ()JAN KIIffdl)StII(2S OISTIIICT OPPICEa SUBCOMMITTEE ON 2020 NC. IS3O STNEET FOIIEICN OPS IIATIONS Joule nt Eeyrnfeofatibed NOIITH MIAMIBEACH, FIANIIOA 33102 (305) 945-7518
- SVSCOMMITTEC ON TIIAH4 POIITATION KHaNjington, Q.C, 20515 PLEASE REPLY TO OISTRICT OFIIICFX)
April 12, 1979 The Honorable Joseph M. Hendrie Chairman Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Hendrie:
RE: Michael Purcell The attached communication'rom our constituent, Mr. Michael Purcell, is sent for your consideration.
I would very much appreciate your looking into the situation described 'by our constituent and advising me of your action in this case.
Thank you for your cooperation and assistance in this matter.
With best. wishes, I am Sincerely, WILLIAM LEHMAN Member of Congress
-NL/pkt Enclosure 905290 4L THIS STATIONERY PRINTED ON. PAPER MADE.WITH RECYCLED FIBERS
)
( ~~
0
/
Xq1
, .')
4~0341466095 04/05/79 DISTRlCT'OFFlCE ICS IPMHTZZ GSP, RECEIVED 3055588140 POP. TDMT'IAHI FL 14 04~05 1102A ESTPOFA PMS THE HONORABI E WILLIAM LEHHAh r- p r= t V P r>
w AS HI NG T QN OG 20515 LEASE GRANT NaRK'NCAVAGE. t S PETITION FOR HEARING.'AND INTERVENE TION ON FPL<8 TURKEY POINT REPAIRS NICHAEL PuRCELL 451 NORTHZAiT eeTH Sj VAIHI FL 33138 11! 02 E'Sl
," n~
ii 0 r
RICHIIIRD (DICK) STONE FLORIDA QyvYg gsjh&4% 'g
~ A ~p COMMITfKK5J AGRICULTURE. NUTRITION, ANO FORESTRY FOREIGN REI ATIONS VETERANS'FFAIRS
~Jhnfcb Wfcxfea Wennfe WASHINGTON. D.C 5 I0 jj( y 1979 Our File: 91 1717000 Congressional Liaison ~l 4~4 Nuclear Regulatory Commission 1717 H Street, NW Washington, D.C. 20555
Dear Director:
Because of the desire of this office to be responsive to all inquiries and communications, your consideration of the attached is requested. Your findings and views, in duplicate form, along with retur n of the enclosur e, would be grea'tly appreciated.
It would also be helpful to me if your response is mailed to my of fice at the addr ess below and INCLUDES THE FILE NUMBER SHOWN ON THE COMMUNICATION I HAVE SENT TO YOU .
Cordially, Richard (Dick) Stone RDS/vms Enclosure PLEASE REP LY TO: POST OFFICE BOX 4081 TALLAHASSEE, FLORI DA 32303
<<C
<< ~
HERBERT.F ROSS 6625 SOUTHWEST 55 LN SOUTH MI AM I FL -33143 029496E103 04/13/79 ICS IPMMTZZ CSP WSHB 305666S651 MGM TOHT SOUT'H., MIAMI FL 100 '04" 1'3 '0104P EST HONORA"LE RICHARD STONE U S SKNATE WASHINGTON DC 205]0 PLEASE GRANT MARK ONCAVAGE'S PETITION FOR HEARING AND INTERVENTION ON FPL ' TURKEY POINT REPAIRS NANCY ROSS MIAMI FL 1'3e04 EST MGMCOMiP HGM
v l . + g > Hw PP'+0)Agan + 4. +3'wjp
~ 4 ~
,gjcpPL~gi ~P 'P~~((~~>~m~~~~ m' r i'~~'~~~~~~~ ~~ ~~pc <~ ~ i~4 ~)
052095E 1 00 04'/ 1 0/79: 'g 'j J ICS IP MTZ2 CSP ,
~ l 3058586140 POM TDMT MIAMI FL 14 04" 10 0430P ESTPOMA PMS HONORABLE RICHARD STONE PLEASE GRANT ilARK ONCAVAGE'S PETITION FOR HEARING ANO INTER'VENTION ON FPL ' TURKEY POINT HEPA IRS ARLENE l'HAhKEL 607 HEST 47 ST MIAMI 8EACH FL 33140 1'6;30 EST 7'
HGQCOMP i )GAL
r r Kf.
r ~E
<-062785E101 04/11/79 ICS IPHHTZC'CSP
,3054470157 POH TOHT HIAHI FL 14 04 11 0329P ES TPOHA PHS HONORABLE RICHARD STONE.
~ASHING TON OC 2O510 PLEASE GRANT HA'RK ONCAVAGE'S PETITION FOR, HEARING .ANO INTERVE(T ON FPL t S TURKEY POINT. REPAIRS NANCY FiSHBACK 3379 SOUTH'wEST 26 ST HIAHI 'L'3133 '
c 15e29 EST HCHCOHP Ht'H
0-062609E101 09/11'l79 ICS IPNN TZZ CSP 3054070]57 POH TDNT HIANI FL 1I 00 f,1 03'28P ESTPONA PHS HONORABLE RICHARO STo NE WASHINGTON OC ?0510 I~
~ ~
h 'D
~
PLEaSE GHAivT. NARK ONCAVAGE IS PETITION FOR HEARING ANO IN.TER VENJ I GN ON FPL>S TURKEY POINT REPAIRS NANCY FISHBACK 3379 SOUTHWEST 26 ST NIAHI FL 3313'3 15I2B EST HGNCOHV NGN
4 060702E101 04/11/79 ICS IPHHTZZ CSP 3054470157 POH TPHT MIAMI FL 14 04-11 0309P ESTPOMA PNS HONORASLE RICHARD STONE wA SHING TON PC 20510 INTERVENE'T PLEASE GHAT T NARK QNCA VAGE ' PE,TI T ION FQR HKAFj I NG ANO I ION ON FPLiS TuAXEY POIt T REPAIRS CW PR EP~Ci POTTER 11011 SOUTH"~EST 104 ST Hl Al'I FL 33156 15;Oe EST
MiY h
0 o o
- ~+~~ wggv'"X.r+~gg ~++.fan ipse~ 4 +~~ ++~i ' i sz4Z g~+r .Sgj ii'5~~g5)~q'4 4-0615334.101 04/11/79 ICS IPNBTZZ CSP 30544701'57 PON TDHT NIAilI FL 14 04" 11 0317P ESTPOPA PWS HONORABLE RICHARD STONE
~ASHINGH)N-4C
~-'
20510
~1 PLEASE GRANT NARK ONCAVAGE S PETITION FOR HEARING A'ND INTERVENTION ON FPL S TURKEY POINT REPAIRS ENH IQUE AND NALUVI NEUFELG 5760 SOUTHIES T 6'0 ST. HIAMI FL 33143 5! 7 EST
i' o
~
/
4 "a
~
J.- ~ 'I t>
I P PP Leg 'eS 020793F 1 l 1 04/21/79 ICS IPNNTZZ'CSP PlP 41 30562}867 2 POM TONE MIAMI F I. 1 tI 04 21 123 1P ES TPOH A PHS SENATOR RICHARD STOI<E CD CD M ;T' r
i (TED PI.EASE URGE NHC l'0 GRANT NARK ON6LVAGE INTERVENER STATUS ON FPIL STEAH GENERATOR REPAIRS
'AAVNE T SUTTON 126 1 NORTHlESPT 172 ST t'lI ANI FL 33169 12<31 EST MGVCOMP MGH
4-041030El 1 1 04/21/79 ICS IPT'iN F22 CSP 3052710717 POn TDHT MIAMI Fl. 15 04 21 0816P ESTPOt",A PMS HOTS RICHARO STONE CA> IW+ iE OC 20510 P
'-i V)
PLEASE gANT NARK ONCAVAGE<G PETITION FOR HEARING AND INTERVENTION ON FPZ~~ ru~~EY POINT REPAIRS P EGG Y '1CN AH Y 3390 SOLi TINES T 75 A VE NI AHI F L 33155
tl 14 4y.
yg I 076259E094 04/04/79 ICS IPHHTZZ CSP 3052613082 POH TOHT HIAHI FL 1~> 04-04 1005P ESTPOHA PMS HONORABLE RICHARD STONE U S SENATE WASHINGTON OC 20510 PLEASE GRANT HARN ONCAYAGE S PETITION FOR HEARING ANO INTERYEhTION ON FPl. t S TURKEY POINT REPAIRS MANUEL 0 HENOOZA 7840 SOUTH>EST 29TH ST HIAHI FL 33155 22e0b ES f
043227EOe5 0<ZO517e res IPHHTzz 'csP 3056660809 POM TORT HIAHI F I. $ 5 00 05 1234P ESTPOHA PHS HONOHABLE RICiaRO STONE Pl.EASE GRANT HARK QNCAVAGE S PETITION FOR HE4RING ANO..INTERVENTION ON FPL'S TURKEY POINT RFPAIRS r CARVER CURHlNGS 2021 COUNTRY CLUB PRADO'IAHI.:FL:-,'3'5:13q 12:34 EST '-'-:.ii.
Q,'GHCOHP HGV
af d'~
I ARCIERI 3715 SOUTH LAKE PR MIAMI FL 33155 4 03~005E 04/21/79 I,CS IPMMTZZ,CSP H'SHB 3058544093 1 1 1 MGM TOMT MI At'll- FL 100 04 21'SOOP 'ST SENATOR RICHARD STONE 4 Q
) pl US SENATE NASHINTON DC 20510 PLEASE GRANT MARK ONCAVAGE ' PETITION f'R'EARING ANO INTERVENTION ON FPL S TURKEY POINT REPAIRS ~
INGRID ARC IERI 3715 SOUTH LAKE DR MIAMI FL 33155 17i00 EST MGMCOMP MGM
<<L A REY 77'1 SQUTHwEST HIAHI FL, 33129 11 t
ST APT 4 d it 4" 034136E111 04/21/79 ICS IPHHTZZ CSP WSHB 3058544093 HGH TDHT HIAHI FL 100 04" 21 0505P EST
/~. P~~gq j,Q SENATOR RICH'ARD STONE US SENATE WASHINGTON DC 205'.10 6
PLEASE GRANT .HARK ONCAYAGE ' 'PET IT IOiV FOR HEARING AND INTERYENTION ON FPL S TURKEY POINT REPAIRS ~
~
AiVNABEL 'RE'Y 771 SOUTHwEST 11 ST APT 4'I AHI Fl 33129 17~05 EST HGHCOHP HGH.
P' UR'G)) A R O 333 UNIVERSITY OR APT 341 CORAL GABLES FL 33124 4 034106E 1 1 1 04/21/79 ICS IPMHTZZ CSP,HSHB 3058544093 MGH TDMT MIAMI FL 100 04 21 0503IP EST SENATOR RICHARD STONE US SENATE WASHINGTON DC 20510 PLEASE GRANT MARK ONCAVAGE 1 S'ETITION FQR HEARING AND INTFRVENT ION ON FPL' S TURKEY POINT REPAIRS ~
PAULA 'EURGHARD 333 UNIVERSITY DR APT 341 CORAL GABLES FL 33124 17:03 EST HGHCOHP MGH
CLAUDE PEPPER JAMES F. SOIJTHERLAND ISTN DI$TRlcf FLDIIIDA ADMINISTIIATIVCASSISTANT I T 5/ SP CHARLOTTE DICKSON COMMITTEE ON RULES OFTICC 14ANAOCJI CHAIRMAN, SELECT COMMITTEE ON ACING KDIItftESS of tlIE 'HIIiteb StIIt25 2299 RAVSVSN Hovsc OFFICC DvICDIHO WAsIIIIISTok. D.C. 20SIS RQDERT S, WEINER Joule of Bepre5eotatibe5 DON PETIT STAFF DIIICCTOII DI STII ICT Ilcro SS SFITATIVC JAMES A SRENNAN 5Has'fjittg ton, X).C. 20515 ASSISTANT '70 VIIC CHAIIIMAN Dl STIIICT orrICCI TI2 HOVSC AIOICX I May 1, 1979 RooAI $ 2$ FSDSAAI. DvIcDIko WAskIkoTcFI. D.C. 20519 MIAMI,FSDAIDA 22020
Dear Chairman Hendrie:
You will please allow me to bring to your attention I
for your consideration and comment a request which have received from a number of my constituents and those in the Miami area supporting the request of hlr. Mark P.
Oncavage,. of Miami; to the Commission to hold public hearings on steam generator repairs planned for Turkey Point Units 3 and 4.
I want to join with my colleagues Senators Chiles and Stone and Congressman Pascell in their requests that you thoroughly review the matter, particularly in light of the possible safety aspects involved in these repairs. I would appreciat'e your keeping me informed of developments in .regard to Mr. Oncavage's request so that I may properly respond to the inquiries which I am receiving on the matter.
Thank you for your attention to this request, and Believe me, Very sincerely '
PO+~EC, u~
~)g.S> 9 pe o ITS
&IT'Ics.
Ct'IS <
iqII ~0 of Co pe'ember ss Hon. Joseph M. Hendric,'hairman Nuclear Regulatory Commission Washington, D. C. 20555 THIS STATIONERY PRINTED ON PAPER MADE WITH RECYCLED FIBERS
4i RICHARD (Dl+K) STONE FLOE I I5A 7IQR~$ ~5li~I,FNSI~I~ 5 I SP COMMITTCK5g AGRICULTURE NUTRITION. ANO FORESTRY FOREIGN RELATIONS VETERANS'FFAIRS
'Rlvrifeb Wfnfea Wennfe WASHINGTON. O.C. 205I0 Hay 1, 1979 Our File: 911717000 Congressional Liaison Nuclear Regulatory Commission 1717 H Street, NW Washington, D. C. 20555
Dear Director:
Because of the desire of this office to be responsive to all inquiries and communications, your consideration of the attached is requested. Your findings and views, in duplicate form, along with return of the enclosure, would be greatly appreciated.
It would also be helpful to me if your response is mailed to my office at the addr ess below and INCLUDES THE FILE NUMBER SHOWN ON THE CONHUNICATION I HAVE SENT TO YOU .
Cordially, Richard (Dick) Stone RDS/vms Enclosure PLEASE REPLY TO: 'POST OFFICE BOX 4081 TALLAHASSEE, FLORIDA 32303
'> C
)<
HERBERT,F ROSS 6625 SOUTHWEST 55 LN SOUTH HI A~I FL "33143 4~029096E103 Og/13/79 ICS IPMHTZZ CSP WSHB 3056668651 HGV TDWT SOUTH MIAMI FL 100 O~f<<13 010lfP EST
/ / '/. " "l 3 HONORABLE RICHARD STONE U- S SENATE r'z (g j .
WASHINGTON .DC 20510 c5
+4K] Qo PLEASE GRANT HARK ONCAVAGE'S PETITION FOR HEARING AND INTERVENTION ON FPL S TURKEY POINT REPAIRS i NANCY ROSS HIAHI FL 13:0~ EST MGHCOYiP HGN
052095E100 04/10/79'i It Q ~g j~ >~;
ICS IPMMTZZ CSP sl, 305B58B140 f POi" TDNT NIAHI L 14 04" 10 0430P ESTPQt'A Pt;S HONORABLE RICHARD STONE PLEASE GRANT 'ilARK ONCAVAGE l S PETITION FOR HEARING ANO INTERVENTION ON FFL S,TURKEY POINT REPAIRS ARLENE F HANDSEL 607 ~EST 47 ST MIAMI. BEACH FL 33140 1'6;30 EST
~GMCOMP NGH
'L ~
h 4" 06278SE101 04/1 1 /79 ICS IPMMTZZ CSP 3054470157 POM TDMT MIAMI FL 14 04 11 0329P ESTPOMA PMS HONOHAeLE RICHARO STONE NASHIN G TOhl DC 205 10 PLEASE GRANT MARW ONCAVAGK~S PETITION FQR HEARING ANO INTER VEh~T I~Oiv ON FPL t S TURKEY POINT REPAIRS NANCY FLASHBACK 3379 SOUTHhEST 26 ST MIAMI 'FL'3133 15e29 EST MGMCOMP Wr'M
4-062609E101 04/11l79 ICS IPNNTZZ CSP 3054470157 POH TORT MIAMI FL 14 04-11 0328P ESTPOMA PPS HONORABLE RICHARO STONE viASHINGTUN DC 20510 r EJl PLEASE GHANT .MARK ONCAVAGE'S PETITION FOR HEARING A'NO INTERYENJIGN ON FPLlS TuRKEY POINT REPAIRS NANCY FLSHBACK,3379 SOUTH>KST 26 ST HIAHI FL 33133 15e28 ES'T HGNCOHP tlGh 1
kf 6 4M+alg lg g +4 4 w 4-060702E101 04/11/79 ICS IPNHTZZ CSP L
3054470157 POM TOMT HIAHI FL 14 04-11. 0309P ESTPOMA PNS HONORABLE RICHARO STONE yiASHlNGTON OC 2P51P PLEASE GHANT MARK ONCAYAGE S PETI <
T ION FOR HEARING ANO INTERVENE'7 ION ON f PL t S TURKEY POINT REPAIRS OR EOw CN POT t'k R 11011 SOUTH'>EST 104 ST 5l fj'5 FL 33156 I
15;09 ES T
k 061533410 1'4/11/79 ICS IPHVTZZ CSV l
3054470157 PON TDHT MIAMI FL 14 04 11 031,7P ES'TPOPA PNS HONORABLE RICHARD STONE eASHING.-TQN-C
~ ~
20510
\ ~X PLEASE GRANT HARK ONCAVAGE S PETITION FOR HEARING A'ND INTERYEhTION
~
ON FPL ' TURKEY PO'IN T REPAIRS ENRIQUE ANO NALUVI NEUFELO 5760 SOUt'HREST 60 ST: HIAMI FL 33143 5
<<<<Iran, C
<<4 r1 p
020793E111 04/21/79 LCS LP>>>>TZl CSP 3056218872 POV TO>>T>>I 4>>1 Fl 1~I 04-21 1231P KSTPOVA P>>S SKNA TOR 'ICH ARO STONE PL.EASE URGE HHC TO GR,4iNT '>>ARK ONCE(VAGE INTERVENER STATUS OH FPl STEA>> GENERATOR RE;P,AIRS i Atr;E' SUTTON 1261 r'ORTH'~ES<<T 172 ST >> I A>> I Fl. 33169 12>31 EST
>>GNCUHP 565
+5 I I
~QW~~~ jp ~ 'fj i 1. rg>>. Ateg~rtg
~&~~AAc .Ih~~.;g ftAtr
~ rare+ c p, 'M 0+$ 1 p A
9
%J t A r
re,'
% A~~Wa .
~ ts I
4-041030K 1 1 1 04/21l79 ICS IPHHrkZ CSP 30527 107 17 POH TDHT HIAHI FL 15 04~21 0816P ESTPOHA PMS HON R I CHARO S.TOPIC CA%I%)< 'g<E DC 205 I 0 l P PLEASE I y.
ALII HARK ONCAVAGE 0 PETITION FOR HEARING AND INTERVENTION ON FI t, <~ tUHWEY POIilj'EPAIRS Pc'GG Y HCNAfc Y 3390 SOUTHWEST 75 A VE HI AHI F L 33155
'5 c-s ~,;P 07b259K094 04/04/79 ICS'Pi4IMTZ2 CSP 3052613082 POH TDNT HIAHI FL 1<1 04 04 1005P KSTPOMA Pvs HONORABLE RICHARD S.rONK U S SKNATK WASHINGTON OC 20510
&P PLEASE GRANT MARK ONCAYAGK S PEPI'IT ION FOR: HEARING AND INTERVENTION ON FPL t S TURKEY POINT REPihIRS EMANUEL l: HENOOZA 7840 SOUTHhKST 29TH ST HIAVI FL 33155 22e05 Ksf
.4"... p~~ ~"~p'~Wp4f'>~8"<<'>':~~'lg <+,"- '.- ':W+ ~ >~'"Pg.u~. Si,.
~C '~C> Lr ! > . " p'a-'~4/'lfjiCl:,
q 0<3227E095 00/05/79 ICS IPMHTZZ CSP 305666OBOq POH TDNT MIAMI FL f5 04-05 1234P,KSTPOHA PMS HONOHABLK RICHARO STONE
'I I
PLEASE GRAN T MARK QNCA VAGK S PETITION FOR HEARING,AND,,INTERVENTION
~
ON FPL S TURKEY POINT REPAIRS
~
r CARVEN 4UVMIt GS 2021 COUNTRY CLUB PRAGO'IAMI:;Fl;'3'S.i3q l2'3V KST 'pga% ~
MGMCOMP WGH
I ARC IERI 3715 'SOUTH LAKE DR HIAHI FL 33155 4 03~005E1 1 1 04/21/79 ICS IPHHTZZ .CSP HGH TDHT HIAHI FL 100 04" 21 0500R HSHB'056544093
-EST SENATOR RICHARD STONE
'US SENATE
'rlASHINTON DC 20510 PLEASE GRANT HARK PiNCAYAGE ' PETITION FOR HEARING ANO INTERVENTION ON FPL t S TURKEY POINT REPAIRS, INGRID ARC IERI 3715 SOUTH LAKE OR HIAHI FL 33155 17300 EST HGHCOHP HGH
A REY 77'1 SOUTHMEST 11 ST APT NIAHI F L 33'129 4-034136E111 04/21/79 ICS IPHMTZZ CSP WSHB 3058544093 HGM TDHT HIAHI FL 100 04 21 0505P EST p~jg3+
SENATOR RICHARD STONE US SENATE
'tIASHINGTON 'DC 205,10 PLEASE GRANT .HARK ONCAVAGE ~
S .PETITION FOR HEARING AND INTERVENTION ON FPL t S TURKEY POINT REPAIRS Q ANNABEL REY'71 SOUTH~EST 11, ST APT 4 MIAMI FL 33129 17<05 EST
P'UR'GHARO 333 UNI VKRSI TY DR APT 341 CORAL GABLES FL 33 124 4" 034106E111 04/21/79 ICS I,PMiNTZZ CSP WSHB 3058544093 MGM TDHT MIAMI FL 100 04 21 '503P 'ST SENATOR R I CHARD STONE US SENATE
'WASHINGTON DC 20510 PLEASK GRA'NT MARK ONCAVAGE ' PETITION FOR HEARING AhlD INTERVENT'ION ON FPL S TURKEY POINT REPAIRS, PAULA KURGHARD 333 UNI VERS I T Y DR AP T 341 CORAL GABLES FL 33 124 17:03 EST HGMCOHP MGM
UNITED- STATES. OF:AMERICA NUCLEAR REGULATORY COMMISS ION
)
)
FLORIDA POncR A%) LIGHT COMPANY ) Docket No. (s) 5p-25OSP
)50-251SP (Turkey Point, Units 3 and 4) )
)
)
)
)
CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document(s) upon each person designated on the official service list compiled'y the Office of the Secretary of. the Commission in this proceeding in accorcznce vith the requirements of Section 2.712 of 10 CFR Part 2,-
Rules, of Practice, of the Nuclear Regulatory Commission's Rules and Regulations.
Dated atVashington, D.C. this a.~ 197 Of fice" 'he Secretary ~of the Co ss ion
i) h ~ ~
UNITED STATES OF AMERICA NUCLEAR REGULATORY CO~" IISSION In tne Hatter of. )
)
FLORIDA POWER AMa LIGHT COMPANY ) 'Docket No.(s) 50 250SP
)50-251SP (Turkey Point, Units 3 and 4.) )
)
)
SEPDiICE LIST Elizabeth S. Bowers, Esq., Chairman Michael A. Bauser, Esq.
Atomic Safety and Licensing Board Lowenstein, Newman, Reis, U.S. Nuclear Regulatory. Commission Axelrad and Toll Washington, D.C. 1025 Connecticut Avenue, N.W.
Washington, D.C. 20036 20555'r.
David B.'all
.400 Circle Drive Mr. Mark P,'. Oncavage Santa Fe, New Mexico 87501 12200 S.H. 110th Avenue Miami, Florida 33176 Dr. Oscar H. Paris Atomic Safety and Licensing Board Norman A. Coll, Zsq.
U.S. Nuclear Regulatory Commission Steel Hector & Davis Washington, D.C. 20555 1400 S.E. First National Bank Building Miami, Florida 33131 Counsel for NRC Staff Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C. 20555
'Ql :(Qi