ML17309A559

From kanterella
Jump to navigation Jump to search

Forwards Response to NRC 940901 RAI Re Eals,Eals Annotated Classification Criteria Based on Response to NRC Rais,Rev 1 to OSSI-92-402A-4-REG, Re Ginna EALs Technical Bases & Rev 1 to Ossi 92-402A-2-REG, Fission Product Barrier..
ML17309A559
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/07/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A834 List:
References
TAC-M89506, NUDOCS 9411090265
Download: ML17309A559 (53)


Text

P RIGRITY 1

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:9411090265 DOC.DATE: 94/11/07 NOTARIZED: NO FACIL:50-244 Robert Emmet Gi.nna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFXLIATION JOHNSON,A.R.

Project Directorate I-3 DOCKET g

05000244 P

R

SUBJECT:

Forwards response to NRC 940901 RAI re EALs,EALs annotated classification criteria based on response to NRC RAXs,Rev 1

to OSSI-92-402A-4-REG, "RE Ginna EALs Technical Bases"

& Rev 1 to OSSI 92-402A-2-REG, "Fission Product Barrier...."

DISTRIBUTION CODE:

A045D COPIES RECEIVED:LTR ENCL t SIZE:

5 i ~ ~4 TITLE: OR Submittal:

Emergency Preparedness Pla s, Implement'g Procedures, C

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 I

XNTERNAL:

RECIPIENT ID CODE/NAME PD1-3 PD CENTE 01 OC CT EXTERNAL: NOAC

~P z.c>7$ g(Q <4 &

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECXPIENT ID CODE/NAME JOHNSON,A NRR/DRSS/PEPB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 Y'

C NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iViiSTE!CONTACT'I'HE DOCL'ifEN'rCON'rROL DESK, ROO!if Pl-37 (EXT.

04-DOS3 ) TO ELI!iflNATEYOUR NAifL FROif DISTRIIIUI'ION LIS'I'S FOR DOCI:b,fEN'I'S YOL'ON"I'L'ED!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 7

ENCL 7

V 1

I 1'y

~P 4ND ROCHESTER GASANDElECTRIC CORPORAllON ~ 89 EASTAVENUE; ROCHESTER, N. Y 146rI9-000I AREA CODE716 546-2700 ROBERT C. MECREDY Vice President hlvcieor Operations November 7, 1994 U.S. Nuclear, Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

Emergency Action Levels

Response

to Request for Additional Information R.E.

Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a):

Letter from A. R. Johnson (NRC), to R. C. Mecredy (RG&E),

Subject:

"Request for Additional Information on R.E.

Ginna Emergency Action Levels (TAC No. M89506)," dated Sept.

1, 1994 (b):

Letter from R. C. Mecredy (RG&E), to A. R. Johnson (NRC),

same subject, dated October 5, 1994

Dear Mr. Johnson:

Reference (a) requested within 30 days that RG&E provide additional information with regard to the proposed Emergency Action Levels (EAL) for the R.E.

Ginna Nuclear Power Plant.

Reference (b) requested an extension of an additional 30 days in order to coordinate our proposed EALs with those of other nuclear utilities in the state of New York.

Attached are the following in response to Reference (a):

Attachment A Response to the Request for Additional Information:

A response to each general and specific NRC comment has been provided.

Attachment B

R.E.

Ginna" Emergency Action Levels:

Annotated Classification Criteria Based on Response to NRC RAI.

Attachment C Emergency Action Levels Technical Bases, Revision 1.

Attachment D Fission Product Barrier Evaluation, Revision 1..

Attachment E

R.E.

Ginna Plant Specific EAL Guideline (PEG),

Revision 1.

'1 For the purpose of this submittal the EAL Tables, Attachment B,

contain annotated cross-references to the NUMARC ICgs, such as

[SA2],

[SS2],

[SG2].

We do not plan,

however, to include these 089135 7g7gK/2 >k~r esrroeo2ee

'st41 107 OS000244 PDR

references within the EAL implementing procedures.

The NUMARC ICgs are included as part of the Technical Bases (Attachment C).

Very 'truly yours, Robert C. Mecredy GAHK352 xc:

Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

TV

50-244 GINNA RG5EC

RESPONSE

TO RE(VEST FOR ADDITIONAL INFORMATION RE EMERGENCY ACTION LEVELS

.'; REC'D M/LTR DTD ll/7/94...9411090265

-NOTICE-THE ATTACHED FILES ARE OFFICIAL

'ECORDS OF THE INFORMATION &

REPORTS MANAGEMENT BRANCH.

THEY HAVE BEEN CHARGED TO YOU FOR A LIMITEDTIME PERIOD AND MUST BE RETURNED TO THE RE-CORDS & ARCHIVES SERVICES SEC-TION P1-22 WHITE FLINT. PLEASE DO NOT SEND DOCUMENTS CHARGED OUT THROUGH THE MAIL. REMOVAL OF ANY PAGE(S) FROM DOCUMENT FOR REPRODUCTION MUST,BE RE-FERRED TO FILE PERSONNEL..

Attachment A'>>";;.

R. E. Ginna Emergency. Ac@po~~yels RESPONSP TO RKQUEBe7+FOR ADDITIONAL INFQRP~YXON Docket 50-244

R. E: Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION 1

"The R. E. Ginna EALtables (both Categories and Subcategories) omitted the fulltext ofthe NUMARCInitiating Conditions. For example..."

"In accordance with NUMARC/NESP-007, ICs are: "one ofa predetermined subset ofnuclear power plant conditions where either the potential exists for a radiological emergency, or such an emergency has occurred." EALs are: "a pre-determined, site-specific, observable threshold for a plant IC that places the plant in a given emergency class." The use ofICs is advantageous from a human factors perspective.

Grouping EALs under ICs willindicate to those who must use EALs how an EAL(or several diverse EALs) is related to the plant condition ofconcern. This willassist the emergency director in the use ofjudgment in making the correct event classification. The lack ofICs for loss offission product barriers is ofparticular concern to the staff. Itis important that personnel who perform event classification, and those who communicate the classification to offsite authorities, clearly understand the condition of each fission product barrier as reQected in the EAL. This association between barriers and EALs is not readily apparent in the Ginna methodology."

"The lack ofICs in the licensee's classification scheme represents a

significant departure from the NUMARCguidance and is unacceptable.

The licensee should include ICs withtheir EALs to demonstrate the relationship between the EALs and their associated classification" As stated in the RAI, ICs are a subset ofpower plant conditions which represent a potential or actual radiological emergency.

EALs are "a pre-determined, site-specific, observable threshold for a plant IC that places the plant in a given emergency class." When a site-specific, observable threshold (EAL)is reached, entry into its associated emergency class is required irrespective ofthe IC &om which the EALis derived. As stated in the RAI, ICs provide criteria that may be relevant to emergency classification based on the users "judgment," Therefore, itfollows that use ofjudgment may be required for those conditions in which no "pre-determined, site-specific, observable threshold" can be defined.

Since ICs lack "site-specific, observable thresholds" for emergency classification, for those postulated conditions in which no site specific observable threshold exists, the users judgment must be based on the generic definition ofthe associated emergency classification.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION EALCategory 9.0 "Other" defines EALs in each emergency class which are based upon the user's judgment. Category 9.0 is used when the plant condition does not meet any ofthe EALthresholds ofCategory 1.0 through Category 8.0 but itis determined that the plant condition meets either the emergency class definition criteria or the MBrIARC/NESP-007 fission product barrier loss or potential loss criteria.

'n hi ni'n f n r "Absent from the R.E. Ginna IC and the supporting EALwere the NUMARC criteria of"Actual or Imminent" and "Using Actual Meteorology." The basis document included the criteria regarding meteorology, but would have to be referred to by the classifier in addition to a classification implementing procedure.

The licensee should assure that cross referencing requirements are minimized by including all necessary attributes ofICs and EALs in one location."

Though not specifically stated, itis inferred that this RAIis in reference to EALs 5.2.4 and 5.2.5.

For any actual or imminent release, dose projections performed in'accordance with EPIP 2-18, "Control Room Dose Assessment, EPIP 2-4 "Emergency Dose Projections - Manual Method, EPIP 2-5 "Emergency Dose Projections-Personal Computer Method, or EPIP 2-6 "Emergency Dose Projections-MIDASProgram, use ofactual meteorology is specified. Therefore, implicit in the performance ofany dose projection is the use ofactual meteorology.

'm

'n n

~

~

i mmi R. E. Ginna Emergency Action Levels RESPONSE TO gEQUESTS FOR ADDITIONALINFORMATION

[para. 1]

"The licensee's failure to include a fission product barrier evaluation matrix constitutes a significant departure from the methodology in NUMARC/NESP-007. NESP-007 specifically included barrier evaluation in its classification methodology to complement the symptomatic and event-based ICs, especially for the higher classifications.

The fission product barrier matrix provides multiple indicators to operators to assess the status ofeach ofthe barriers and classify the emergency based upon their integrity. The matrix also provides the abilityto dynamically assess how far present conditions are from escalating to the next higher emergency class. "For example, ifFuel Clad barrier and RCS barrier 'Loss'ALs existed, This would indicate to the Emergency Director that, in addition to offsite dose assessments, continual assessments ofradioactive inventory and containment integrity must be focused on. If, on the other hand, both fuel clad barrier and RCS barrier

'Potential Loss'ALs existed, the Emergency Director would have more assurance that there was no immediate need to escalate..."."

[para. 2]

"The licensee has indicated that their proposed fission product barrier EALs reduce the burden on the operators in evaluating the fission product barriers, however, the use ofnine separate categories ofEALs by the licensee willstill require someone to refer to several different categories to perform a dynamic assessment ofthe fission product barriers. Further, the scheme is internally conQicting because ofthe multiple categories.

For example, ifcoolant activity was > 300 p,Ci/cc DEI-131 and primary system leakage was > 46 gpm, either ofthese conditions would be an Alertper the licensee's EALtables.

However, the collective failures would not necessarily result in a site area emergency (SAE) declaration, as is required by NUMARCcriteria.

[para. 3]

"Inthe bounding analysis that was performed to evaluate the numerous combinations ofconditions ofthe three fission product barriers, several assumptions were made that were not adequately justified or led to the elimination ofsome combinations that were bounded by the condition. For example, under the remarks section ofthe Ginna Fission Product Barrier Evaluation:

[Subpara. 1]

3.

The initiation signal...

Containment isolation signals can also occur due to loss ofcontainment cooling or faulted steam generator 4

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION

[Subpara. 2]

4.

In order to reach...

No technical supporting information was provided to support the assertion that a core cooling or heat sink RED path must exist. The licensee also did not adequately demonstrate that this condition is indicative ofa loss of the fuel clad barrier.

[Subpara. 3]

10.

A Core Exit Thermocouple reading...

Entry into Core Cooling-RED path also requires the loss ofall RCPs and is not indicative ofa potential loss ofcontainment.

Therefore, declaration of a General Emergency would be unwarranted.

[Subpara. 4]

11....Thus, entry into Core...

The NUMARCguidance for potential loss ofthe containment due to degradation in the Core Cooling CSF specifically requires that functional recovery procedures have been ineffective for 15 minutes.

Severe accident analyses have concluded that functional restoration procedures can arrest core degradation within the reactor vessel in a significant fraction ofthe core damage scenarios, and that the likelihood ofcontainment failure is very small in these events.

Therefore, itis appropriate to provide a reasonable period oftime to allow function restoration procedures to arrest the core melt sequence.

Whether or not the procedures willbe effective should be apparent within 15 minutes.

[Subpara. 5]

12.

Core Cooling-Orange on the CSFST...

The "Loss" EALfor the RCS barrier in NU1KARC/NESP-007 that addresses RCS leakage is under the heading "RCS Leak Rate." The wording is "RCS leak rate GREATER than makeup capacity as indicated by a loss ofRCS subcooling." In NUMARC's technical basis it states the "loss ofsubcooling is a fundamental indication that the inventory control systems are inadequate in maintaining RCS pressure and inventory against the volume loss through the leak." Thus, loss ofsubcooling is a valid indicator for loss ofthe RCS barrier

~xi ~ MJMARC does not state that loss ofsubcooling can only occur due to a loss ofthe RCS pressure boundary as is implied by the statement above. The licensee must technically justifythat a loss of subcooling can only occur when there is a breach ofthe RCS barrier.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION

[Subpara. 6]

22.

This combination ofconditions would produce...

The NtBrIARCguidance has been developed to specifically provide for multiple redundant indications ofloss or potential loss ofthe three fission product barriers, Itis unacceptable to simply eliminate a combination of conditions because ofits redundancy to other EALs.

[Subpara. 7]

23.

EAIP FC6.1 is equivalent to...

This comment applies to the combination ofa loss ofthe RCS barrier as indicated by containment radiation monitor readings and a loss ofthe fuel clad as indicated by other site-specific indications. The licensee has eliminated itbased upon its redundancy to an containment radiation monitor EALfor loss ofthe RCS and Fuel Clad. As stated in the previous comment, itis unacceptable to simply eliminate a combination of conditions because ofits redundancy to other EALs.

[Subpara. 8]

45.

Any combination ofPC4.1 and either...

PC4.1 states, "Release ofsecondary side to atmosphere with primary to secondary leakage greater than tech spec. allowable." This condition is not refiective ofa loss or potential loss ofthe RCS barrier. Thus, declaration ofa General Emergency would not be warranted in conjunction with a loss ofthe fuel clad.

[Para. 4]

Both the MMARCguidance and Appendix E to 10CFR Part 50 require the use ofmultiple indicators for evaluating plant conditions. The licensee should consider a different format (Barrier analysis) for the fission product barrier EALs that maximizes the number ofparameters or indicators available, minimizes the time to classify, and assures multiple conditions are readily evaluated and properly classified.

R. E: Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION

[Para. 1]

MJMARC/NESP-007 neither states nor infers that the generic fission product barrier matrix is intended or required to be implemented on a site-specific basis.

On September 22 - 23, 1992 the Emergency Action Levels Implementation Workshop was conducted by NUSGQ(C. Specifically stated in presentations and in the workshop training materials (Section 3 page PF-39, page BF-30 and the PWR Fission Product Barrier MatrixBreakout Session Guide Section 7) attached, was the fact that the matrix format is not required. Itonly requires that compliance with all combinations are documented.

NKMARC/NESP-007 does not preclude the development of EALs based on an evaluation offission product barrier loss/potential loss conditions as part ofthe development process.

The fission product barrier loss matrix as presented in NU1NARC/NESP-007 was " chosen to clearly show the synergism among the EALs and support more accurate dynamic assessments."

Further, NUMARC/NESP-007 states "The guidance presented here is not intended to be applied to plants as-is. The EALguidance is intended to give the logic for developing site-specific EALs using site-specific EALpresentation methods." The Fission Product Barrier Evaluation and the subsequent binning ofthe Ginna fission product barrier based EALs into categories was specifically performed to support the user's abilityto "dynamically assess how far present conditions are from escalating to the next higher emergency class." By defining logical event categories and subcategories in which to place these EALs, the abilityto perform a dynamic assessment is enhanced.

The usability and correctness ofthe Ginna method ofEALpresentation has been demonstrated and documented in numerous dynamic simulator scenarios during EALvalidation exercises.

The NUMARC/NESP-007 matrix format requires the user to evaluate thousands ofcombinations ofconditions that may have no logical relationship.

Such a format is a hindrance, not an aid, in making timely, accurate, and consistent emergency event classifications.

To our knowledge, neither NUNC nor plants that have adopted the MJMARC/NESP-007 fission product barrier matrix format have attempted a dynamic test oftheir EALs for the purpose ofdemonstrating and assessing their usability characteristics.

To the contrary, itis recognized that some BWR and PWR plants have suspended implementation ofMB~C/NESP-007 based EALs or have canceled their implementation because their users find the format confusing, unworkable, and prone to misclassification.

The Fission Product Barrier Evaluation demonstrates that the Ginna fission product barrier-based EALs are technically correct and meet the intent of NUMARC/NESP-007.

h ri frm h Fi i P

Brrir nh n

h fi i In i'n h

mn h nr 'n 1

r rri rl n ll i

m ri R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION

[Para. 2]

NUMARC/NESP-007 states "The presentation method shown for Fission Product Barriers was chosen to clearly show the synergism among the EALs and to support more accurate dynamic assessments."

It does not state or implythat this method ofpresentation is necessary either to depict the synergism or to provide the abilityfor dynamic assessments.

Rather, itis provided as a guide for the EALwriter to ensure that the selected presentation methodology properly reflects the desired synergistic quality and assessment capability. While NUMARC/NESP-007 does not define the term "dynamic assessment", itis assumed that itmeans the ability to evaluate fission product barrier loss and potential loss indicators under

'volving plant conditions. Unlike the MJMARC/NESP-007 matrix format, the Ginna EALpresentation method places similar EALs into categories and subcategories that focus the user's attention to the specific EALthreshold that corresponds to the plant condition ofconcern. This provides a logical classification and escalation path ofrelated indicators and thus allows for rapid assessment ofemergency conditions associated with fission product barrier loss. Itis important to note that the Ginna EALcategories and subcategories are not simply representations or abbreviations ofthe MMARC/NESP-007 ICs. Rather, each Ginna category and associated subcategory is a pathway from broad indicators ofpotential emergency events to a set of specific threshold conditions that require emergency classification.

The EALs derived from the Fission Product Barrier Evaluation take into account the intended 'synergism'f the fission product barrier basis information which cannot be adequately addressed by the NUMARC/NESP-007 matrix format. An example would be a condition in which RCS leakage into containment is in excess ofnormal makeup capacity (RCS potential loss) in conjunction with a secondary side release with primary to secondary leakage in excess oftechnical specifications (Containment loss). Under a matrix format, this combination ofconditions would require a Site Area Emergency (SAE) declaration because NUMARC/NESP-007 requires an SAE for the potential loss ofthe fuel clad or RCS with the loss ofanother barrier.

This is clearly not intended. MB~C/NESP-007 containment loss indicator C4 basis states that the Site Area Emergency associated with the containment loss indication is intended to be escalatory from RCS breaches associated with SG tube ruptures.

The Fission Product Barrier Evaluation does not rely on single indications as stated in the RAI. For the majority ofthe bounding conditions defined in the Fission Product Barrier Evaluation the indicators subsumed into other combinations ofconditions consist ofthose indicators which are either:

~

Completely bounded by another combination for the same indicator, or

~

Are a subset ofanother indicator.

R. E. Ginna'mergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION In the case cited (>300 pCi/cc DEI-131 in conjunction withprimary system leakage > 46 gpm), the combination was omitted in the Fission Product Barrier Evaluation because this condition would result in exceedin'g the 100 R/hr SAE EAL. The 1008/hr SAE EALis based on >300 p,Ci/cc DEI-131 in conjunction withprimary system leakage into containment.

in This EALhas been added in light ofthe assumptions which are made in the derivation ofthe containment radiation monitor value associated with the fuel clad loss EAL as well as variables in the bounding assumptions (i.e. diQerences in time after shutdown and coolant volume released).

[Para. 3]

[Subpara. 1],

Loss ofcontainment cooling willnot result in a containment pressure (4.0 psig) sufBcient to result in a containment isolation, In addition, procedural requirements require the containment to be vented under this condition to maintain pressure well below the isolation setpoint.

Afaulted steam generator could result in a containment isolation signal. ~

h ni'n in hi i

1 f h n

inm 1

ifi 1

m n

i 1

[Subpara. 2]

NUMARC/NESP-007 states in the basis for containment barrier loss N1:

"Conditions leading to containment RED path result from RCS barrier and/or Fuel Clad Barrier Loss. Thus, this EALis primarilya discriminator between Site Area Emergency and General Emergency representing a potential loss of the third barrier." Therefore, entry into Containment RED path by itselfis intended to result in a General Emergency.

fr n

'h n

11 As stated in the Ginna PEG, in order to reach containment RED path, a containment pressure of60 psig must be reached.

This pressure is well in excess ofthe maximum pressure attained from the DBALOCAand is greater than the maximum pressure attained for all analyzed steam line breaks inside containment specified in the Ginna FSAR. Therefore, to attain such a containment pressure, the energy source must be as a result ofa severely degraded core (metal water reaction) in conjunction with RCS breach or a severe ATWS condition in conjunction with RCS breach.

Per NUMARC/NESP-007 IC SS2 such an ATWS leads to imminent or potential loss offuel clad.

r in A

r

'n 1

1 i

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION ifi n

Fi in n

E 1

D h

[Subpara. 3]

Per the Ginna EALs,'core cooling RED only requires declaration ofa Site Area Emergency.

Justification ¹10 in the Fission Product Barrier Evaluation referenced in this RAI was in error and should have read "... and warrants declaration ofa Site Area Emergency."

ifi i

[Subpara. 4]

Per the Ginna EALs, core cooling RED and functional restoration procedures not effective within 15 minutes is the threshold for a General Emergency.

[Subpara. 5]

The justification was not intended to infer that a loss ofRCS subcooling can only occur from a loss ofRCS. Rather, that any core cooling ORANGE or RED path represents a loss of subcooling resulting from a loss ofRCS.

Justification ¹12 has been reworded to reflect the followingbasis.

ORANGE path core cooling is entered when either CET > 700'F or RVLIS water level < top offuel (RED path ifboth conditions exist or CETs > 1200

'F). The RCS pressure corresponding to 700 'F is approximately 3100 psig.

This pressure is more than 600 psig greater than the pressurizer safety valve liftpressure and 365 psig greater than the RCS safety limit. Ifthe RCS is intact under this condition, RCS barrier loss is imminent. RCS inventory is never intentionally.reduced to the top offuel (43% RVLIS)under hot conditions or power operations.

Areduction in RCS volume ofthis magnitude indicates a significant br'each ofthe RCS barrier since no intentional valving configuration would result in such a decrease.

Any condition which results in an inventory loss ofthis magnitude must be attributed to an RCS breach caused by a RCS line break or unisolated primary system discharging in excess ofmakeup capacity. Itwould be extremely poor judgment to assume that a loss ofthe RCS barrier has not occurred under either ofthese conditions. It should be noted that vessel water level below the top offuel is considered a RCS barrier loss in the BWR fission product EALs. There is no difference in the mechanisms which could cause vessel level to drop below the top offuel between BWRs and PWRs. Important to this basis is, for the purpose ofemergency declaration, the potential release offission products to the environment. In the case where the fuel clad is actually or potentially breached, the assumption that the fission products would be contained, even in the absence ofother RCS loss indicators not immediately apparent, with vessel level below the top offuel is inappropriate.

Figure 4.16 ofNUREG 1228 "Source Term Estimation During Response to Severe Nuclear Power Plant Accidents" shows how each ofthe critical safety functions is related to fission product barrier maintenance as regards preventing radioactivity R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION releases.

Core heat removal (core cooling) along with RCS pressure control and RCS heat removal (heat sink) are shown to be directly related to RCS boundary maintenance.

It should also be noted that NUMARC/NESP-007 considers RED path heat sink a potential loss ofRCS, yet the conditions requiring entry into this path are based on insufBcient SG level and feedwater flow. These conditions are not direct threats to RCS barrier integrity but may lead to RCS pressure conditions which in turn may lead to RCS barrier breach.

NUMARC/NESP-007 provides no technical basis to support how a RED path heat sink represents a potential loss ofRCS boundary. Itwould appear that the RCS inventory loss conditions requiring entry into core cooling ORANGE or RED path are much more directly indicative ofactual or potential RCS breach than is entry into RED path heat sink.

[Subpara. 6]

min in rfrn h

m i in 1 h

l k

[Subpara. 7]

in m 'n lin m i

[Subpara. 8]

ggzrgg~ The conditions referenced by this justification represent a loss of RCS in conjunction with a loss ofcontainment and thus were revised to reflect a Site Area Emergency.

EALs derived from combinations ofunisolable secondary side line break with SG tube rupture in combination with any fuel clad loss/potential loss indicators result in a General Emergency.

[Para. 4]

Itis still appropriate to define, where possible, distinct EALs which are indicative ofmultiple barrier loss/potential loss. This minimizes the time to classify while assuring multiple conditions are readily evaluated and properly classified. Based on exhaustive operator interviews, the use ofa fission-product barrier matrix format has been determined to be overly burdensome and confusing for the user resulting in missed or incorrect classifications.

This concern has been expressed by other licensees who have attempted to implement NUMARC/NESP-007 fission product barrier EALs with only a matrix format.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION Because ofthe complexity ofthe NUMiARC/NESP-007 fission product barrier loss/potential loss definition ofthe Site Area Emergency, some licensees have attempted to deviate fromIGB~C and simplifythe fission product barrier loss/potential loss definition by removing the intended reduced weighting of the containment.

The reduced weighting ofthe containment at the SAE classification is a significant part ofthe basis in the intended synergism between barrier loss indicators. The Ginna Fission Product Barrier Evaluation maintains this intended synergism ofNUMARCwhile eliminating the inherent complexity. The Ginna EALformat has been validated by operating crews utilizing scenarios in the plant-specific simulator to test each EAL. The results ofthis validation have been documented and feedback incorporated into the EALs to further ensure their usability.

"Inseveral instances that are specifically commented on, the licensee has departed from the NUMARCguidance ofbasing classifications upon observing the integrity ofthe three fission product barriers, and made classifications based on one indicator, especially in the case ofCritical Safety Function Status Tree (CSFST) status. For example, ifthe CSF for containment is on a RED path, a general emergency is declared. This approach is inconsistent with NUMARCguidance that requires evaluation of each barrier. The licensee should assure that all barriers are evaluated when arriving at a classification rather than simply observing one status indicator.

This comment relates to the comment above.

NUMARC/NESP-007 Section 3.9 states:

"Plant emergency operating procedures (EOPs) are designed to maintain and /or restore a set ofCSFs which are listed in the order ofpriorityofrestoration efforts during accident conditions."...

There are diverse and redundant plant systems to support each CSF. By monitoring the CFSs instead ofthe individual system component status, the impact ofmultiple events is inherently addressed, e.g. the number ofoperable components available to maintain the function.

The EOPs contain detailed instructions regarding the monitoring ofthese functions and provides a scheme for classi fying the significance ofthe challenge to the functions. Inproviding EALs based on these schemes, the emergency classification can flow from the EOP assessment rather than being based on a separate

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION EALassessment.

This is desirable as it reduces ambiguity and reduces the time necessary to classi fy the event."

As stated by TABAC,each CSF is supported by diverse and redundant plant systems.

The entry conditions for CSFSTs are also supported by diverse and redundant instrumentation.

Containment RED path is not a single indicator but a defined, measurable and operationally significant condition which is known to be indicative ofmultiple fission product barrier losses.

The Ginna EAL scheme does not rely solely on this condition to determine when a general emergency due to the loss offission product barriers must be declared.

Nor does itpreclude the declaration ofa general emergency based on other fission product barrier loss EALs which may or may not manifest themselves under a given condition. The Ginna EAL scheme does require classification ofa General Emergency because, in and of itself, this condition represents a loss ofthe fuel clad, RCS barriers and a potential loss ofcontainment barrier.

The technical bases for those site-specific EALs proposed by the licensee concerning secondary side releases consider the condenser air ejector as a potential release pathway. The "Questions and Answers on NUMARC/NESP-007, published in June of 1993, specifically exclude the condenser air ejectors as a prolonged secondary side release pathway. The licensee should provide justification for including this pathway as a discriminator for those EALs or revise their technical bases to eliminate the reference.

Thi n i n 'fi ff mi In several EALs proposed by the licensee, entry into a Core-Cooling ORANGE or RED path was considered to be at least a potential loss ofthe RCS barrier.

However, the core cooling critical safety function was not considered by NUIKARC/NESP-007 as a discriminator for the RCS barrier integrity and its use by the licensee was not adequately justified. The licensee should provide additional information that clearly demonstrates that a core cooling ORANGE or RED path is indicative ofa failure ofthe RCS barrier or revise those EALs that incorporate this concept to be consistent with the NUMARC guidance.

Refer to Response to General RAI ¹3 [Para. 3l [Subpara. 5]

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NUMARCexample AUl-1 states in part; "Avalid reading..."

The licensee equivalent EALfor eBluent monitors, Unusual Event, 5.1.1 states in part:

"Avalid reading..."

NUMARC specifies that a site specific procedure be used to assess the release.

The licensee's PEG provided procedures for release assessment, but these procedures were not incorporated into the EALs nor included in the technical bases.

The NUMARCnote regarding declaration ifthe assessment is not accomplished within 60 minutes was not included in the EAL,but was discussed in the technical bases. Itis important that a dose assessment is performed using actual meteorology and a best estimate ofthe actual radionuclide mix to determine ifthe effluent release willlead to escalation of the emergency due to adverse conditions.

The licensee should revise this EALto achieve consistency with the MJMARC criteria, or provide te'chnical justification for the deviation.

h r 1

Th Lh l

l r inif h rfrn r

ri r The NUNC example AAl-1states in part:

"Avalid reading..."

The licensee equivalent EALfor effluent monitors, Alert, 5.1.2 states in part:

"Avalid reading..."

NUMARCspecifies that a site specific procedure be used to assess the release.

The licensee's PEG provided procedures for release assessment, but these procedures were not incorporated into the EALs nor included in the technical bases.

The NUMARCnote regarding declaration ifthe assessment is not accomplished within 15 minutes was not included in the EAL, nor discussed in the technical bases. Itis important that a dose assessment is performed using actual meteorology and a best estimate ofthe actual R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION radionuclide mix to determine ifthe eKuent release willlead to escalation of the emergency due to adverse conditions.

The licensee should revise this EALto achieve consistency with the MB~C criteria, or provide technical justification for the deviation.

L4 2

1 r i i

'i m'he NUIKARCcr'iteria for InitiatingCondition AA3 states in part:

"Release ofradioactive..."

The licensee equivalent EALfor Area Radiation Levels, Alert, 5.3.3 states in part:

"Sustained abnormal area radiation levels >8 Rlhr..."

The licensee's EALdid not include the NUMARCcriteria for establishing or maintaining cold shutdown conditions. The referenced table 5.3 was not included in the EAL, but was in the technical bases.

The licensee should revise this EALto be consistent with the NUNC criteria and provide the referenced table in the EALor provide technical justification for the deviation.

inl h

r in "r ir m in in 1

h "Th rfrn 1h nnl The NUMARCexample AS1-1 states in part:

"Avalid reading..."

The licensee equivalent EALfor effluent monitors, Site Area Emergency, 5.1.3 states in part:

"Avalid reading..."

NUMARCspecifies that a site specific procedure be used to assess the release.

The licensee's PEG provided procedures for release assessment, however, this was not incorporated into the EALs. The NARC note R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION regarding declaration ifthe assessment is not accomplished within 15 minutes was not included in the EALand not discussed in the technical bases.

The effluent setpoints for the site area emergency EAL are based upon FSAR source terms and average annual meteorology and, therefore, may significantly differ from the actual release conditions. Thus, escalation to a site area emergency due to effluent releases should be based upon an assessment ofpotential offsite doses as determined by actual source term and meteorology. The primary purpose ofthe effluent setpoint is to trigger this assessment, not to upgrade the emergency class. Classification through use ofthe effluent monitor reading alone is only expected when dose assessments can not be completed within the required time.

The licensee should revise this EALto achieve consistency with the MB~C criteria, or provide adequate justification for the deviation. The licensee should also provide information on the source terms(s) utilized to determine the values in table 5.1.

Th A

h l

The source terms utilized to determine the value in Table 5.1 are those utilized in the Ginna dose projection procedure EPIP 2-18 "Control Room Dose Assessment.

The EPIP,2-18 dose assessment methodology uses effluent monitor dose conversion factors which were derived using NUREG-1228 Table 2.2 fission product inventories and assumed release fractions specified in table 3.12 ofNUREG 1465 "Accident Source Terms for LightWater Nuclear Power Plant" for in-vessel severe core damage.

The NU)rIARCcriteria for Initiating Condition AG1 states in part:

"Boundary Dose Resulting from an Actual..."

The licensee equivalent EALfor effluent monitors, General Emergency, 5.2.5 states in part:

"Dose projections or field surveys which..."

NUMARCspecifies the use ofactual meteorology for the dose projections.

The licensee EALdid not reflect the use ofactual meteorology for dose projections, however the licensee discussed the requirement for use ofactual meteorology in the technical bases.

The licensee should revise this EALto achieve consistency with the NUNC criteria, or provide adequate justification for the deviation.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The site specific procedures which may be utilized to assess a release EPIP 2-18, "Control Room Dose Assessment, EPIP 2-4 "Emergency Dose Projections-Manual Method, EPIP 2-5 "Emergency Dose Projections - Personal Computer Method, or EPIP 2-6 "Emergency Dose Projections - MIDASProgram all specify the use ofactual meteorology. Therefore specific reference to its use is unnecessary.

The NUMARCexample AG1-1 states:

"Avalid reading..."

The licensee equivalent EALfor effluent monitors, General Emergency, 5.1.4 states in part:

"Avalid reading..."

NUMARC specifies that a site specific procedure be used to assess the release.

The licensee's PEG provided procedures for release assessment which was not incorporated into the EALs. The NUMARCnote regarding declaration ifthe assessment is not accomplished within 15 minutes was not included in the EALnor discussed in the technical bases.

The efQuent setpoints for the general emergency EALare based upon FSAR source terms and average annual meteorology and, therefore, may significantly differ from the actual release conditions. Thus, escalation to a general emergency due to efHuent releases should be based upon an assessment ofpotential offsite doses as determined by actual source term and meteorology. The primary purpose ofthe effluent setpoint is to trigger this assessment, not to upgrade the emergency class. Classification through use ofthe efHuent monitor reading alone is only expected when dose assessments can not be completed within the required time.

The licensee should revise this EALto achieve consistency with the MJMARC criteria, or provide adequate justification for the deviation. The licensee should also provide information on the source terms(s) utilized to determine the values in table 5.1.

f n

rmn f n h r l Th EALh 1

nr in 1 ri ri r i n 1

ini n i m i The source terms utilized to determine the value in Table 5.1 are those utilized in the Ginna dose projection procedure EPIP 2-18 "Control Room Dose Assessment.

The EPIP 2-18 dose assessment methodology uses efHuent monitor dose conversion factors which were derived using NUREG-1228 Table 2.2 fission product inventories and assumed release fractions specified R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION in Table 3.12 ofI%KEG 1465 "Accident Source Terms for LightWater Nuclear Power Plant" for in-vessel severe core damage.

The licensee's EAL4.1.3, "Containment Integrity Status," states:

"Either:

CI or CVIvalve(s).

~."

The relationship between CI and CVIvalves was not explained in the technical bases to demonstrate how failure ofeither one to close willprovide a pathway outside containment.

The licensee should provide information on these two systems and their interfaces, ifany. The licensee should provide information on the entry conditions for a LOCAto demonstrate these entry conditions are commensurate with a potential loss or loss ofthe RCS barrier.

The second argument does not provide a threshold for the amount ofprimary system leakage outside containment.

The licensee should include a threshold that operators can utilize to evaluate this argument against the guidance in NUMARC/NESP-007 for loss or potential loss ofthe RCS barrier.

Containment Isolation (CI) and Containment Ventilation Isolation (CVI) valves are those valves associated with the CI and CVIlogic. CI and CVI are protective systems designed to close containment isolation valves in those systems which either come into direct contact withprimary pressure (CI) or the containment atmosphere (CVI)and penetrate the containment barrier.

These valves are designed to close under conditions which are indicative ofa LOCA(any automatic SI signal). Failure ofone or more ofthese valves to close followinga confirmed LOCA does not by itselfprovide a pathway outside containment.

As long as one valve in the line is closed, or ifboth valves fail to close but no downstream pathway exists, classification under this EALwould not be required, The criterion "ANDRadiological pathway to the environment exists" provides this discriminator. There is no interface between the CI and CVI systems but each is comprised ofdiverse systems which provide the containment isolation function under LOCAconditions.

The determination ofthe existence ofa LOCAis consistent with the diagnostic activities specified in E-0 'Reactor Trip or Safety Injection'.

The criterion "Inabilityto isolate any primary system discharging outside containment" addresses any breach ofthe RCS and containment which is not protected by the CI or CVI systems or which results from an interfacing system LOCA (not addressed by NUMARC). No leakage threshold is specified since leaks outside containment, particularly under dynamic conditions, are dificultto quantify and may manifest themselves with diverse symptoms.

Symptoms ofa primary system discharging outside containment may be indicated via mass balance, decreasing RCS inventory without corresponding containment response, or area temperatures and

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION radiation levels outside containment. Itis for this reason that Shik Supervisor/Emergency Coordinator judgment is intended to be used in evaluating this criteria.

The NU)~C criteria for "Fuel Clad Barrier Example EALs" (Table 4, Fission Product Barrier Reference Table), "

ri i 1

f n i states in part:

P IAL Core Cooling-Red MB~C Table 4 also states:

Core Cooling-Orange OR Heat Sink-Red ALERT:

Any Loss or ANY...

The licensee equivalent EAL, CSFST status, 1.2 Core Cooling for SAE states in part:

ORANGE or RED path in F-0.2, CORE COOLING The phrase "ORANGE or RED path in F-0.2, Core Cooling," was inconsisterit with the text ofNUNC Table 4 in that an Orange or Red path for core cooling was not considered in the guidance as a loss or potential loss ofthe RCS barrier. The basis document provided the followingjustification for this departure:

"CSFST Core Cooling - ORANGE..."

The assumption that the RCS barrier is lost when a Core-Cooling Orange or Red path exists was not adequately justified. The licensee should provide additional justification to show that the additional conservatism afforded by relying on the singular CSF ofthis EALclearly demonstrates a challenge to both the RCS and Fuel Clad barriers, or modify the EAL scheme to be consistent with the NUMARCcriteria.

Refer to Response to General RAI43 [Para. 3] [Subpara.

51 forjustification of use ofORANGE or RED path core cooling as a RCS loss indicator. Use ofthis CSF as a RCS loss indicator is not a conservatism, but rather one ofmultiple indications ofpotential Fuel Clad and RCS barrier loss available to the user.

While this CSF indicator by itselfrequires declaration ofa Site Area Emergency, itis not inconsistent withMB~C. For example, NUMARC/NESP-007 specifies RED path Heat Sink as both a potential loss of fuel clad and RCS barriers. Even though MB~C/NESP-007 does not R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION provide a basis for how RED path heat sink relates to RCS barrier potential loss, none the less, a Site Area Emergency is required based on this singular CSF.

The NUMARCcriteria for "Fuel Clad Barrier Example EALs" (Table 4.

Fission Product Barrier Reference Table), "

l l"

states in part:

Not Applicable Level LESS than (site-specific) value NUMARCTable 4 also states:

ALERT:

Any Loss or ANY...

The licensee equivalent EAL, Category 3.0, Reactor Coolant System, for SAE 3.1.3 states in part:

"RVLIScannot be maintained..."

~lllME I

h l

f th EALth h ld b '

d d,th MB~C criteria provides for declaration ofan Alert on loss ofone barrier, i.e., when water level drops to top ofactive fuel. The licensee's EALs required a declaration ofa SAE. This inconsistency with the MB~C criteria was not technically justified in the bases document. Furthermore, the licensee treated reactor vessel level as an EALreflecting Reactor Coolant System integrity, whereas the NUMARCcriteria utilizes level as a fuel integrity EAL. The licensee should provide additional justification to show that the added conservatism afforded by relying on the singular EALofreactor vessel water level for declaration ofa Site Area Emergency is warranted, or modify the EAL scheme to be consistent with the NUMARCcriteria.

As described in Response to General RAI¹3 [Para. 3] [Subpara. 5], RCS inventory is never intentionally reduced to the top offuel (43% RVLIS) under hot conditions or power operations.

Areduction in RCS volume ofthis magnitude indicates a significant breach ofthe RCS barrier since no intentional valving configuration would result in such a decrease.

Any condition which results in an inventory loss ofthis magnitude must be attributed to a RCS breach caused by a RCS line break or unisolated primary system discharging in excess ofmakeup capacity. Itwould be extremely poor judgment to assume that a loss ofthe RCS barrier has not occurred under this condition. Important to this basis is, for the purpose ofemergency

R, E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION declaration, the potential release offission products to the environment. In the case where the fuel clad is actually or potentially breached, the assumption that the fission products would be contained, even in the absence ofother RCS loss indicators, with vessel level below the top offuel is inappropriate.

As stated above, it requires a significant RCS inventory loss to attain this level. Therefore, considering vessel level below the top offuel a loss ofRCS is not conservative, but appropriate.

It should also be noted that vessel water level below the top offuel is considered a RCS barrier loss in the BWR fission product barrier EALs.

There is no difFerence in the mechanisms which could cause vessel level to drop below the top offuel between BWRs and PWRs.

There is also a conflict withinNUIT/NESP-007 regarding vessel water level. As stated in the RAI, NUMARC/NESP-007 would only require declaration ofan Alert due to vessel level below the top offuel based on fission product barrier loss. The fission product barrier loss EALs only apply under power operations and hot condition. Yet system malfunction IC SS5 requires declaration ofa Site Area Emergency for vessel level resulting in core uncovery when in cold shutdown or refueling modes. This would mean that without other RCS loss indicators, ifthe vessel level dropped to below the fuel under hot conditions, the emergency would have to be upgraded to a Site Area Emergency ifthe plant achieved cold conditions.

Table 4 in NUIVCARC/NESP-007 requires the declaration ofa General Emergency when there is:

Loss ofANYTwo Barriers AND Potential Loss ofThird Barrier The licensee's EAL4.2.2, "SG Tube Rupture w/ Secondary Release," states the a General Emergency willbe declared when:

"Release ofsecondary side to atmosphere..."

This EALprovides indications ofloss ofthe fuel clad barrier and loss ofthe containment barrier. The licensee's use of0.1 gpm primary to secondary leakage as an indication ofa potential loss ofthe RCS barrier was not adequately justified. The licensee should provide additional information that demonstrates the adequacy ofthis threshold for potential loss ofthe RCS or revise the EALto be consistent with the NUMARCguidance.

Thi n i 1

r h

~rr~~ The conditions referenced by this justification represent a loss of'CS in conjunction with a loss ofcontainment and thus were revised to R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION reflect a Site Area Emergency.

EALs derived from combinations ofunisolable secondary side line break with SG tube rupture in combination with any fuel clad loss/potential loss indicators result in a General Emergency.

The NUMARCcriteria for "Containment Barrier Example EALs" (Table 4, Fission Product Barrier Reference Table), "

ri

~~states in part:

8 Not applicable NUMARCTable 4 also states:

Containment-Red UNUSUALEVE%X:

ANYLoss or ANYPotential Loss ofContainment" The licensee equivalent EAL, CSFST status, 1.5 Containment for GE states in part:

"RED path F-0.5, CONTAINMENT" The bases document states in part:

"CSFST Containment - RED path is entered..."

Section 3.9 ofthe NUMARCdiscussion concerning Emergency Action Levels states in part:

"Itreasonably follows that ifany CSF enters a RED..."

However, the licensee stated in the basis document, itis not possible to reach that condition without other indicators. Classifications based upon the NUMARCguidance are not made based upon sole indicators such as "CSFST Containment - RED," but rather a combination ofindicators. Therefore, the licensee should provide additional justi6cation to show that the added conservatism afForded by relying on the singular CSF ofthis EALfor declaration ofa General Emergency is warranted, or modify the EALscheme to consistency with the NUM%BC criteria.

This comment also applies to EAL4.3.1, "Combustible Gas Concentration."

Refer to Response to General RAI 03 [Para. 3] [Subpara. 2]. Itwould be inappropriate not to declare a General Emergency based on a valid indication ofcontainment pressure in excess of60 psig resulting from a loss ofreactor coolant, regardless ofthe availability ofother fuel clad and RCS barrier loss EALs. Itis understood that ifother applicable fuel clad and RCS barrier loss

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION indicators are available, they would serve to confirm their respective barrier losses. But MQ~C/NESP-007 does not require confirmation by multiple barrier loss indicators for a single barrier. That is, any one valid barrier loss indicator is sufBcient to consider that barrier lost. The basis supporting declaration of a General Emergency upon entry into RED path containment is that itis indicative ofloss ofboth fuel clad and RCS with potential loss of containment.

The only source ofsignificant hydrogen concentration in containment is severe fuel damage resulting &om metal-water reaction and subsequent discharge into the containment atmosphere.

A containment hydrogen concentration of4% corresponds to at least 25% metal-water reaction (Figure 3 EPIP 2-16 "Core Damage Estimation" ) and is'ell into the possible uncoolable core geometry region (Figure B-10 NUREG/BR-0150, Vol. 1, Rev.

2). Failure to declare a General Emergency, based on a valid indication, under these conditions is inappropriate.

The licensee's PEG bases for RCS Leak Rate, RCS 2.2 states in part:

"...two charging pumps are required for normal liquidinventory control."

The PEG bases for SG Tube Rupture, RCS 3.2 states in part:

"...one charging pump is required for normal inventory control."

The licensee should correct the inconsistency and assure that any deviation from NUIKARCcriteria of'exceeding the capacity ofone charging pump in the normal charging mode are technically justified.

Th 2

nr n i n

Ginna,by design, normally has two charging pumps running. The specified leak rate is the capacity ofone charging pump as specified by NUNARC/NESP-007 since both pumps are required to maintain normal CVCS operation.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The licensee used Table 4.1, Fuel Clad Loss Indicators, and Table 4.2, Fuel Clad. Damage Indicators, in the EALs as follows:

Table 4.1 Fuel Clad Loss Indicators 1.

Coolant activity...

Table 4.2 Fuel Clad Damage Indicators ORANGE or RED path in F-0.2,..

~

COdtdddtdd SR II I 't, II SAR, I I emergency 4.1.4 referred to Table 4.1 as fuel clad "loss" indicators; general emergency, 4.1.5 referred to Table 4.2 as fuel clad "damage" indicators. No distinction between "loss" and "damage" used in the EALtable titles was made.

The licensee should clarifythe difference between fuel clad loss and fuel clad damage.

Table 4.1 identifies fuel clad loss indicators for use in combination with the RSSI dtt t'~i dl t

("SKIS' tl signal due to LOCAwith less than minimum operable containment heat removal equipment"). Table 4.2 includes fuel clad loss and potential loss indicators for use in combination with RCS~ and containment ~

indicators.

E h

lin h 1 l

'ni rli ni n

'h h fi in r rri r m rix The term "fuel clad damage indicators " was used to represent both fuel clad loss and potential loss indictors, The term 'fuel clad loss indicators" was used to represent fuel clad loss indicators only.

The NUMARCcriteria for Fuel Clad and RCS Barrier Example EALs utilizingContainment Radiation Monitoring as the EALthresholds state in part" "FUEL CLADBARRIEREXAMPLEEALs...". ~.

The equivalent R.E. Ginna EALs (Category 2.0, Reactor Fuel) state in part:

"2.3 Containment Radiation..."

"2.3.1 Alert..."

"2.3.2 Site Area Emergency..."

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION "2.3.2 General Emergency..."

There were no equivalent Category 3.0 Reactor Coolant System EALs.

However, the PEG for the RCS Barrier EALs (RCS4.1) utilizingContainment Radiation Monitoring as the EALthreshold states in part:

"Containment radiation monitoring..."

The PEG Bases information accompanying the EAL states in part; "The ~1f~r reading is a..."

The Technical Basis information for Category 2.0 Reactor Fuel, EAL 2.3.1, states in part:

"The 10 R/hr reading is a value..."

No additional justification information was included in either ofthe bases

'information as to why a RCS leak EALwas included in the Reactor Fuel category, and omitted from the Reactor Coolant System category.

The licensee should include the NUMARCcriteria for discerning reactor coolant system leaks utilizingcontainment radiation monitoring or provide justification for omittingit from the RCS category. The licensee should also provide the site specific analyses for calculating these containment radiation monitor setpoints.

As discussed in Response to General RAI C3 [Para. 3] [Subpara. 2], the Ginna EALpresentation method places similar EALs into categories and subcategories that focus the user's attention to the specific EALthreshold that corresponds to the plant condition ofconcern. This provides a logical classification and escalation path ofrelated indicators and thus allows for rapid assessment of emergency conditions associated with fission product barrier loss. Itis important to note that the Ginna EALcategories and subcategories are not representations or abbreviations ofthe NUNARC/NESP-007 ICs. Rather, each Ginna category and associated subcategory is a pathway from broad indicators ofpotential emergency events to a set ofspecific threshold conditions that require emergency classification.

r h

n 1

il'lfi in n nn h

r r n

The values for EALs 2.3.1, 2.3.2 and 2.3.3 were derived from the R-29/R-30 "Dose Rate versus Time After Shutdown" curves, Attachment 10 to EPIP 2-16

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION "Core Damage Estimation." These curves are taken from "Technology for Energy Report No. R-81-012."

EAL2.3.1:

Using the 100% coolant release line, the corresponding dose rate is approximately 10 R/hr at 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after shutdown. This value was also selected because ofit's operational significance, entry into FR-Z.3 "Response to High Containment Radiation Level" EALs 2.3.2 and 2.3.3:

Using the RG 1.25 100% gap release line and 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after shutdown, the corresponding dose rate is approximately 5000 R/hr. The EAL 2.3.3 value of 1000 Rfhr represents 20% ofthe 100% value. The EAL2.3.2 value of 100 R/hr represents 2% ofthe 100% value. Four hours after shutdown was conservatively assumed since actual containment samples results would likelybe available to assess core damage withinthis time frame. Also, the rate ofdecay ofcontainment dose rates with time beyond four hours is minimal.

The MB~C criteria for Containment Barrier Example EALs utilizing Containment Radiation Monitoring as the EALthresholds state:

CONTAINMENTBARRIER EXAMPLEEALs i

i n

i The equivalent R.E. Ginna EALs (category 2.0, Reactor Fuel) stated:

"2.3 Containment Radiation..."

There were no equivalent Category 4.0 Containment EALs. However, the PEG for the Containment Barrier EALs (PC5.1) utilizingContainment Radiation Monitoring as the EALthreshold stated:

"Containment radiation monitoring..."

The PEG and Technical Bases information accompanying this EALstated:

"The ~i~Qg reading is a value..."

Section 3.8 ofthe IGBdARC discussion concerning Emergency Class Thresholds addressed the subject ofsignificant radioactive inventory within containment is not possible unless a major fuel cladding failure has occurred.

Thus itis possible to consider accepting an EALthat is inconsistent with

'able 4 (i.e., a GE vs. UE) for the same rationale as in Comment ¹9. That is, such an EALis conservatively anticipatory since the containment with large radioactive inventory is "...an extreme challenge to a plant function necessary

R. E. Ginna Emergency Action Levels

'ESPONSE TO REQUESTS FOR ADDITIONALINFORMATION for the protection ofthe public..." However, as the licensee stated in the basis document, itis not possible to reach this condition without other indicators.

Classifications based on the NUMARCguidance are not made based upon sole indicators such as Containment radiation monitor R-29/R-30 reading >

1000 H/hr, but rather a combination ofindicators.

The licensee should provide additional justification to show that the added conservatism afforded by relying on the singular radiation monitor reading of this EALfor declaration ofa General Emergency is warranted, or modify the EALscheme to be consistent with the NUMARCcriteria. The licensee should also provide the site specific analyses used to determine the containment radiation monitor setpoints.

Refer to Response to Specific RAI¹14.

The value of 1000 H/hr, which is indicative ofsignificant radioactive inventory in containment (20% clad damage), bounds the values ofboth the RCS loss (10 H/hr) and the fuel clad loss (100 H/hr) EALs. Exceeding this value requires declaration ofa General Emergency. MB~C/NESP-007 does not specify that multiple fission product barrier loss indicators must be present to consider that barrier lost. The logic term used between each fission product barrier loss/potential loss indicator in Table 4 is "OR". This means that any one indicator is suf6cient to consider the barrier lost or potentially lost. Furthermore, NUMARC/NESP-007 does not state that the same indicator should not be used to indicate the loss ofmore than one fission product barrier.

NUINARC/NESP-007 also states in part:

"5.

Signifzcant Radioactive Inventory in Containment" "The (site-speci jic) reading is a value which indicates signif'scant fuel damage wellin excess ofthe EAIs associated with both loss ofFuel Clad and loss ofRCS barriers. As st'ated in Section 3.8, a mqjor release ofradioactivity requiring offsite protective actions from core damageis not possible unless a mqjor failure offuel cladding allows radioactive

'aterial to be released from the core into the reactor coolant.

Regardless ofwhether containment is challenged, this amount of activityin containment, ifreleased, could have such severe consequences that itis prudent to treat this as a potential loss ofcontainment, such that a General Emergency declaration is warranted..

~."

Itis also important to note that itis not expected that emergency classification'would be based on containment radiation alone. Provided that other indicators are available, classification would be confirmed by those redundant indicators. But, in the event ofa severe accident, many ofthe other indicators ofmultiple fission product barrier loss may not be available.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION Therefore, itwould be appropriate to rely on this single indicator since itis indicative ofmultiple fission product barrier loss/potential loss.

The NUMARCexample for SU4-1 states:

(site-specific) radiation monitor..."

The licensee equivalent EALs under 2.1.1, "Coolant Activity,"and 2.2.1, "Failed Fuel Detectors" state:

"Coolant sample activity..."

The licensee should provide additional information to justifythe~ logic in the second argument ofEAL 2.1.1. The licensee should also demonstrate how EAL2.2.1 is equivalent to EAL 2.1.1.

Ginna Technical Specification 3.1.4.1 for coolant activity specifies two limits.

The firstlimitis specified as 84/E-bar pCi/cc total specific activity. The second limitis defined as >0.2 p,Ci/cc I-131 equivalent and the conditions of section 3.1.4.3b are exceeded.

Section 3.1.4.3.b allows continued operation under this condition for up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> provided the I-131 equivalent activity is below the limitshown on Figure 3.1.4-1. The Figure 3.1.4-1 activitylimitis a function ofrated thermal power.

EAL2.2.1 specifies a Letdown monitor R-9 reading of>2 R/hr. EPIP 2-16 "Core Damage Assessment" Section 6.2.1 specifies that this value corresponds to 1% fuel rod cladding defects.

The Ginna Technical Specifications Section 3.1.4 coolant activity basis states in part: "The total activitylimitfor the primary system corresponds to operation with the plant design basis of 1%

fuel defects." (FSAR Table 9.2-5).

NUMARCIC SS5, "Loss ofWater Level in the Reactor Vessel That Has or WillUncover Fuel in the Reactor Vessel," provides the followingexample EALfor declaration ofa Site Area Emergency:

Loss ofReactor Vessel..."

The licensee equivalent EALunder 2.4.3, "Refueling accidents or Other Radiation Monitors," states, for an Alert:

"Report ofvisual..."

The licensee's technical basis for this EALspecifically includes declarations for fuel uncovery in the reactor vessel. This deviation from NUMARCwas

R. E. Ginna Emergency Action Levels RESPONSE TO.REQUESTS FOR ADDITIONALINFORMATION not justified. The licensee also did not include the anticipatory wording of MBrIARCwhich requires declaration when indicators show that the fuel will be uncovered.

The licensee should provide justification for these deviations or revise the EALto be consistent with the NUMARCguidance.

EAL2.4.3 is not the equivalent ofNUMARCIC SS5. The technical basis I NI tt ttN EALI d 'd NEINAECIEAA22. ENN 1

11 in r

r vi The EALderived from MJMARC IC SS5 is 3.1.3 "RVLIScannot be maintained > 43% with no RCPs running OR With the reactor vessel head removed, itis reported that water level in the reactor v'essel is dropping in an uncontrolled manner and core uncovery is likely." This EALprovides the anticipatory wording ofNUMARCIC SS5. The term "cannot be maintained" is defined in the definition section ofthe technical bases:

"The value ofthe identified parameter(s) is not able to be kept above /below specified limits.

This determination includes making an evaluation that considers both current and future system performance in relation to the current value and trend ofthe parameter(s)..."

The mode applicability was expanded to ALLin consideration for the inclusion ofwater level below top offuel as an RCS potential loss indicator (refer to Response to Specific RAI 49).

The NUMARCexamples AA2-3 and AA2-4 were not addressed in the licensee's classification scheme.

These example EALs state:

"Water level less than..."

The licensee should include site-specific EALfor these examples or provide technical justification for their omission.

As stated in the basis for IC AA2in the Ginna PEG: "There is no indication that water level in the spent fuel pool or refueling cavity has dropped to the level ofthe fuel other than by visual observation.

Since AA2.2 addresses visual observation offuel uncovery, EALAA2.3 is unnecessary.

Since there is no level indicating system in the fuel transfer canal, visual observation ofloss ofwater level would also be required, EALAA2.4 is unnecessary."

Therefore, EAL2.4.3 addresses the concerns ofthese example EALs.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NUMARCexample for SU1-1 states:

"The followingconditions exist,"

The licensee's equivalent EALfor Loss ofAC Power Sources, Unusual Event.

6.1.1 stated

"Loss ofabilityto supply..."

The NUMARCcriteria specifically requires a site specific minimum emergency generator supply to the emergency busses.

The licensee did not provide a site specific minimum emergency generator electrical supply to the emergency buses in the EAL. The PEG specified that both emergency diesel generators are capable ofsupplying power to the safeguard buses.

The NUMARCcriteria requires that emergency generators are actually supplying power.

The licensee should provide additional justification for the deviation from the NUINARCcriteria or revise that EAL to achieve consistency.

The statement "Atleast (site-specific) emergency generator are supplying power to emergency buses" serves no purpose.

This EALis concerned only with the loss ofoff-site AC power capability. Ifone ofthe emergency diesels is not supplying its emergency bus under hot conditions then an Alert would be declared based on EAL6.1.3 (SA5). NUMARCprovides no criteria for the condition in which offsite AC power capability is lost and one emergency diesel generator is not supplying it's emergency bus under cold conditions. If neither emergency diesels are supplying their emergency busses, either an Alertwould be declared based on EAL6.1.2 or a SAE based on EAL 6.1.4, depending on plant operating mode.

The NUMARCexample SU7-1 states:

"1.

Either of the followingconditions..."

The licensee equivalent EALfor loss ofDC power, Unusual Event, 6.2.1 stated:

"< 105 vdc bus voltage..."

The MBrIARCcriteria specifies that the loss ofDC voltage is unplanned.

This EALapplies to cold shutdown and refueling, and planned work that de-energizes the DC buses should not trigger a declaration.

4 The licensee should revise this EALto achieve consistency with the NU)rIARCcriteria or provide technical justification for the deviation.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION Both DC buses would never be de-energized for any planned activity unless the reactor was defueled.

The NU1NARC example SA1-1 states:

"1.

The followingconditions exist:..."

The licensee equivalent EALfor Loss ofAC Power Sources, Alert, 6.1.2 stated.

"Loss ofall safeguards bus..."

The NUIKARCcriteria specifies a site specific list oftransformers and generators.

The licensee did not provide a site specific listin this EAL, but did specify the site specific power requirements in the PEG.

The licensee should revise this EALto achieve consistency with the MB~C criteria or provide technical justification for the deviation.

The concern ofNUMARCIC SA1 and this EALis the loss ofability to provide AC power to the safeguards busses and their vital loads. A condition can exist where the supply transformers and/or emergency diesel generators are available but a fault on the bus precludes powering vital loads. Therefore it is more appropriate and inclusive to define the EALby the inabilityto power the safeguards buses rather than the loss ofthe power sources.

The MB~C example SA2-1 states:

(Site-specific) indication(s) exist that indicate..."

Licensee equivalent Initiating Condition in the PEG stated:

"SA2 Failure ofReactor Protection..."

The licensee equivalent EAL, CSFST status, 1.1.1 Alert stated:

"ORANGE or RED path F-O.l..."

The licensee Initiating Condition and EALdeviated from the NUMARC criteria. NUINARCbases the Alert on the failure ofthe automatic protection system to respond to the established setpoint. The licensee added the additional, inappropriate condition that a manual scram was also ineffective, which should escalate the event to a SAE. The licensee's technical basis R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION states, This EALaddresses any manual trip or automatic trip signal followed by manual trip which fails to shut down the reactor to an extent requiring emergency boration. The licensee identified this difFerence as a deviation in the PEG but did not provide justification for the deviation in the technical bases.

The licensee should revise that EALto achieve consistency with the NUMiARCcriteria or provide technical justification for the deviation. For additional guidance on this IC the licensee should reference the "Questions and Answers" on NUMARC/NESP-007, published in June 1993.

As stated in the PEG: "This IC and resulting EALhave been specifically modified to more accurately define the condition described by the generic bases as applied to pressurized water reactors.

The failure ofautomatic initiation ofa reactor trip followed by successful manual initiation actions which can be rapidly taken at the reactor control console does not pose a potential loss ofeither fuel clad or RCS boundaries. Itis the continued criticalityunder conditions requiring a reactor scram which poses the potential threat to RSC or fuel clad integrity. Ifan ORANGE path exists on F-0.1, CRITICALITYafter immediate attempts to trip the reactor have been taken, there has been a failure to shut down the reactor, but without substantial heat generation. Ifa RED path exists on F-0.1, CRITICALITY aRer immediate attempts to trip the reactor have been taken, there has been a failure to shut down the reactor, with substantial heat generation.

Either ofthese conditions may represent a potential loss ofthe fuel clad boundary, and thus warrant a declaration ofALERT. Amanual trip is any set of actions by the reactor operator(s) at the reactor control console which causes control rods to be rapidly inserted into the core and brings the reactor subcritical (e. g., reactor trip button). Itis important to note that the failure ofthe reactor protection system to initiate an automatic trip does not infer actual or potential failures ofother systems nor is it, in and ofitself, a precursor to fission product barrier degradation.

The RPS serves no other safety function but to initiate reactor trips. Therefore, once the reactor has been successfully tripped, failures in the RPS system can have no plant safety impact. Ifimmediate manual actions to trip the reactor are successful followingrecognition ofan automatic trip failure, there is no threat to either plant safety or fission product barrier integrity related to the automatic trip failure. This deviation is consistent with the philosophy ofmaking accurate vs. conservative classifications."

Itis also important to note the response to NUMARC/NESP-007 "Questions

&Answers" General question 09:

Q: If, aRer the fact, itis discovered that an event has occurred that caused an EALto be reached without adverse consequences, should a classification declaration be made?

A: Ifan emergency condition no longer exists, there is no reason to declare an emergency.

The NRC shall be notified aker discovery within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, meeting 10CFR50.72 reporting criteria...."

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NlB/IARCEALSA2, as written, would not have to be declared, based on this criteria, absent exceeding another fuel clad or RCS barrier breach EAL.

Given that the NUMARC/NESP-007 EALSA2 represents neither fission product barrier loss or potential loss nor involve actual or potential substantial degradation ofthe level ofsafety ofthe plant, itis inappropriate

=to declare an Alert classification.

The NURLARC example SA3-1 states:

"1.

The followingconditions exist..."

The licensee equivalent EALfor system failures, Alert, 7.2.4 stated:

"Reactor coolant temperature.

~."

The licensee EALdid not include the required technical specification functions to maintain cold shutdown and did not include the anticipatory philosophy related to an uncontrolled temperature rise. The licensee justified the omission ofthese attributes in the Technical Basis document with the statement:

"Areactor coolant..." Without the anticipatory declaration that would occur with the loss ofshutdown functions or uncontrolled rise in temperature, the EALis inadequate.

Therefore, the licensee should modify the EALto achieve consistency with the NUMARCcriteria, or provide additional justification for the deviation.

The Ginna Technical Specifications do not specify required functions to maintain cold shutdown. EAL7.2.4 is derived from IC SA3 which states:

"Inabilityto Maintain Plant in Cold Shutdown." The anticipatory criteria is provided in the use ofthe term "cannot be maintained." The definition section ofthe Technical Bases Document defines the term as follows: "The value ofthe identified parameter(s) is not able to be kept above /below specified limits. This determination includes making an evaluation that considers both current and future system performance in relation to the current value and trend ofthe parameter(s).

Neither implies that the parameter must actually exceed the limitbefore the action is taken nor that the action must be taken before the limitis reached."

NUMARC/NESP-007 "Questions and Answers" published in June 1993 defines the term

'function's:

"The action which a system, subsystem or component is designed to perform." The evaluation ofboth current and future system performance (function) is inherent in this definition of"cannot be maintained."

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The MBrfARCexample SS1-1 states:

"1 Loss ofall offsite and onsite AC..."

The licensee equivalent EALfor Loss ofAC Power Sources, SAE, 6.1.4 stated:

"Loss ofall safeguards..."

The NUMARCcriteria specifies a site specific list oftransformers and generators.

The licensee omitted a site specific list oftransformers and generators.

The licensee omitted a site specific listin the EAL, but did specify the site specific power requirements in the PEG.

The licensee should revise this EALto achieve consistency with the NIJMARC criteria or provide justification for the deviation.

Refer to Response to Specific RAI 021 The NUMARCexample SS2-1 states:

"1.

(Site-specific) indication exist that..."

The licensee equivalent EAL, CSFST status, 1.1.2 stated:

"RED path F-0.1..."

The Subcriticality Red Path is entered based upon failure ofpower range indication to decrease below 5% followinga reactor trip. This condition by itselfwould be an adequate EALexcept the licensee has added other conditions that were inconsistent with the NUMARCcriteria. Therefore, the licensee should revise this EALto achieve consistency with the MB~C criteria, or provide adequate justification for the deviation.

As stated in the PEG: "CSFST Subcriticality - RED path is entered based on failure ofpower range indication to decrease below 5% followinga reactor trip. This portion ofthe EALaddresses any manual trip or automatic trip signal followed by a manual trip which fails to shut down the reactor to an extent that the reactor is producing more heat load for which the safety systems were designed.

This condition indicates failure ofboth the automatic and manual protection systems to trip the reactor in conjunction with a failure ofalternate boration systems to reduce reactor power below decay heat levels. The combination offailure ofboth front line and backup protection systems to function in response to a plant transient, along with the continued production ofheat poses a direct threat to fuel clad and RCS

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION integrity and thus warrants declaration ofa Site Area Emergency.

15 minutes is specified to allow time for emergency boration to be effective and provides a discriminator between SA2.1 and SS2.1. The classification should be made as soon as itis apparent that emergency boration is not or willnot be effective in reducing reactor power below 5%."

Itis the failure ofboth primary and backup means ofreactor shutdown systems which represents an event which involves actual or likelymajor failures ofplant functions needed for the protection ofthe public.

The NUMARCexample for SS4-1 states:

"1.

Complete loss ofany..."

The licensee equivalent EAL, RCS Leakage 1.3.1, for SAE stated:

"RED path in F-0.3, HEAT SINK" The NUMARCcriteria specifies complete loss offunctions required for hot shutdown, including the ultimate heat sink and reactivity control. The licensee EALdid not address the loss offunctions required for hot shutdown.

Entry into CSFST Red Path did not provide the anticipatory declaration that loss offunctions would.

The licensee should revise this EALto achieve consistency with the IAJMARCcriteria, or provide adequate justification for the deviation. The licensee should also provide information on their disposition ofthe function of core cooling in relation to this IC.

Ginna Technical Specifications Section 1.2 defines hot shutdown as:

Reactivity LQdk% 5 -1 and Tavg 2540 'F. Since the hot shutdown mode has no upper defining limitfor coolant temperature, the ability to achieve and maintain hot shutdown is only a function ofreactivity control. EAL 1.1.2 addresses loss ofreactivity control. The NUMARC/NESP-007 basis for SS4, while not supporting the IC or example EAL, does state that the EALis intended addresses loss offunctions, including ultimate heat sink. No reference to core cooling is made. 'However, EAL 1.2.1 and EAL3.1.3 provide for the declaration ofa Site Area Emergency under conditions which loss of functions threaten core cooling. Itis also important to diQerentiate between function and operability ofcomponents or equipment which support a function. IAB~C/NESP-007 "Questions and Answers" published in June 1993 defines 'function's: "The action which a system, subsystem or component is,designed to perform. Safety functions, as applied to PWRs are reactivity control, RCS inventory control and secondary heat removal."

MBrIARC/NESP-007 Section 3.9 states "There are diverse and redundant plant systems to support each CSF. By monitoring the CSFs instead ofthe individual system component status, the impact ofmultiple events is

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION inherently addressed, e.g., the number ofoperable components available to maintain the function." Since itwould be impossible to define all possible losses ofsystem component operability under which loss offunction may occur, consistent with Section 3.9 ofNUNARC/NESP-007, the loss offunction is defined by CSF status.

For secondary heat removal, that CSF is RED path heat sink. Th T hni l

n r

2 21 n

l The NUMARCexample SS5-1 states:

"OPERABILITYMODE APPLICABILITY:

Cold Shutdown..."

The licensee equivalent EAL, RCS Leakage 3.1.3 for SAE stated:

"RVLIScannot be maintained..."

The NUMARCcriteria specifies evaluation ofdecay heat removal for this event since the criteria applies for the shutdown condition. The licensee did not include this criteria in the EALsince the EALwas intended to apply to all operating modes.

However, the EALwas self-contradictory in the mode applicability cannot be ALL...With the reactor vessel head removed.

Therefore, the licensee should revise this EALto achieve consistency with the NUNC criteria and clarity ofmeaning, or provide adequate justification for the deviation.

The MB~C IC from which EAL3.1.3 is derived is NUMARCIC SS5: "Loss ofWater Level in the Reactor Vessel That Has or WillUncover Fuel in the Reactor Vessel." There are numerous conditions which can lead to a loss of RCS inventory to the extent resulting in core uncovery while in cold shutdown or refuel modes.

The one addressed in the generic bases for PWRs is "sequences such as prolonged boiling followingloss ofdecay heat removal."

Loss ofinventory can also occur as a result ofdrain down events.

The concern ofthis IC and EALis uncovery ofthe fuel, regardless ofthe cause.

Therefore the criteria regarding loss ofdecay heat removal serves no function. The EALwording provides for the anticipatory criteria. The mode applicability was expanded to include the inabilityto maintain RVLIS above top offuel consistent with use ofRVLISlevel as a RCS barrier loss indicator.

Refer to Response to Specific RAI49. The EALdoes not implythat the reactor vessel head can be removed while in hot condition. Since this configuration would never occur under hot conditions, that portion ofthe EAL based on visual observation would not apply or be evaluated.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NI.JMARC example SS6-1 states:

"1.

The followingconditions exist:..."

The licensee equivalent EALfor Equipment Failures, SAE, 7.3.4 stated:

"Loss ofannunciators or indications..."

The NUMARCcriteria speci6es that Compensatory non-alarming indications are unavailable. Although the PEG reflected a "modified"EALof

~PA

'I Al,tl'pecificity was lost in the translation to the Technical Bases and the EAL Categories.

(Based upon limited information available, the reviewer had to assume the PPCS and SAS were not located on the panels ofTable 7.3). No justification was provided in the technical bases for the omission. Therefore, the licensee should revise this EALto achieve consistency with the NUMARC criteria and clarity ofmeaning, or provide adequate justification for the deviation.

Items (b.) and (c.) ofthis EALin the Ginna PEG were combined into a single statement "Complete loss ofability to monitor all critical safety function status." As stated in the RAI, PPCS and SAS are compensatory non-alarming indications. Ifeither ofthese sources are functional, critical safety function monitoring is available.

The NUMARC example SG1-1 states:

"Prolonged loss ofall offsite and onsite..."

The licensee equivalent EALfor Loss ofAC Power Sources, GE, 6.1.5 stated:

"Loss ofall safeguard bus AC..."

NUMARCemploys the wording that Restoration......is NOT likely. The licensee used the wording "Power cannot be restored...".

The NUMAHC"not likely"implies that as soon as itis known that power willnot be restored the threshold has been exceeded, whereas the licensee "cannot": implies that power restoration must be a "known" quantity before a licensee declaration.

The NUlrfARCintent is that the condition is met as soon as itis known that power restoration is not likelywithin the speci6c time limit. Further, the

'icensee did not employ the concept ofIMMINENTreferred to in NUII~C Table 4 and discussed in the NUINARCbased information for this Initiating Condition.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NU1KARC criteria specifies a site specific list oftransformers and generators.

The licensee did not provide a site specific listin this EAL although site specific power requirements were specified in the PEG.

The licensee should revise this EALto achieve consistency with the NUMARCcriteria and clarity ofmeaning, or provide adequate justification

.- for the deviation.

~

Q

]

f f r

w r

~

44 The concern ofNUITIC SG1 and this EALis the loss ofability to provide AC power to the safeguards buses and their vital loads. A condition can exist where the supply transformers and/or emergency diesel generators are available but a fault on the bus precludes powering vital loads. Therefore it is more appropriate and inclusive to define the EALby the inabilityto power the safeguards buses rather than the loss ofthe power sources The NUMARCexamples SG2-1 and -2 state:

"1.

(Site-specific) indications exist that automatic..."

The equivalent licensee EALwas found in Category 1.0, CSFST Status, 1.3.2 General Emergency, which stated:

"RED path in F-0.3, HEATSINK.."

The NUINARClogic ofcore cooling OR heat removal was omitted from the licensees EALs (and the Technical Bases Document) notwithstanding that the logic was included in the PEG.

The licensee should revise this EALto achieve consistency with the MJMARC criteria, or provide adequate justification for the deviation.

2h

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NUMARCexample HU1-3 states:

"Assessment by the control room. ~."

The licensee equivalent EALfor Hazards, Unusual Event, 8.4.3 stated:

"Assessment by Control Room personnel.

~."

The NUMARCcriteria is unrestricted with the modifying verbiage "precluding access to a plant vital area, Table 8.3." The licensee restricts the declaration to natural events that preclude access to vital areas without justification in the technical bases.

The licensee should revise this EALto achieve consistency with the IAJMARCcriteria, or provide adequate justification in'the technical bases.

EAL 4

The NtB~C example HU4-1 and -2 states:

"1.

Bomb device discovered withinplant..."

The licensee equivalent EALfor hazards, Unusual Event, 8.1.1 stated:

"Bomb device or other..."

The NUINAHCcriteria suggests that other security events which may potentially impact plant safety should be the subject ofa declaration, however the additional EALwas omitted from the licensee's EALcategory.

The Technical Bases Document stated, "This EALis based on the REGNPS Security Contingency Plan. Security events which do not represent at least a potential degradation in the level ofsafety ofthe plant are reported under 10CFR73.71 or in some cases under 10CFR50.72" As written, the EALdid not permit an emergency declaration for other security events that mug represent a potential degradation ofsafety which is inconsistent with the MJMARC criteria. This discussion is also applicable to the Alert and SAE EALs but willnot be repeated.

The licensee should revise this EALto achieve consistency with the NUNC criteria, or provide adequate justification for the deviation.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION 1

1 in EAL h

1 li 1 fi The IKJNIARC example HA1-3 states:

"3.

Report ofany visible structural..."

The licensee equivalent EALfor Hazards, Alert, 8.4.7 stated:

"Assessment by Control Room personnel that..."

The NUMARCcriteria does not limitthe threshold ofdeclaration to "resulted in damage to equipment needed for safe plant operation." The intent ofthe NARC EALis that ifvisible structural damage has occurred to the building, the event was significant and has a high potential for damage to equipment needed for safe plant operation. The licensee's Technical Bases document recognized this potential with the following. "This EAL addresses events that..." However, this recognition did not carry through to the plant EAL. Anticipating the ggfg<igl damage, the declaration should be made based upon visible structural damage, not "Assessment....

damage to equipment needed

... safe plant operation."

The licensee should revise this EALto achieve consistency with the MJMARC criteria, or provide adequate justification for the deviation.

4 n

'h i

n 1 n r

The NUIMAHCexample HA2-1 states:

The followingcondition exists:

~.."

The licensee equivalent EALfor Hazards, Alert, 8.2.2 stated:

"Fire or explosion in any plant area,..."

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NUlVfARCcriteria includes the condition that "Affected system parameter indications show degraded performance." The licensee EALdid not clearly convey this NU)~C criteria.

The licensee should revise this EALto achieve consistency with the NUMARCcriteria or technically justifythe deviation.

22 The NUMARCexamples HA3-1 and 2 state:

"1.

Report or detection oftoxic gases.

~."

The licensee equivalent EALfor Hazards, Alert, 8.3.5 stated:

"Report or detection oftoxic..."

The licensee did not provide or reference measurable criteria to the emergency director for establishing concentrations that affect safe operation ofthe plant. Without such information readily available, classification would be difBcult.

The licensee should provide measurable criteria to the classifier to determine when life threatening and flammable concentration thresholds have been exceeded.

Toxic or flammable gases do not in themselves pose any threat to the safe operation ofthe plant but may preclude access to areas necessary for safe operation ofthe plant. Therefore the concern ofthis EALare concentrations which are either lifethreatening or preclude access to areas needed for safe plant operation.

No specific thresholds have been defined since specific thresholds are dependent upon the type oftoxic or flammable gas involved as well as the amount and type ofpersonal protective equipment available to those individuals requiring access.

Therefore, the determination as to whether concentrations are suQicient to be life threatening or preclude access to areas required for safe operation is leR to the judgment ofthe user. Where specific criteria are available to the user itis expected that criteria would be considered in this evaluation.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The NUMARCexample HA5-1 states:

"Entryinto (site-specific) procedure..."

The licensee equivalent EALfor Equipment Failures, Alert, 7.2.3 stated:

"Control Room evacuation" The MB~C criteria specifically initiates the declaration at the time of entry into the control room evacuation procedure.

The licensee's EALwas not specific about the time ofdeclaration and did not identify the procedure upon which declaration would be based.

The licensee should revise the EALto achieve consistency with the NUMARC criteria or provide technical justification for the deviation.

The NUNC example HS2-1 states:

"1.

The followingconditions exist:..."

The NUlNARCBasis information goes on to state: "(Site-specific) time for transfer based.

~."

The equivalent licensee EAL, 7.2.5, SAE stated:

"Control Room evacuation..."

The licensee Technical Bases Document stated:

"The time interval for transfer is based..."

Ifthe reviewer understands the licensee's basis information correctly, the basis information states that under worst case conditions it could take up to 20 minutes to regain control ofsafety systems from remote shutdown facilities. This says nothing about whether core uncovering and/or core damage could occur during the transfer period. The intent ofthe MVrfARC guidance is that a declaration ofSAE should be made after the time elapses where safety systems may be "unattended", and not incur uncovering and/or damage.

The licensee basis information did not indicate this unattended time, and the deviation of20 minutes from the inaximum criteria of 15 minutes was not adequately justified.

R. E. Ginna Emergency Action Levels RESPONSE TO REQUESTS FOR ADDITIONALINFORMATION The licensee should revise this EALto achieve consistency with the NU1NARC criteria or provide technical justification for the deviation.

min r l h rf n

"n n

'm "Th i

f The Appendix R analysis says that 20 minutes is the maximum time for which control ofplant safety systems should occur under worst case conditions. Therefore, 20 minutes is within the design criteria ofthe remote shutdown equipment.

The NU1NARC examples HG1-1 and -2 states:

"1.

Loss ofphysical control ofthe control room..."

The licensee equivalent EALfor Hazards, GE 8.1.4 stated:

Security event which result in:..."

The NUMARCcriteria utilized OR logic for the EALs whereas the licensee utilized ANDlogic. The inconsistency with the NU1NARC criteria was not justified in the Technical Bases Document.

The licensee should revise this EALto achieve consistency with the NUMARCcriteria or provide technical justification for the deviation