Reportable Deficiency:Improper Installation of Concrete Anchors Could Result in Possible Failure of safety-related Equipment During Operation.Contracts Reviewed & Engineering Change Orders Issued
ML17272A527
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/04/1979
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A525 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 7907240326
Download: ML17272A527 (4)


Text

REGULATORY I RMATION DISTRIBUTION SYST 1 (RIDS)

ACCESSI'ON NBRt79072403?6 DOC',DATE: 79/06/04 NOTARIZED! NO DOCKET FACIL!50 397 HPPSS Nuc'lear ProJecti Unft 2r Nashfngton Publ(c Powe 05000397 AUTH, NAME AUTHOR AFFILIATION

  • Nashfngton Public Power Supply System RECIP ~ NAME'ECIPIENT AFFILIATION Reckon Si San Fr ancfscoi Off)ce of the Director SUBJECT! RO!I@proper concrete anchors could result

<,nstallatfon of we'll

)n poss)ble failure'f safety re]ated equipment during

, operation.Contt acts r el)ewediengkneer $ ng change at det s

<ssued L <nstalled inserts be inspected, DISTRIBUTION CODE+ 8019S COPIES RECEIVED!LTR ' ENCL' SIZE$

CONSTRUCTION DEFICIENCY REPORT (10CFR50 ~ 55E)

'0"I ',

~

'ITLE!

>> >5~ >"<"~" u, N OTESi wawoaWWR&mWeQWamAet%&eeWweymawewmaesaooweewwaa&est%w~&a&eMIOmeetHA~&eH%&~w~~&HAE+%W

~. e RECIPIENT RECIPIENT COPIES ID CODE/NAME~ LTTR E'NCL ID CODE/NAME LTTR ENCL ACTION> 14 PM 1 15 BC 1 1 20 LA 1 1 21 AD 1 1 INTERNALS 01 REG FILE 1 1 02 NRC PDR 1 1 05 I8E 2 2 07 EDO L STAFF 1 1 08 MPA 1 09 DEPY DIR DPM 1 1 i0 ACRS'OPIES QAB 12 JORDAN'/IE 1

1 1 ii STANDRDS DEV 13FIELD COOR/IE 1

1 1

1 1

16 AD FOR ENGR 1 17 AD PLANT SYS 1 1 17 AD REAC SFTY 1 1 19 AD SYS/PROJ 1 1 22 DIR DPM 1 1 23 OELD 1 1 AD/SITE TECH 1 1 DIRECTOR DSE 1 1 GEOSCIENCES BR 1 1 STRUCT ANLYS BR 1 1 EXTERNALS 03 LPDR< 1 1 04 NSIC 1 1 24 16 16 TOTAL NUMBER OF COPIES REQUIRED! LTTR 43 ENCL

0 I

~

f<<H gf L rllhh 1 ICE/h r 'i H

r<<f<<H y f H H P a, 1 II

~

~

g

'hi(R)'H H Rq<< ff> Hy<<fI H f ra ttAA, I" hh If/ l,h %Q IH (I I f Prh>>h (gg-( gri(R) H<<) r Eh f $ <<EEhg R

<< ~h '0 1 I

'i 14 g~E EH I' I << f II EEH EH Ka t<< f 1 (-hh

~Ca

'll hl H f 1) lil Ji if 0 i f

i it i fg 1 hhi hh

~

~

II aa w .* <<a aa aaa<<a ~ a( . 'laa EH(HR r 'H ~ - EQ E Uaaa<< ~ ~ raa r = = E r ~ a <<Ea'HEE a ii lh Il

(

IHH l'i

<<fk h~

I H)r()H(

E U

I lii <<>>

<<H II

'I I 1

MPPSS NUCLEAR PROJECT NO. 2 REPORTABLE DEFICIENCY AND CORRECTIVE ACTION FOR IYiPROPER INSTALLATION OF CONCRETE ANCHORS ilashington Public Power Supply System Docket No. 450-397 License No. 8CPPR-93 NATURE OF DEFICIENCY Improper installation (under expansion) of concrete anchors.

SAFETY IMPLICATION The improper installation, if left uncorrected, could cause these concrete anchors to fail. Subsequently, this could result in failure of safety related equipment during the operational life time of the Nuclear Power Plant.

CORRECTIVE ACTION Procedures of affected contracts have been reviewed. Engineering change orders, updating the installation and inspection requirements, including a retrofit program, have been issued to all contractors whose procedures did not assure proper installation. Installed inserts will be tested/in-spected to assure compliance with requirements or will be replaced.