Notifies That Baseline QA Document Review Program Conducted in Two Phases.First Phase Complete;Second Phase 75% Complete W/Projected Completion Date 800831
ML17266A193
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Haass W
Office of Nuclear Reactor Regulation
References
L-80-133, NUDOCS 8005060170
Download: ML17266A193 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NOR:8005060170 OOC ~ DATE; 80/04/30 NOTARIZED: NO DOCKET FACIL:50 250 Turkey Point Plant~ Uni t 3P Florida Power and Light C 05000250 50 .1 urkey Point Plantr Unit 4E Florida Power and Light C 05000251 0 335 S . Lucie Planti Unit iP Florida Power 8 Light Co, 05000335 AU ~ 4+ AUTHOR AFF IL I ATION UHRIGP 8 E ~ ~ Florida Power 8 Light Co.

RF C IP iNANE

~ REC IP TENT AFFILIATION HAASSE,TT' PE Quality Assurance Branch SUBJECT; Notifiesphaseal'irstthat baseline QA document review program conducted in two phase complete;second phase 75K complete w/projected completion date 800831 DISTRIBUTION CODE: DOSES COPIES RECEIVEDLLTR

~

ERCL Q TITLE: Qual i ty Assurance Di st ~ for Amdt to Repor t SIZE: j NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LT TR ENCL AC T ION; 0u QAH 2 2 INTERNAL: 01 SUB J F ILF 2 2 03 NRC POR 1 1 06 AO FOR QAal0 1 09 ASl.AP 1 1 10 RES 1 1 AOV REAC BR 1 0 ASLB 1 0 DIRECTOR DPl0l 1 0 DOR 1 0 DSE 1 0 DSS 1 0 EEB 1 0 EMERGCY PLAN BR 1 0 ENGINEERING BR 1 0 L'rrR¹1 CHIEF 0 LwR¹2 CHIEF 1 0 LETH ¹3 CHIEF 1 0 LAR¹u CHIEF 1, 0 OPERATOR LIC BR 1 0 ORB¹ 1 CHIEF 1 0 ORB¹2 CHIEF 1, 0 ORB ¹3 CH IE'F 1 0 ORB¹4 CHIEF 1 0 PLANT SYS BR 1 0 REACTOR SFTY BR 1 0 SEP BR 1 0 EXTERNAL: 11 ACRS 16 16 "I

AS<9 TOTAL NUNOBR OF COPIES REQUIRED: LTTR 45 ENCL 24

g O. BOX 529100 I'IIAIrII,FL 33152 8005 06QOI70 P ~@Pl PLORIOA POVif5R 5 LIGHT COKIPANY April 30, 1980 L-80-133 Office of Nuclear Reactor Regulation Attention: Mr. Walter P. Haass, Chief guality Assurance Branch Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Haass:

Re: Florida Power & Light Company gA Topical Re ort FPLT AR 1-76A, Pro osed Revision 3 Our letter of August 13, 1979 stated that we planned to accomplish our review of the FPL baseline gA documents within our regular two,,year audit cycle. A subsequent explanation of the details and the progress of the review in our September 6, 1979 letter was responded to by your letter of October 5, 1979.

In that letter you suggested, based on our progress to date, that the project might be completed as early as May, 1980.

The baseline document review program is being conducted in two phases. The first phase is the identification of all the requirements in the baseline documents and their comparison with the existing FPL gA Program to identify any differences. The second phase is the resolution of these differences either by changing the procedure implementing the gA requirements or by proposing acceptable alternatives to the NRC..

Over the past few months significant gA involvement in work related to I&E Bulletins79-01B, 79-02, 79-14, and I&E Notice 79-03 (on Part 21 compliance) was determined to have greater safety impact and priority than the baseline project. Our current status on the baseline project is that the first phase is complete, the second phase is 75K complete, and all of the differences that remain to be resolved are minor in nature with no significant impact on gA Program effectiveness; but we do not expect to be able to complete the project in May. Our plan now schedules the completion of this project by August 31, 1980.

As discussed with Mr. Liederbach of your staff, we are proceeding with arrangements for our previously planned meeting at your offices. At that time we will provide you with the latest status, details of the review, examples of the results obtained and answer any questions you may have on the project or the completion schedule.

Very truly yours,

% Robert E.ghrig, Vice President Advanced-Systems & Technology REU/GDW/ah P5OP' -. 55%V)~.G oeOPL5