Text

REGULATORY INFORMATION DISTRIBUTION SYSTE'l (RIDS)

ACCESSION NRR! 7910170174 OOC ~ DATE: 79/10/10 NOTARIZED! NO DOCKET 4 FACIL'50 250 Tur'key Point Pl ant r Uni t 3g Florida Power and Light C 05000250 5 ~J Tur key Point Pl ant> Uni t 4i Fl or ida Power and Light C 05000251 AU 50 3

~:AW t ~ Lucie P lant'ni t AUTHOR AFF ILIATION 1 ~ F l or ida Power R Light Co, 05000335 UHP IGe R ~ E ~ Florida Power 5 Light Co, REC IP ~ NAME RECIPIENT AFF ILIATION GA~MII Ltd Assistant Director for Operatinq Reactor ProJects

SUBJECT:

Notifies that status ept of analyses re offsite power svs 8, onsite distribution sys will be submitted 791108~in response to 790723r26 8 0808 requests'ISTRIBUTION CODE: A015S COPIES RECFIVED!LTR ENCL SIZE:

TITLE: Onsi te Emergency Power Systems C'0 N OTLS ~ ~

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EN L ID CODE/NAME LTTR ENCL ACTION: 05 BC ORB A/ 7 La Oaa 4l 1 INTERNAl.: 0 F ILE 1 02 NRC PDR 1 12 TA/ 1 13 IEE 2 15 OELD 1 16 MPA 1 17 AUX IL SYS BR 1 1R ILC SY8 RR 20 ENGR RR 1 1 21 RE AC SFTY BR 1 22 PLANT SYS BR 1 1 23 ADV REAC BR 1 24 PWR SYS BR 1 1 25 WAMBACH T 1 2e TOND I, n 1 - 1 27 MCDONALOpD 1 28 HANNONeJ 1 29 PR IN~MAN 1 30 EEB 1 1 S HANAUER 1 EXTERNAL! 03 LPDR 04 NSIC 31 ACRS 16 1 ocT c > 1979 0 A NUMBER OF. COP IES RE(JUIRED: LTTR 47 ENCL

l V

FLORIDA POWER & LIGHT COMPANY October 10, 1979 L-79-286 Office of Nuclear Reactor Regulation Attn: Mr. William Gammill Acting Assistant Director for Operating Reactors Projects Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Gammill:

Re: Turkey Point Units 3 and 4, St. Lucie Unit 1 Docket Nos. 50-250, 50-251 and 50-335 Station Electric Distribution S stems NRC letters dated July 23, 1979; July 26, 1979; and August 8, 1979 requested information concerning offsite power system and the onsite distribution system for our Turkey Point and St. Lucie nuclear power plants. The analyses which are required to respond to these requests are underway but have not yet been completed due to the demand being placed on our available engineering resources by concurrent NRC issues. Hased on our current status, we should complete our analyses by November 8, 1979.

We plan to perform tests to demonstrate the adequacy of our onsite distribution system during the next extended outage of each unit. The next extended outage is scheduled to begin in November 1979 for Turkey Point Unit 3, and May 1980 for Turkey Point Unit 4 and St. Lucie Unit 1.

FloridaPower 8 Light Company will submit a status report approximately November 8, 1979 to inform you of the results of our analyses and our plans for the final resolution of this matter.

We will notify NRC earlier of any items which are required to be reported by Facility Technical Specifications or NRC regulations.

Please feel free to call me if you should have any question in this matter.

Very truly yours, "i~(~g

~

Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/ah cc: J. P. O'Reilly, Region II Robert Lowenstein, Esouire 9" 0179 t7,h PEOPLE... SERVING PEOPLE