ML16132A489

From kanterella
Jump to navigation Jump to search
Transmittal of Annual Radiological Environmental Operating Report - 2015
ML16132A489
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/26/2016
From: Jarrell J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16132A513 List:
References
W3F1-2016-0037
Download: ML16132A489 (3)


Text

W3F1-2016-0037 April 26, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Annual Radiological Environmental Operating Report -2015 Waterford Steam Electric Station, Unit 3 (Waterford

3) Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Entergy Operations, Inc . 17265 River Road Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 jjarrel@entergy.com John P. Jarrell Ill Manager -Regulatory Assurance Waterford 3 Attached is the Annual Radiological Environmental Operating Report for the period of January 1 through December 31, 2015. This report is submitted pursuant to the requirements of Waterford 3 Technical Specification Section 6.9.1. 7. This report contains no new commitments.

Please contact John P. Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information.

Attachment:

Annual Radiological Environmental Operating Report -2015 (Including DVD)

W3F1-2016-0037 Page2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov NRC/NRR Project Manager for Waterford 3 April. Pulvirenti@nrc.gov Allyson Howie Entergy Legal, General Sr Councel AHowie@entergy.com i J Attachment to W3F1-2016-0037 Annual Radiological Environmental Operating Report -2015 (64 pages)

Subject:

Annual Radiological Environmental Operating Report -2015 Waterford Steam Electric Station, Unit 3 (Waterford

3) Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Entergy Operations, Inc . 17265 River Road Killona, LA 70057-3093 Tel 504 739 6685 Fax 504 739 6698 jjarrel@entergy.com John P. Jarrell Ill Manager -Regulatory Assurance Waterford 3 Attached is the Annual Radiological Environmental Operating Report for the period of January 1 through December 31, 2015. This report is submitted pursuant to the requirements of Waterford 3 Technical Specification Section 6.9.1. 7. This report contains no new commitments.

Please contact John P. Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information.

Attachment:

Annual Radiological Environmental Operating Report -2015 (Including DVD)

W3F1-2016-0037 Page2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov NRC/NRR Project Manager for Waterford 3 April. Pulvirenti@nrc.gov Allyson Howie Entergy Legal, General Sr Councel AHowie@entergy.com i J Attachment to W3F1-2016-0037 Annual Radiological Environmental Operating Report -2015 (64 pages)