LTR-15-0156 - Paul M. Blanch, Energy Consultant, Ltr Request Expedited 10 CFR 2.206 Directors Decision for Proposed Indian Point 42 Inch Gas Transmission Line
ML15082A419
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/17/2015
From: Blanch P
- No Known Affiliation
To: Jeff Baran, Stephen Burns, Ostendorff W, Kristine Svinicki
NRC/Chairman, NRC/OCM
Shared Package
ML15082A420 List:
References
LTR-15-0156
Download: ML15082A419 (9)


Text

Paul M. Blanch Energy Consultant 17 March 2015 USNRC Chairman Burns (Chairmam@nrc.gov)

USNRC Commissioner Baren (cmrbaren@nrc.gov)

USNRC Commissioner Svinicki (cmrsvinicki@nrc.gov)

USNRC Commissioner Ostendorff cmrostendorff@nrc.gov

Subject:

Request for expedited 10 CFR 2.206 Directors Decision for proposed Indian Point 42 inch gas transmission line.

Dear Chairman and Commissioners On October 15, 2014 I filed a 10 CFR 2.206 petition requesting enforcement action against Entergy for submitting inaccurate and incomplete information in violation of 10 CFR 50.5 and 10 CFR 50.9.

NRCs Management Directive 8.11 requires a timeliness goal to 120 days from the date of the acknowledgment letter until the date the proposed director's decision is sent out for comment.

As of todays date it has been about 150 days and I have not even received and acknowledgement letter of my petition and have been informed. I was informed by the NRCs Petition Manager today that I . . .should be hearing from us in the next couple weeks.

This is unacceptable as Indian Point Units 2 and 3 are presently operating in an unanalyzed condition that significantly degrades plant safety. This presumption is based on the fact that Entergy used the same methodology and person for the analysis of the existing gas lines located within the protected area within 600 feet of vital SSCs. This recently released analysis is severely deficient and it is assumed the same methodology was also applied to the existing lines that concluded that a gas line rupture is not considered feasible1 (less than 10e-7 per year).

1 Indian Point Unit 3 2011 UFSAR

March 17, 2015 The new analysis was obtained under appeal of FOIA 2015-0062.

The new analysis now concludes that a gas line rupture of the existing lines is feasible and based on expert analysis the probability of failure is greater than 10e-5 per year and likely greater due to the 50-year age of the existing lines.

Some of the more significant deficiencies in the NRCs analysis of the proposed gas line are:

1. The analysis relies on the EPA ALOHA code to predict the probability and consequences of fires, overpressure and radiant heat flux. The EPA document states the following:

ALOHA cannot model gas release from a pipe that has broken in the middle and is leaking from both broken ends.(Bold emphasis added by EPA)

2. None of the cited references mention 3 minutes for a gas line rupture but do discuss a 1-hour time to be considered. History and expert opinions demonstrate gas blowdown times range from 30 minutes to many hours.
3. Using more realistic gas release of one to two orders of magnitude greater, the blast radius would encompass the city water rank and possibly tanks used for core cooling. The NRC/Entergy analysis stated the switchyard and the diesel oil storage tanks are within the blast radius. Loss of the switchyard and the oil tanks would result in a station blackout (SBO) and the loss of the city water tank would render the Unit 2 SBO diesel inoperable due to loss of SBO diesel generator cooling.
4. The city water tank serves to supply back-up water to the Auxiliary Feedwater System used to cool the core during loss of AC power/SBO event.
5. The NRC stated in its analysis that the probability of an explosion after a pipe rupture is 5% yet this number is not contained in any of the cited references. Research shows almost 100% of pipe ruptures result in ignition.

March 17, 2015

6. The NRC analysis assumes that a total pipe rupture will occur in 1%

of the pipeline accidents whereas the references clearly state this occurs in 20% of the accidents.

7. The NRC analysis states: If this release is due to the underground pipe, the frequency of explosion will be further reduced by at least an order of magnitude. (Emphasis added) There is no documentation or reference supporting this non-conservative assumption.
8. The analysis for the COLA permit for Turkey Point Units 6 and 7 predict a damage radius of more than 3000 feet from a smaller line operation at a lower pressure. The NRC/Entergy analysis predicts a damage radius of 1155 feet for a line more than double in capacity operating at a higher pressure.
9. The cited reference Handbook of Chemical Hazard Analysis Procedures is apparently dated circa 1987 and does not consider subsequent major gas-line explosions such as the San Bruno, CA, Sissonville WV, Cleburne TX, Carlsbad NM, and the Edison, NJ transmission and distribution explosions.
10. The NRC calculates the probability of a gas line explosion at 7.5E-7 per year. My calculations and the invalid use of the EPA ALOHA code clearly show the probability of core damage to be orders of magnitude greater than predicted by the NRC/Entergy analysis.

These are but a few of the significant deficiencies and because of the imminent risk to the public, immediate action by the Commission is requested. I have compiled a chronology and a list of significant NRC/Entergy analytical deficiencies that I can make available to the Commission and Staff should there be any interest.

I am requesting the Commission immediately direct the NRC Staff to rescind the NRCs approval provided to FERC stating no increase in risk to Indian Point until the final resolution of my petition.

I further request the Commission to direct the NRC Staff to accelerate this 10 CFR 2.206 process using proper references and updated methodologies.

March 17, 2015 Paul M. Blanch 135 Hyde Rd.

West Hartford, CT 06117 860-236-0326 cc: Senator Schumer Senator Gillibrand Congresswoman Lowey Assemblywoman Galef

CHAIRMAN Resource From: Paul Blanch < pmblanch@Pan,eM.

Sent: Tuesday, March 17, 2015 5:28 PM To: CHAIRMAN Resource B /an ch Cc: Paul Blanch

Subject:

Fwd: Immediate concern with Indian Point analysis Attachments: 20153017 ltr to CommissicJ!1J~s . pdf; ATT00002.htm Consultant Sent to wrong email.

To: Chairmam@nrc.gov, cmrbaren@nrc.gov, cmrsvinicki@nrc.gov, cmrostendorff@nrc.gov 17 March 2015 USNRC Chairman Burns (Chairmam@nrc.gov)

USNRC Commissioner Baren (cmrbaren@nrc.gov)

USNRC Commissioner Svinicki (cmrsvinicki @nrc.gov)

USNRC Commissioner Ostendorff cmrostendorff@nrc.gov

Subject:

Request for expedited 10 CFR 2.206 Directors Decision for proposed Indian Point 42 inch gas transmission line.

Dear Chairman and Commissioners On October 15, 2014 I filed a 10 CFR 2.206 petition requesting enforcement action against Entergy for submitting inaccurate and incomplete information in violation of 10 CFR 50.5 and 10 CFR 50.9.

NRC's Management Directive 8.11 requires a "timeliness goal to 120 days from the date of the acknowledgment letter until the date the proposed director's decision is sent out for comment."

As of today's date it has been about 150 days and I have not even received and acknowledgement letter of my petition and have been informed. I was informed by the NRC's Petition Manager today that I" ... should be hearing from us in the next couple weeks."

This is unacceptable as Indian Point Units 2 and 3 are presently operating in an unanalyzed condition that significantly degrades plant safety. This presumption is based on the fact that Entergy used the same methodology and person for the analysis of the existing gas lines located within the protected area within 600 feet of vital SS Cs. This recently released analysis is severely deficient and it is assumed the same methodology was also applied to the existing lines that concluded that a gas line rupture is "not considered feasible" (less than I Oe-7 per year).

The new analysis was obtained under appeal ofFOIA 2015-0062.

The new analysis now concludes that a gas line rupture of the existing lines is feasible and based on expert analysis the probability of failure is greater than 1Oe-5 per year and likely greater due to the 50-year age of the existing lines.

Some of the more significant deficiencies in the NRC's analysis of the proposed gas line are:

1. The analysis relies on the EPA ALOHA code to predict the probability and consequences of fires, overpressure and radiant heat flux. The EPA document states the following:

2

"ALOHA cannot model gas release from a pipe that has broken in the middle and is leaking from both broken ends. "(Bold emphasis added by EPA)

2. None of the cited references mention 3 minutes for a gas line rupture but do discuss a I-hour time to be considered. History and expert opinions demonstrate gas blowdown times range from 30 minutes to many hours.
3. Using more realistic gas release of one to two orders of magnitude greater, the blast radius would encompass the city water rank and possibly tanks used for core cooling. The NRC/Entergy analysis stated the switchyard and the diesel oil storage tanks are within the blast radius. Loss of the switchyard and the oil tanks would result in a station blackout (SBO) and the loss of the city water tank would render the Unit 2 SBO diesel inoperable due to loss of SBO diesel generator cooling.
4. The city water tank serves to supply back-up water to the Auxiliary Feedwater System used to cool the core during loss of AC power/SBO event.
5. The NRC stated in its analysis that the probability of an explosion after a pipe rupture is 5% yet this number is not contained in any of the cited references.

Research shows almost I 00% of pipe ruptures result in ignition.

6. The NRC analysis assumes that a total pipe rupture will occur in I% of the pipeline accidents whereas the references clearly state this occurs in 20% of the accidents.
7. The NRC analysis states: "If this release is due to the underground pipe, the frequency of explosion will be further reduced by at least an order of magnitude." (Emphasis added) There is no documentation or reference supporting this non-conservative assumption.
8. The analysis for the COLA permit for Turkey Point Units 6 and 7 predict a damage radius of more than 3000 feet from a smaller line operation at a lower 3

pressure. The NRC/Entergy analysis predicts a damage radius of 1155 feet for a line more than double in capacity operating at a higher pressure.

9. The cited reference " Handbook of Chemical Hazard Analysis Procedures" is apparently dated circa 1987 and does not consider subsequent major gas-line explosions such as the San Bruno, CA, Sissonville WV, Cleburne TX, Carlsbad NM, and the Edison, NJ transmission and distribution explosions.

1O.The NRC calculates the probability of a gas line explosion at 7.5E-7 per year. My calculations and the invalid use of the EPA ALOHA code clearly show the probability of core damage to be orders of magnitude greater than predicted by the NRC/Entergy analysis.

These are but a few of the significant deficiencies and because of the imminent risk to the public, immediate action by the Commission is requested. I have compiled a chronology and a list of significant NRC/Entergy analytical deficiencies that I can make available to the Commission and Staff should there be any interest.

I am requesting the Commission immediately direct the NRC Staff to rescind the NRC's approval provided to FERC stating no increase in risk to Indian Point until the final resolution of my petition.

I further request the Commission to direct the NRC Staff to accelerate this 10 CFR 2.206 process using proper references and updated methodologies.

Paul M. Blanch 135 Hyde Rd.

West Hartford, CT 0611 7 4

860-236-0326 cc: Senator Schumer Senator Gillibrand Congresswoman Lowey Assemblywoman Galef 5