Category:Acceptance Review Letter
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML15062A4642015-03-12012 March 2015 Acceptance Review ML15044A0882015-02-24024 February 2015 Acceptance Review Concerning Alternative Request ML15007A4002015-01-21021 January 2015 Acceptance Review Regarding Amendment Request for Approval of Revision to the Radiation Emergency Plan ML14322A2602014-12-0101 December 2014 Acceptance Review Concerning Amendment Request for Approval of Revision to the Radiation Emergency Plan ML14248A4322014-09-18018 September 2014 Acceptance Review ML14126A1882014-05-14014 May 2014 Acceptance Review Concerning Amendment Request to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 (TAC No. MF3927)(RC-14-0032) ML14107A3612014-04-23023 April 2014 Acceptance Review Concerning Amendment Request for Approval of Revision to the Radiation Emergency Plan (TAC No. MF3830)(RC-14-0039) ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13123A1302013-05-13013 May 2013 Acceptance Review Concerning Changes to Snubber Surveillance Requirements (TAC No. MF1385) (RC-13-0037) ML13112A1852013-04-29029 April 2013 Acceptance Review Concerning Changes to Snubber Surveillance Requirements (TAC MF1383) (RC-12-0048) ML11096A0692011-04-0606 April 2011 Email Acceptance Review for March 18 Application 2024-01-25
[Table view] Category:Code Relief or Alternative
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML19091A0582019-01-10010 January 2019 Draft Application Related to April 4, 2019, Pre-Application Public Meeting for Two Proposed Relief Request ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML15176A3152015-08-12012 August 2015 Alternative Request Regarding Snubbers ML15007A1612015-01-0909 January 2015 Alternative Request During the Fourth Ten-Year Inservice Inspection Interval ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13301A7672013-11-0505 November 2013 Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902) ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13101A3332013-04-19019 April 2013 Alternative RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (TAC No. ME9851) (RC-12-0165) RC-12-0179, Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients2012-11-16016 November 2012 Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration2012-10-30030 October 2012 Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration ML12289A0502012-10-17017 October 2012 Alternative RR-III-08 for Third 10-Year Inservice Inspection Interval ML0630705402006-11-21021 November 2006 Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code., RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)2006-06-20020 June 2006 Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) ML0601004482006-01-20020 January 2006 Relief, Second 10-year Inservice Inspection, Requests for Relief RR-II-9, RR-II-10, & RR-II-12 ML0523006162005-09-0606 September 2005 Relief Request, RI-ISI Program ML0512901982005-05-10010 May 2005 Relief, Relief Request No. RR-III-01 Snubber Visual Examination and Functional Testing RC-04-0148, Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)2004-09-0808 September 2004 Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02) ML0410503842004-04-0707 April 2004 Request to Use Alternative to ASME Code Requirements in VCSNS Third Inservice Inspection Interval ML0404203862004-02-11011 February 2004 2/11/04, Virgil C. Summer Nuclear Station, Bwn, Relief Request RR-11-16 Regarding Reduced Ultrasonic Testing, TAC No. MC0108 RC-03-0234, Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)2003-11-13013 November 2003 Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262) RC-03-0223, Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)2003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262) ML0330101602003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-11,RR-II-12(0-C-02-3202) RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-192003-09-16016 September 2003 Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19 RC-03-0191, Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI2003-09-11011 September 2003 Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RC-03-0142, Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-212003-07-11011 July 2003 Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-21 ML0317402382003-06-13013 June 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883) 2024-01-25
[Table view] Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] |