Acceptance Review Concerning Changes to Snubber Surveillance Requirements (TAC MF1383) (RC-12-0048)
ML13112A185
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/29/2013
From: Ellen Brown
Plant Licensing Branch II
To: Gatlin T
South Carolina Electric & Gas Co
Brown E NRR/DORL/LPL2-1
References
TAC MF1383, RC-12-0048
Download: ML13112A185 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 29, 2013 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - ACCEPTANCE REVIEW CONCERNING CHANGES TO SNUBBER SURVEILLANCE REQUIREMENTS (TAC NO. MF1383)(RC-12-0048)

Dear Mr. Gatlin:

By letter dated April 2, 2013, the Southern Nuclear Operating Company (SNC) submitted a license amendment request for Joseph M. Farley, Units 1 and 2. The proposed amendment would revise Technical Specification (TS) Surveillance Requirement (SR) 3/4.7.7, "Snubbers,"

to conform with planned revisions to the snubber inservice inspection program. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate

T. Gatlin - 2 acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

If you have any questions, please contact the Ms. Eva Brown, at (301) 415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395 cc: Distribution via Listserv

ML13112A185 *Via e-mail OFFICE LPLlI-IIPM LPLlI-1/LA STSB\BC EPNB\BC LPLlI-1/BC NAME EBrown SFigueroa REliot TLupold* RPascarelli DATE 04118/13 04/24/13 04118113 04/18/13 04129113