Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML0317402382003-06-13013 June 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883) Project stage: Response to RAI ML0324807812003-09-0505 September 2003 Relief from ASME Boiler and Pressure Vessel Code, Section XI Relief Request 11-13 and 11-14 Project stage: Other 2003-06-13
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML19091A0582019-01-10010 January 2019 Draft Application Related to April 4, 2019, Pre-Application Public Meeting for Two Proposed Relief Request ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML15176A3152015-08-12012 August 2015 Alternative Request Regarding Snubbers ML15007A1612015-01-0909 January 2015 Alternative Request During the Fourth Ten-Year Inservice Inspection Interval ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13301A7672013-11-0505 November 2013 Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902) ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13101A3332013-04-19019 April 2013 Alternative RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (TAC No. ME9851) (RC-12-0165) RC-12-0179, Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients2012-11-16016 November 2012 Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration2012-10-30030 October 2012 Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration ML12289A0502012-10-17017 October 2012 Alternative RR-III-08 for Third 10-Year Inservice Inspection Interval ML0630705402006-11-21021 November 2006 Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code., RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)2006-06-20020 June 2006 Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) ML0601004482006-01-20020 January 2006 Relief, Second 10-year Inservice Inspection, Requests for Relief RR-II-9, RR-II-10, & RR-II-12 ML0523006162005-09-0606 September 2005 Relief Request, RI-ISI Program ML0512901982005-05-10010 May 2005 Relief, Relief Request No. RR-III-01 Snubber Visual Examination and Functional Testing RC-04-0148, Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)2004-09-0808 September 2004 Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02) ML0410503842004-04-0707 April 2004 Request to Use Alternative to ASME Code Requirements in VCSNS Third Inservice Inspection Interval ML0404203862004-02-11011 February 2004 2/11/04, Virgil C. Summer Nuclear Station, Bwn, Relief Request RR-11-16 Regarding Reduced Ultrasonic Testing, TAC No. MC0108 RC-03-0234, Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)2003-11-13013 November 2003 Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262) RC-03-0223, Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)2003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262) ML0330101602003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-11,RR-II-12(0-C-02-3202) RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-192003-09-16016 September 2003 Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19 RC-03-0191, Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI2003-09-11011 September 2003 Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RC-03-0142, Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-212003-07-11011 July 2003 Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-21 ML0317402382003-06-13013 June 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883) 2024-01-25
[Table view] Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] |
Text
Stephen A. Byrne Senior Vice President, NudearOperations 803.345.4622
- 43 A C A SCANA COMPA June 13, 2003 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST TO USE ALTERNATIVES TO ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI, RELIEF REQUEST RR-11-13 (0-C-03-0883) TAC NO. MB8781
Reference:
Stephen A. Byme (SCE&G) Letter, RC-03-0074, to NRC (Document Control Desk), dated March 31, 2003, Request to Use Altematives to ASME Boiler and Pressure Vessel Code, Section Xl South Carolina Electric & Gas Company (SCE&G) hereby submits the attached response to the subject request for additional information (RAI) regarding Relief Request RR-11-13.
This letter offers clarification to the referenced submittal letter for Relief Request RR-11-13. This submittal is in response to a telephone conversation between SCE&G, the NRC VCSNS Project Manager, and the NRC technical reviewer.
Should you have any questions, please call Mr. Mel Browne at (803) 345-4141.
Very truly yours, Stephen A. Byme JT/SAB/dr Attachment c: N. 0. Lorick R. W. Bullard N. S. Cams A. R. Caban T. G. Eppink (w/o Attachment) NRC Resident Inspector R. J. White NSRC L. A. Reyes RTS (0-C-03-0883)
K. R. Cotton File (810.19-2)
K. M. Sutton DMS (RC-03-0123)
AoC?
SCE&G I Virgil CSummer Nuclear Sttion
- P.O.Box 88 . Jenkinsville, South Ccroina 29065 *T(803) 345.5209 .uww.scona.om
Document Control Desk Attachment RC-03-0123 Page 1 of 2 South Carolina Electric & Gas Company (SCE&G)
Virgil C. Summer Nuclear Station (VCSNS)
Response to NRC Request for Additional Information (RAI)
Regarding Inservice Inspection Relief Request RR-11-1 3 Relief Request to use Code Cases 573 and 600--(TAC NO. MB8781)
- 1. The licensee should address the applicability of the Code Case 573 for special repair welding process (application of temperbead technique) specified in IWA-4500 of ASME Section Xl. The licensee should ensure that each welder that is assigned to perform the temperbead repair is qualified in accordance with the received procedure qualification requirements.
Response 1:
As noted in the submittal of March 31, 2003, SCE&G shall implement the requirements of Code Case N-573 for all processes, including the temperbead technique as described in IWA-4500, when applicable.
"The specific requirements listed in Code Case N-573 shall be met by the Owner that performed the procedure qualification, and by the Owner intending to use the PQR. These requirements are:
(f) The Owner accepting the completed PQR shall demonstrate technical competence in application of the received PQR by completing a performance qualification test using the parameters of a resulting WPS."
- 2. The licensee should also clarify the applicability of the Code Case 600 for special repair welding process (application of temperbead technique) specified in IWA-4500 of ASME Section Xl. The licensee should ensure that the welders are qualified in accordance with IWA-4512.2 or IWA-4522.2 of ASME Section Xl when the repair weld is subjected to physical obstruction.
Response 2:
As noted in the submittal of March 31, 2003, SCE&G shall implement the requirements of Code Case N-600 for all WPQ/BPQ qualifications, including the temperbead technique as described in IWA-4500, when applicable.
Document Control Desk Attachment RC-03-0123 Page 2 of 2 "The specific requirements listed in Code Case N-600 shall be met by the Owner who performed the qualification, and by the Owner intending to use the WPQ/BPQ. These requirements are:
(d) The Owner accepting the WPQ/BPQ shall require each welder, welding operator, brazer, or brazing operator to demonstrate proficiency by completing a renewal qualification test in accordance with QW-322.2(a) or QB-322 (b)."
- 3. The quality assurance requirements are not specified in IWA-4142(a) of ASME Section Xl, 1989 Edition.
Response 3:
SCE&G submittal of March 31, 2003, presented requirements specified by Code Case N-600. In particular; "The specific requirements listed in Code Case N-600 shall be met by the Owner who performed the qualification, and by the Owner intending to use the WPQ/BPQ. These requirements are:
(h) The Owner accepting the WPQ/BPQ shall comply with the Quality Assurance requirements of IWA-4142(a)."
Per teleconference with the NRC on May 27, the NRC reviewer reiterated RAI question 3 stating that this requirement referenced an incorrect paragraph of the Code.
SCE&G proposes to amend this requirement to state:
The Owner accepting the WPQ/BPQ shall comply with the Quality Assurance requirements of IWA-4400.