Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24026A28025 January 2024Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email)
ML23244A23518 September 2023Request to Use a Subsequent Edition of the ASME Code, Section XIIncorporated by reference
ML23062A72931 March 2023Deferral of Pressurizer and Steam Generator Weld ExaminationsHydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Finite Element Analysis
ML20248H3782 December 2020Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078)Incorporated by reference
ML19242E0276 September 2019Relief Request (RR-4-22) for Use of ASME Code Case N-513-4Time of Discovery
Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
ML19140A4734 June 2019Relief Request (RR-4-23) to Utilize Code Case N-513-4Through-Wall Leak
Through-Wall Leakage
ML19003A18818 January 2019Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05Through-Wall Leak
ML19091A05810 January 2019Draft Application Related to April 4, 2019, Pre-Application Public Meeting for Two Proposed Relief Request
ML18345A06017 December 2018Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14)Incorporated by reference
ML18296A1118 November 2018Relief Request (RR-4-15) for Use of ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...8 October 2018(Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...Stroke time
Power-Operated Valves
RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange14 September 2018(Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System FlangeThrough-Wall Leak
Through Wall Leak
RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..14 August 2018(Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..Through-Wall Leak
Through Wall Leak
ML18186A58819 July 2018Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds.Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Exemption Request
Dissimilar Metal Weld
DM weld
ML17031A0159 February 2017Relief from the Requirements of the ASME Code Regarding Service Water System Piping
ML16161A0451 July 2016Relief from the Requirements of the ASME CodeDissimilar Metal Weld
ML16124A8976 May 2016Relief from the Requirements of the ASME CodeIncorporated by reference
ML15176A31512 August 2015Alternative Request Regarding SnubbersIncorporated by reference
ML15007A1619 January 2015Alternative Request During the Fourth Ten-Year Inservice Inspection Interval
ML14079A61424 March 2014Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04
ML13301A7675 November 2013Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902)Boric Acid
Incorporated by reference
Grace period
ML13177A0788 July 2013Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068)
ML13101A33319 April 2013Alternative RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (TAC No. ME9851) (RC-12-0165)Nondestructive Examination
Incorporated by reference
RC-12-0179, Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients16 November 2012Relief Request RR-III-09 Request for Information Fatigue Crack Growth and TransientsWeld Overlay
RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration30 October 2012Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head PenetrationOperating Basis Earthquake
Liquid penetrant
ML12289A05017 October 2012Alternative RR-III-08 for Third 10-Year Inservice Inspection IntervalBoric Acid
High Radiation Area
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML06307054021 November 2006Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.,Incorporated by reference
Dissimilar Metal Weld
RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)20 June 2006Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)Dissimilar Metal Weld
ML06010044820 January 2006Relief, Second 10-year Inservice Inspection, Requests for Relief RR-II-9, RR-II-10, & RR-II-12Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML0523006166 September 2005Relief Request, RI-ISI ProgramLarge early release frequency
Exemption Request
ML05129019810 May 2005Relief, Relief Request No. RR-III-01 Snubber Visual Examination and Functional TestingIncorporated by reference
RC-04-0148, Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)8 September 2004Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)Probabilistic Risk Assessment
Large early release frequency
ML0410503847 April 2004Request to Use Alternative to ASME Code Requirements in VCSNS Third Inservice Inspection Interval
ML04042038611 February 20042/11/04, Virgil C. Summer Nuclear Station, Bwn, Relief Request RR-11-16 Regarding Reduced Ultrasonic Testing, TAC No. MC0108Incorporated by reference
RC-03-0234, Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)13 November 2003Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)
RC-03-0223, Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)23 October 2003Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)
ML03301016023 October 2003Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-11,RR-II-12(0-C-02-3202)
RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-1916 September 2003Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19
RC-03-0191, Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI11 September 2003Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI
RC-03-0142, Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-2111 July 2003Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-21Dissimilar Metal Weld
DM weld
ML03174023813 June 2003Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883)