Text

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000259/2012004, 05000260/2012004 AND 05000296/2012004 FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 The following is a feeder for integration into the Browns Ferry Nuclear Plant Inspection Report Nos. 05000259/2012004, 05000260/2012004 and 05000296/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12199A022 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 2

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Tennessee Valley Authority, Radiological Emergency Plan, Revision 97 3

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000325/2012004 AND 05000324/2012004 FOR BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 The following is a feeder for integration into the Brunswick Steam Electric Plant Inspection Report Nos. 05000325/2012004 and 05000324/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

2. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12177A270, ML12180A514 and ML12194A109 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 4

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Radiological Emergency Response Plan, Revision 81 OPEP-02.6.30, Activation and Operation of the Alternate Emergency Facility, Revision 3 OPEP-02.6.26, Activation and Operation of the Technical Support Center, Revision 27 EMG-NGGC-0002, Off-Site Dose Assessment, Revision 3 5

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000413/2012004 AND 05000414/2012004 FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 The following is a feeder for integration into the Catawba Nuclear Station Inspection Report Nos. 05000413/2012004 and 05000414/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

3. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12180A546 and ML12202A100 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 6

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 12-1, AP/0/A/5500/046, Hostile Aircraft Activity, Revision 4 7

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000302/2012004 FOR CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 The following is a feeder for integration into the Crystal River Nuclear Generating Plant Inspection Report No. 05000302/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

4. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12152A054, ML12180A514 and ML12216A351 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 8

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Action Level Bases Manual, Revisions 13 and 14 Radiological Emergency Response Plan, Revision 31 EMG-NGGC-0002, Off-Site Dose Assessment, Revision 3 EM-204B, Off-site Dose Assessment During Radiological Emergencies for Monitored Releases- Mixtures (User Instructions for RASCAL), Revision 41 9

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000348/2012004 AND 05000364/2012004 FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Joseph M. Farley Nuclear Plant Inspection Report Nos. 05000348/2012004 and 05000364/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

5. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12188A352 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 10

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes NMP-EP-110, Emergency Classification Determination and Initial Action, Version 4.0 11

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000321/2012004 AND 05000366/2012004 FOR EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Edwin I. Hatch Nuclear Plant Inspection Report Nos. 05000321/2012004 and 05000366/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

6. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12188A352 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 12

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes NMP-EP-110, Emergency Classification Determination and Initial Action, Version 4.0 13

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000369/2012004 AND 05000370/2012004 FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 The following is a feeder for integration into the McGuire Nuclear Station Inspection Report Nos. 05000369/2012004 and 05000370/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

7. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12165A454 and ML12173A176 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 14

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Sections D, E, H, I, J; Revision 12-01 RP/0/A/5700/000, Classification of Emergency, Revision 19 RP/0/A/5700/011, Conducting a Site Assembly, Site Evacuation or Containment Evacuation, Revision 17 HP/0/B/1009/029, Initial Response On-Shift Dose Assessment, Revision 10 15

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000338/2012004 AND 05000339/2012004 FOR NORTH ANNA POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the North Anna Power Station Inspection Report Nos. 05000338/2012004 and 05000339/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

8. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12174A361 and ML121910411 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 16

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes North Anna Power Station Emergency Plan, Revision 37 Emergency Action Level Technical Bases Document, Revision 3 17

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000269/2012004, 05000270/2012004 AND 05000287/2012004 FOR OCONEE NUCLEAR STATION UNITS 1, 2 AND 3 The following is a feeder for integration into the Oconee Nuclear Station Inspection Report Nos. 05000269/2012004, 05000270/2012004 and 05000287/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

9. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12173A113 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 18

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Oconee Nuclear Station Emergency Plan, Revision 2012-02 19

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000261/2012004 FOR H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 The following is a feeder for integration into the H. B. Robinson Steam Electric Plant Inspection Report No. 05000261/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

10. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12180A514 and ML12194A240 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 20

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EMG-NGGC-0002, Off-Site Dose Assessment, Revision 3 EPCLA-04, Emergency Action Level Technical Bases Document, Revision 4 EPTSC-01, Site Emergency Coordinator, Revision 17 21

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000327/2012004 AND 05000328/2012004 FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Sequoyah Nuclear Plant Inspection Report Nos. 05000327/2012004 and 05000328/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

11. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121910329 and ML12199A022 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 22

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EPIP -1, Emergency Plan Classification Matrix, Revision 46 Tennessee Valley Authority, Radiological Emergency Plan, Revision 97 23

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000395/2012004 FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 The following is a feeder for integration into the Virgil C. Summer Nuclear Station Inspection Report No. 05000395/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

12. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12194A672 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 24

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EPP-001, Activation and Implementation of Emergency Plan, Revision 30 25

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000280/2012004 AND 05000281/2012004 FOR SURRY POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Surry Power Station Inspection Report Nos. 05000280/2012004 and 05000281/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

13. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121920487 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 26

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 56 Emergency Action Level Technical Bases Document 27

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000250/2012004 AND 05000251/2012004 FOR TURKEY POINT NUCLEAR PLANT UNITS 3 AND 4 The following is a feeder for integration into the Turkey Point Nuclear Plant Inspection Report Nos. 05000250/2012004 and 05000251/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

14. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12184A052 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 28

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes 0-EPIP-20133, Operations Support Center (OSC) Activation and Operation, Revision 1 0-EPIP-20101, Duties of Emergency Coordinator, Revision 6 29

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000424/2012004 AND 05000425/2012004 FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Vogtle Electric Generating Plant Inspection Report Nos. 05000424/2012004 and 05000425/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

15. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12188A352 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 30

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes NMP-EP-110, Emergency Classification Determination and Initial Action, Version 4.0 31

OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000390/2012004 FOR WATTS BAR NUCLEAR PLANT UNIT 1 The following is a feeder for integration into the Watts Bar Nuclear Plant Inspection Report Nos. 05000390/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 3rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

16. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12199A022 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute 32

approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b. Findings No findings were identified.

ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Tennessee Valley Authority, Radiological Emergency Plan, Revision 97 33